DriversRecommendedOutdated drivers can make a good PC feel brokenScan driver issues before chasing fixes manually.Scan NowEarly Black FridayAmazon USEarly Black Friday picks are worth checking nowAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run Scan×
FREEDOM251

Freedom251 › Blog

NASA to change how it selects science missions

By Freedom251 Team · · 5 min read

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

NASA announced Competition Model 2.0 (CM2.0) on October 21, 2026, changing how the Science Mission Directorate competes and selects missions. The reform does not create one process for every project: flagship management stays the same, several medium-size mission classes keep two-step competitions with a lighter science-first opening, and smaller mission classes move to a single-step contest. NASA projects faster selections and less proposal work, but those figures are forecasts rather than demonstrated results, and implementation will occur in stages.

What is NASA changing about science mission selection?

Associate Administrator Nicola Fox summarized the principle behind CM2.0 as: “CM2.0 starts from a simple idea: compete on the science first.” NASA says teams should not have to complete extensive engineering, cost and implementation work before the agency knows which scientific idea deserves further development.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The new model therefore assigns different competition structures to different mission classes. Early submissions for some missions will emphasize the scientific case, a science implementation plan and a proof-of-concept design. Detailed technical and cost work is deferred until it is needed to distinguish finalists or support an implementation decision.

NASA says the approach is intended to reduce the burden on proposal teams, shorten competitions and make delivery more predictable. It has not yet published post-reform performance data, so the expected improvements should be read as agency projections.

Popular on Amazon
Smart Watch for Men Women Compatible with iPhone Samsung Android Phone 1.69 inch Full Touch Screen IP68 Waterproof Bluetooh Fitness Tracker Heart Rate/Sleep Monitor (Black)
  • 【IP68 Waterproof Multifunctinal Smart Watch】Torjalph fitness activity tracker smart watch is IP68 waterproof technology ,you can wear it when swimming,handwashing,it's rain-proof which means that you perform multiple exercise modes outside without worrying about sweat or rain corroding your fitness smart watch,and this watch equipped with a 230 mAh large capacity battery magnetic charging ,and this sports activity tracker watch can be used 5-7 days If fully charged.
  • 【Larger 1.83'' Full Screen Watch & Multi-dial Selection】1.83 inch full HD color touch screen smart watch for men / women provides excellent 240*284 resolution image quality ,This Bluetooth smart watch offers a better touch experience and remarkable immersion and ,more than 200 watch faces for you to choose from App"Da Fit ", you can change the dial style according to your mood to wear keeping the world on your wrist
  • 【Accurate Activity Tracker Smart Watch 】sports watch activity tracker uses sweat and dust resistant breathable silicone strap, our Fitness Tracker Smart Watch for Android iOS Phones supports 12 sports modes,walking,running,bicycle,swimming,badminton,basketball,football,rope skipping. This bluetooth calls smart watch for men women is lightweight and stylish, bringing more convenient and relaxing sports experience while also providing more protection.
  • 【Your 24 Hour Personal Daily Health Monitor】Fitness watch for women men full touch screen IP67 waterproof bluetooth smartwatch for Android iOS Phones with heart rate blood pressure monitor multifunction Andriod smart watch with steps counter sleep monitor sports fitness watch, monitoring blood oxygen saturation allows you to understand your physical condition in real time to track fitness progress ,to know your health status in time.
  • 【More Functions Bluetooth Call Smart Watch】This fitness activity smart watch full screen for iPhone and Android phones includes a bunch of new features including:The bluetooth smart watch can hang up the phone, receive and display WhatsAPP /Text /Facebook /Twitter /Messenger reminder.Support sedentary reminder, alarm clock, stopwatch, timer,weather information,music control, remote camera control compatible with Android 5.0 and above or iOS 9.0 and above smartphones.

Which NASA missions are affected by Competition Model 2.0?

Mission class Competition structure What changes Implementation and partners
Flagships Existing management approach CM2.0 does not change management of the largest missions. NASA assigns overall mission leadership to a NASA Center and competes science teams and instruments through targeted solicitations.
Astro-Probes, New Frontiers and Discovery Accelerated two-step competition Step 1 requests a science case, science implementation plan and proof-of-concept mission design; NASA says this removes roughly half the material currently required in an Announcement of Opportunity response. A mission implementation study follows. Down-selection to one mission occurs partway through Phase A, and the selected mission completes Phase A before Key Decision Point B (KDP-B). Goddard or JPL may manage the study; in some cases NASA may award it to Johns Hopkins University Applied Physics Laboratory under Goddard management.
MIDEX and Earth Explorer Two-step competition retained Implementation is opened to a broader field, including universities and industry partners. Organizations are evaluated on past performance with projects of similar complexity and cost. Principal-investigator teams may request pairing with Goddard or JPL at Step 1 selection.
SMEX, Missions of Opportunity, Earth Venture, hosted payloads and rideshares Single-step competition Smaller review teams and virtual site visits replace the previous approach. Competitions are open to a broad range of implementing organizations.

How much faster does NASA expect selections to become?

NASA has supplied two different projections for two different parts of the process. They should not be combined into one universal “40 percent faster” claim.

  • Astro-Probes, New Frontiers and Discovery: NASA projects up to a 45% reduction in the time from an Announcement of Opportunity to step-two selection—from 35 months to about 19.5 months (NASA Science Mission Directorate, 2026).
  • SMEX, Missions of Opportunity, Earth Venture, hosted payloads and rideshares: NASA projects up to a 40% reduction in time to final selection—from about 32 months to about 19 months (NASA Science Mission Directorate, 2026).

The first estimate ends at step-two selection for the accelerated two-step classes. The second concerns final selection for classes moving to one step. NASA describes both as estimates; the announcement does not establish that the new process has achieved either result.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What will teams submit under the lighter first step?

For Astro-Probes, New Frontiers and Discovery, Step 1 is designed to test whether a proposal presents a compelling scientific opportunity and a credible path to investigate it. NASA lists three core elements:

  1. A compelling science case explaining the question, its importance and why the proposed mission can answer it.
  2. A science implementation plan showing how observations, instruments and analysis would address that question.
  3. A proof-of-concept mission design demonstrating that the concept is plausible without requiring a complete, mature implementation package.

After Step 1, NASA expects a mission implementation study to provide the engineering, cost and management information needed for down-selection. Teams that are not selected are released from carrying their concepts through the rest of Phase A on their own, which NASA says should reduce wasted effort.

Also popular on Amazon
Sale
New Bee Guitar Cable 10ft Electric Instrument Bass AMP Cord | 6.35mm Jack, Durable Design, Stage and Home Studio Use, Low Noise Shielded Electric Cord for Bass, Keyboard, Amp, Mixer
  • [Low Noise High Fidelity] New bee guitar cord with 22AWG oxygen-free-copper center conductors provides enhanced signal transfer, the PVC insulation material and the high-density stranded copper double shield provide noise rejection for quiet operation
  • [Ideal for Choice] New bee 1/4 straight and right angle metal connectors, ensures a secure connection in any instrument, pedal, or amp jack. L shape great fro on stage guitar stands
  • [Wide Compatible] Suitable for mixer, power amplifier, microphone, effector, decoder, equalizer, electoronic organ, electric guitar, electric bass and other electronic equipments. Widely used in the installation of smart home, karaoke speaker, professional stage audio, etc
  • [Easy Disassemble] Making incidental repairs quick and easy! Very nice, flexible cable
  • [Dont Hesite to Order] 24 hours customer services and professional technology team are standing by

Does the faster model remove NASA’s cost and schedule oversight?

No. NASA says rigorous cost and schedule controls remain mandatory for every mission class. Breaching control thresholds can lead to consequences up to and including mission termination. CM2.0 changes when and how information is developed for competition; it does not waive accountability after a mission is selected.

NASA also expects mission and implementation teams to use commercial capabilities—such as commercial spacecraft buses, subsystems and multi-mission operations—when they offer a technical or cost advantage. This is a procurement and engineering policy, not a recommendation of consumer products.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

When will the new NASA process take effect?

NASA says CM2.0 will be implemented in stages and refined over time. The general announcement does not replace the rules, eligibility requirements or dates in a specific Announcement of Opportunity.

NASA’s Science Office for Mission Assessments (SOMA) supports Announcement of Opportunity development and the technical, management and cost evaluation of proposals and Phase A concept studies. SOMA cautions that its solicitation planning dates are projections and that NASA cannot guarantee a planned release date. Prospective applicants should therefore rely on the active solicitation for authoritative instructions.

Also popular on Amazon
Sale
BSIMB 15.6" Digital Family Calendar & Chore Chart, No Subscription Fees | Sync Family Schedules, Chores, Routines, Meal Planning, Rewards, Focus Timer and Photos in One Kid-Friendly Calendar
  • Digital Family Calendar: BSIMB digital calendar wall touch screen puts an end to your chaotic life. Designed for busy families, the digital calendar keeps you organised and in step with your family. Assign different colours and tasks to each family member to make family scheduling easier and more intuitive.
  • Easy Setup and Auto-Sync: Plug in, connect to WLAN and auto-syn your electric calendar in minutes. Digital wall calendar compatible with Google calendar, iCloud calendar, Outlook calendar, Cozi calendar and Yahoo calendar. Add events directly on the device or through the ecalendar app. Electronic calendar stays current whether you're at work or traveling—no manual updates needed.
  • All-In-One Home Assistant: Smart calendar builds habits and encourage independence with personalised chores. Display daily meal plan to reduce the daily ‘What's for dinner?’ stress. To-do lists keep track of everything you want. Turning chores into valuable achievements with stars and rewards, making life easier and more enjoyable.
  • Manage Anytime Anywhere: BSIMB electronic calendar for family stay connected with the powerful ecalendar app. Access and manage your digital wall calendar anytime, anywhere with free features like stars & rewards, photo screensaver, chore charts, meals plans, to-do lists etc. Electronic planner paid features like Magic Import tailor advanced tools for users with special needs.
  • Stay in Touch with Loved Ones: Share photos or videos from your phone to electronic wall calendar with app, instantly update your life moment, and keep in touch with your family, especially those who are far away; you can also surprise your smart calendar digital wall by sending him a wish card; it's also great for keeping tech-illiterate elders in touch with the youngsters.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What does CM2.0 mean for universities, companies and principal investigators?

The effects depend on the mission class. Teams pursuing Astro-Probes, New Frontiers or Discovery may be able to compete initially without funding a full-scale design effort, but they must make the science case and proof-of-concept unusually clear. MIDEX and Earth Explorer applicants face broader implementation competition and will need evidence of successfully delivering projects with comparable complexity and cost. For SMEX, Earth Venture and related classes, organizations that can assemble a credible end-to-end implementation proposal may enter a single, more compact contest.

NASA’s stated goal is to let scientific merit carry more weight than the size of a proposing organization. The later implementation study still introduces NASA Center involvement and technical scrutiny, so a strong idea does not eliminate the need for credible management and engineering capability.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How should applicants interpret the announcement?

Treat CM2.0 as a framework, not a standing solicitation. Before preparing a proposal, identify the mission class, read the current Announcement of Opportunity, confirm whether a NASA Center partnership is required or optional, and check the applicable Phase A, cost and schedule rules. Until NASA issues class-specific solicitations, exact submission content and dates remain uncertain.

Frequently Asked Questions

Will NASA stop using Announcements of Opportunity?

No. NASA’s reform changes how different mission classes are competed, but Announcements of Opportunity remain part of the acquisition process. The agency says prospective teams must follow the requirements and dates in each active solicitation.

What is KDP-B in NASA mission development?

Key Decision Point B is a formal NASA review used to decide whether a mission is ready to move from formulation into the next development phase. Under the accelerated model, the selected mission is expected to complete Phase A before reaching KDP-B.

Can a university lead a mission under the new model?

Eligibility depends on the mission class and the specific solicitation. NASA says MIDEX and Earth Explorer implementation will be open to universities and industry partners, while principal-investigator teams may request pairing with Goddard or JPL at Step 1 selection.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Why are NASA’s time-savings numbers not proof yet?

CM2.0 was announced in October 2026, and NASA has not reported completed competitions under the revised rules. The 45% and 40% figures are the agency’s projections for different selection intervals, not independently measured outcomes.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 12, 2026 3:40 pm GMT+0530.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
PC Slower Than It Used to Be?Free scan - under a minute
Outdated Drivers Are Slowing You DownFree scan - exact matches

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.