Quick wins for a faster PC:
Clear out junk files and repair common Windows errorsFree Scan →Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Repair Windows errors before they cause bigger problemsFix Now →Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
Li Ming Development Construction Co., Ltd. (Taipei Exchange: 6212) does not currently have a dependable, publicly reported analyst-consensus earnings forecast in the available coverage. Simply Wall St lists the average analyst count as N/A and says there is insufficient history and no analyst forecast to calculate future earnings reliably. That means investors should not treat a platform fair-value figure or a simple growth extrapolation as a consensus price target.
The latest reported results located are for the second quarter and six months ended June 30, 2026. They show TWD 335.84 million of second-quarter sales, TWD 57.94 million of net income and TWD 0.57 basic EPS; first-half sales were TWD 551.4 million, net income TWD 98.34 million and basic EPS TWD 0.96.
As an Amazon Associate I earn from qualifying purchases.
PC Slower Than It Used to Be?
A free scan shows the junk files, broken settings and background clutter dragging Windows down - then fixes them in one click.Free scan · Windows 10 & 11Crashes, No Sound, or Screen Glitches?
Random freezes, missing sound and display glitches usually trace back to one bad driver. Find and replace yours safely.Free scan · under a minuteWhat are the latest 6212 stock estimates?
There is no verified, named analyst consensus estimate for Li Ming Development Construction in the accessible coverage. The most defensible numbers are therefore historical reported results, not forecasts.
| Period | Revenue or sales | Net income | Basic EPS | Status |
|---|---|---|---|---|
| FY2025 | NT$1.69 billion | NT$403.7 million | NT$3.96 | Reported historical figures |
| Q2 2026 | TWD 335.84 million | TWD 57.94 million | TWD 0.57 | Reported result |
| H1 2026 | TWD 551.4 million | TWD 98.34 million | TWD 0.96 | Reported result |
The FY2025 figures are reported by Simply Wall St, while the Q2 and H1 2026 figures are from S&P Capital IQ. TWD and NT$ refer to Taiwan dollars; the figures should not be mixed with estimates from another currency, accounting basis or reporting period.
Popular on Amazon
Does Li Ming Development Construction have an analyst forecast?
Not one that can be treated as a reliable public consensus. Simply Wall St’s forecast page shows “Avg. No. Analysts” as N/A and states that the company has neither enough past data nor analyst forecasts for dependable future-earnings calculations.
Investing.com has a 6212 forecast and price-target page, but the accessible material presents model-based fair-value categories rather than a dated, named group of covering analysts. Any number displayed there should be labeled a platform model estimate, not management guidance or consensus.
Why are 6212 revenue and earnings difficult to extrapolate?
Property developers often recognize revenue when projects are completed, delivered or sold. A single handover can therefore make one quarter unusually strong, while a quarter between projects can look weak without indicating a permanent change in demand.
Also popular on Amazon
- Comes with secure packaging
- Easy to read text
- It can be a gift option
StockAnalysis lists TWD 182.53 million of revenue for Q3 2025 and annual 2024 revenue of TWD 3.79 billion. The wide difference between those periods illustrates why year-over-year comparisons, project schedules and delivery timing matter more than applying a smooth quarterly growth rate.
Questions to check before building a scenario
- Which projects are scheduled for completion or customer handover during the forecast period?
- Are the figures consolidated and prepared under the same accounting standard?
- Does the comparison use a full year, a quarter, or a trailing-twelve-month period?
- Could changes in property prices, construction costs or financing rates alter margins?
What do the reported 2026 results say about earnings momentum?
Through June 30, 2026, Li Ming reported TWD 551.4 million of sales and TWD 98.34 million of net income, equivalent to TWD 0.96 basic EPS. Q2 contributed TWD 335.84 million of sales, TWD 57.94 million of net income and TWD 0.57 EPS. These are actual results, not a forecast for the remaining two quarters, so they cannot by themselves establish full-year 2026 earnings.
For context, FY2025 revenue was NT$1.69 billion, net income NT$403.7 million and EPS NT$3.96. Comparing half-year 2026 with FY2025 requires care because the periods are not equivalent and property delivery timing can shift revenue between years.
Also popular on Amazon
What does Li Ming Development Construction do?
Li Ming Development Construction is a Taiwan-based developer listed on the Taipei Exchange under ticker 6212. Its activities include real-estate development, construction performed through entrusted contractors, property leasing and sales, building-material wholesale and retail, and interior-decoration services. The company profile lists Hsinchu City as headquarters, a 1977 founding date, and a name change from M.E.T. Technology Co., Ltd. in January 2007. Its fiscal year runs from January through December.
What balance-sheet risks matter for a 6212 forecast?
A 2026 S&P Global Market Intelligence snapshot displays TWD 6.63 billion of debt and TWD 154.44 million of cash, a debt-to-equity ratio of 1.76 and an Altman Z-score of 1.3. These are market-data snapshots, not a prediction of insolvency, but they make refinancing, project inventory and operating cash flow central to any valuation.
- Debt service: higher interest rates or delayed project receipts can pressure cash available for repayments.
- Cash conversion: accounting profit may arrive before customer collections, so operating cash flow deserves separate review.
- Inventory and commitments: land and construction commitments can tie up capital while projects await delivery.
- Concentration: a small number of large projects can make annual results unusually dependent on one handover date.
How should investors use a 6212 price target?
Start by identifying whether a displayed figure is a reported market price, an analyst target, a company projection or a platform-generated valuation. Only the second category is an analyst consensus, and the available evidence does not establish one for 6212.
Also popular on Amazon
If you build an independent scenario, state the cutoff date, use TWD, specify revenue, net income or EPS, and identify whether the result is consolidated. Tie assumptions to project-delivery timing and show how debt, cash and operating cash flow affect the outcome. Present a range rather than a single “target” when the project calendar is uncertain.
Recommended Free Tools
What should be checked before relying on a new estimate?
- Check the latest Taipei Exchange and company filings for revised quarterly figures.
- Confirm whether a newly published forecast names analysts and gives a publication date.
- Separate reported Q2/H1 2026 results from any full-year estimate.
- Recalculate leverage using the same reporting date for debt and cash.
- Review project completion, sales and handover disclosures before extrapolating revenue.
Frequently Asked Questions
Where can I find Li Ming Development Construction’s official financial filings?
Use the Taipei Exchange issuer-information and filing services, then verify the company name and ticker 6212. Filings are the authoritative place to confirm later quarterly results, balance-sheet changes and project disclosures.
Is TWD 0.96 the forecast EPS for 2026?
No. TWD 0.96 is the reported basic EPS for the six months ended June 30, 2026. It does not include July–December performance and should not be presented as a full-year estimate.
Also popular on Amazon
Why can annual revenue fall even when a property project is selling well?
Revenue recognition may wait for construction completion, legal delivery or another accounting milestone. Sales bookings and recognized revenue can therefore occur in different periods.
What would count as a genuine 6212 analyst consensus?
A consensus should identify multiple named covering analysts, a publication or update date, the metric being forecast and the number of contributing analysts. A platform label without those details is better treated as a model output.
The Tool Desk
Outbyte Driver Updater FREEScan for outdated or missing drivers - takes under a minuteDriver Scan →Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

