What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
Davis-Bacon prevailing wage rates in a spreadsheet should start with the official SAM.gov Wage Determinations search, not with a county-only lookup. Search by the cited wage-determination (WD) number when you have one; otherwise choose the Davis-Bacon category for public-building or public-works laborers and mechanics. Then record the WD identifier, every locality named in the document, construction type, wage and fringe schedules, revision details, source URL, and retrieval date. The key caution is that a county is not a one-to-one key: one determination can cover several counties and independent cities. SAM.gov provides individual document downloads, but the reviewed official pages do not establish a supported all-counties CSV/XLSX export or bulk API.
What is a Davis-Bacon wage determination?
SAM.gov defines a wage determination as “a set of wages, fringe benefits, and work rules that the U.S. Department of Labor has ruled to be prevailing for a given labor category in a given locality.” A determination is therefore more than a single hourly rate. It is a dated schedule of classifications, basic wages, fringe benefits, and applicable notes for a defined geographic area and construction type.
As an Amazon Associate I earn from qualifying purchases.
Free tools Windows power users keep installed
One-click scans. No signup required.
For a public construction project, use the Davis-Bacon (DBA) category in SAM.gov. Do not substitute a Service Contract Act (SCA) determination: SCA records cover service employees, while Davis-Bacon records cover laborers and mechanics on covered public building and public-works contracts. The Wage Determinations landing page provides the category entry point, WD-number search, and an “active only” option.
How do I find a Davis-Bacon determination for my county?
Start with the project documents. If they cite a WD number, search that identifier first. If they do not, use the Davis-Bacon category and narrow the live SAM.gov results using the state and locality information available in the current interface. SAM.gov’s labels and filters can change, so verify the controls on the page rather than relying on an old click-by-click screenshot.
Popular on Amazon
- 【90 Degree Full Function USB C Adapter】Supports the latest USB4 standard for up to 40Gbps of bandwidth, 8K video support, and up to 240W Fast charging; Support USB PD 3.1 Extended Power Range (EPR) including 140W, 180W and 240W. Your productivity is easily doubled. *Warm Tip: For the best fit, please make sure the USB-C port is fully exposed; thick or bulky cases may affect compatibility.
- 【Reliable Quality】Made from high-quality, scratch-resistant aluminum alloy, delicate metal frame. get excellent wear resistance and heat dissipation. Non-Slip Design for easier insertion and removal.
- 【Small and portable】Ultra thin size, ultra compact design, a petite physique that matches the minimalist design of your modern laptops. Coming with a slim figure that won't block the port next to the one it's plugged into.
- 【Compatibility】Widely work with most usb c, thunderbolt 4/3 devices. Compatibilit for ROG Ally, Steam Deck, Switch, MacBook Pro, Quest 3 VR headset, Surface Book 2, iPhone 18/17/16/15, Samsung Galaxy S23/S22/S21, Note 20/10, Google Pixel, ChromeBook, etc.
- 【Excellence Customer Support】If you experience any issues or cable failure, simply reach out to our dedicated customer service team. We provide a prompt response within 18 hours, providing you with the necessary technical support to resolve any concerns.
- Open the official search. Go to SAM.gov Wage Determinations. Confirm that you are in the Davis-Bacon area, not the SCA area.
- Search by WD number when known. Enter the complete identifier from the solicitation, contract, agency paperwork, or an earlier determination. Searching the identifier reduces the chance of selecting a similarly named record.
- Otherwise select the Davis-Bacon category. Choose the state and locality information offered by the live search. Treat a county selection as a starting point, not proof that the resulting WD applies.
- Review all candidate records. Open each plausible result and compare its construction type, complete locality wording, active or superseded status, and modification or publication information.
- Open the record itself. A state-and-county result label can hide city exceptions, grouped counties, or geographic notes that appear only in the document.
The official search page confirms identifier searching and an active-only control, while individual records supply the details needed for a defensible spreadsheet. The contract documents and the responsible agency remain the authority for deciding which determination legally applies to a particular contract.
Why is a county not a unique wage-determination key?
A single WD can cover multiple counties, independent cities, or other locality descriptions. The Virginia example, WD VA20260210, modification 1, lists several named counties and independent cities under one determination. The Mississippi example, WD MS20260050, modification 0, identifies Harrison County and includes publication metadata and a document control.
That structure means “one row per county with a copied rate” can create false duplicates and conflicting values. A county may be associated with more than one determination because construction type differs, a newer modification supersedes an older record, or a city exception is stated separately. Conversely, several counties may correctly point to the same WD and the same schedule.
Store the determination as the primary object and its geographic coverage as an associated set. If a user searches for “Davis-Bacon wage rates by county,” return the applicable WD record and show the full locality text, rather than presenting an isolated county rate with no context.
Also popular on Amazon
- 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
- Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
- Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
- HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
- What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.
What fields should a traceable spreadsheet contain?
Use a normalized design whenever possible: one table for determinations and a second table for locality associations. Both tables should use the stable WD identifier. This avoids copying a multi-county schedule into separate rows that can drift apart when a modification is published.
| Field | What to record | Why it is needed |
|---|---|---|
| WD number / identifier | The complete identifier exactly as SAM.gov displays it | Stable reference for searching, review, and updates |
| Act or category | Davis-Bacon (DBA); keep SCA records out of this workflow | Prevents mixing different statutory schedules |
| State | State named by the determination | Basic geographic index |
| County or locality | Every county, independent city, and geographic phrase exactly as stated | Preserves grouped coverage and exceptions |
| Construction type | Building, Heavy, Highway, Residential, or the exact type shown | Rates can differ by construction type |
| Modification number | Current modification or revision number | Shows which version you used |
| Publication or revised date | Date shown on the live record or document | Supports currency checks |
| Superseded WD | Any prior determination number named in the record | Creates an audit trail between versions |
| Classification | Labor classification as printed in the schedule | Rates are classification-specific |
| Base wage | Basic hourly rate, preserving the source’s precision | Separates wage from fringe value |
| Fringe benefit | Fringe amount or “none” only when the schedule explicitly says so | Fringe obligations are part of the determination |
| Notes | Footnotes, scope notes, city exceptions, ratios, or other schedule instructions | Prevents loss of conditions that change interpretation |
| Source URL | Direct SAM.gov record link | Lets another reviewer reopen the source |
| Date retrieved | Calendar date you viewed or downloaded the record | Shows when the spreadsheet was last checked |
| Manual verification flag | Yes/no plus a short reason for unusual coverage, notes, or formatting | Routes ambiguous records for human review |
Keep the locality text verbatim in one column even if you also parse it into county rows. The verbatim field is your evidence when a parser, abbreviation, or county-name normalization loses a city exception or geographic qualifier.
Quick wins for a faster PC:
Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Clear out junk files and repair common Windows errorsFree Scan →Scan for outdated or missing drivers - takes under a minuteDriver Scan →What is the safest step-by-step workflow?
Gather the solicitation or contract reference, the project state and county, the construction type if stated, and any WD number before you begin. A spreadsheet is a finding aid; the current SAM.gov record remains the source of record.
- Define the project geography. Write down every project location, including separate parcels or city limits. A project crossing county or city boundaries may require more than one locality review.
- Capture any cited determination. Copy the WD number, modification, and date from the contract documents before searching. Do not silently replace a cited record with a newer one; preserve the citation and investigate the difference.
- Search SAM.gov. Use the WD number when available. Otherwise select Davis-Bacon and narrow by the available state and locality controls. Turn on “active only” when you need currently active records, but still inspect the document’s own revision details.
- Open every plausible result. Read the heading and locality section, not just the search-result title. Confirm the construction type and whether the document names counties, independent cities, or exceptions.
- Inspect the wage schedule. Record each relevant classification, base wage, fringe value, and explanatory footnote. Keep units and decimal precision as displayed.
- Record version metadata. Enter modification number, publication or revised date, and any superseded WD reference. If the page indicates a formatting update, capture the current rendering rather than relying on an old saved layout.
- Download or print the individual document. SAM.gov records show a Print/Download control. Save the document according to your organization’s retention policy and put its URL and retrieval date in the spreadsheet.
- Link localities to the WD. In a normalized workbook, add one locality-association row for each county or city named by the determination. Do not create independent rate schedules unless the source actually provides different schedules.
- Flag uncertainty. Mark grouped coverage, city exceptions, unclear construction type, unusual notes, or changed formatting for manual verification.
- Recheck before contract action. Open the live official record immediately before using the rates in an estimate, bid, payroll setup, or compliance decision. Update the retrieval date and version fields if anything changed.
Can I download all SAM.gov county determinations to Excel?
The reviewed official pages establish individual search and document download, not a supported bulk county export, CSV/XLSX download, or bulk API for Davis-Bacon determinations. Do not promise an automated “all counties” workbook based on the presence of a Print/Download button on an individual record.
Also popular on Amazon
- Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
- Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
- Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
- Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
- What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.
You can still build a reliable workbook by transcribing or otherwise organizing the individual documents you need. For a large recurring workload, document your collection method, keep the original files or links, and treat any internal script or parsing process as an aid that requires human validation. A home-built county crosswalk is not an official SAM.gov dataset and should never replace checking the current determination.
How should I compare multiple records that appear to match?
Compare records in this order:
- Locality coverage: Does the document include the exact county, city, or geographic exception for the project?
- Construction type: Is it Building, Heavy, Highway, Residential, or another type that matches the project?
- Active or superseded status: Prefer the current record when the contract rules require it, but retain the earlier citation for audit purposes.
- Modification and date: A higher modification number or later publication date can signal an updated schedule; read the record rather than assuming the newest number automatically controls every contract.
- Classification and fringe schedule: Confirm that the labor classification and fringe treatment fit the work being priced.
- Notes and exceptions: Footnotes, ratios, scope limitations, and city-specific language can change how a line is applied.
Use the WD identifier as the comparison anchor. If two records appear to cover the same county, keep both candidates in a review sheet until construction type, version, and locality wording resolve the difference.
How do formatting changes affect a repeatable process?
SAM.gov has announced a recent change to wage-determination formatting and directs users to the Department of Labor contact shown on the page for suspected publication errors. A process that depends on fixed screen positions, column numbers, or a particular PDF layout can break when the rendering changes.
For repeatability, store the raw document or direct record URL, the retrieval date, and a human-readable transcription of the fields you used. Reconcile the spreadsheet against the live page after a formatting change. If a rate, locality phrase, or modification label appears inconsistent, pause the data entry and use the official contact path rather than guessing how the new layout maps to the old one.
Also popular on Amazon
- Portable and powerful USB-C HUB: BENFEI USB Type-C HUB, with super-soft and knot-free silicone woven design cable, meets most mobile office needs. Compact, lightweight, stylish, and powerful portable USB C Hub equipped with 1 x HDMI port, 1 x 100W charging, and 3 x USB ports. 18-month warranty, 24-hour response, to ensure you feel at ease when using our product.
- Design centered on comfort and reliability: Thanks to BENFEI's end-to-end in-house cable production capability, in-house PCBA and assembly capability, using the industry's most advanced silicone woven design and process, 20cm cable in length, no knots, super-soft, the HUB is easy to use in all scenarios: laptop, tablet, stand etc. Super-soft, 25000+ life cycles, to meet your daily carrying and office needs.
- 100W Charging: Support up to 90W USB C pass-through charging via Type-C port to keep your laptop powered. 10W is reserved for other interface operations. No data and video function on the Type-C port.
- 4K HDMI Display: The HDMI port supports media display at resolutions up to 4K 30Hz, keeping every incredible moment detailed and ultra vivid. Please note that the C port of the Host device needs to support video output.
- Transfer Files in Seconds: Transfer files and from your laptop at speeds up to 10 Gbps with USB A 3.2 port. Extra 2 USB A 2.0 ports are perfectly for your keyboards and mouse.
What spreadsheet layouts work best?
Normalized workbook: Use a Determinations sheet with one row per WD and a Localities sheet with one row per WD-to-county or WD-to-city association. Add a Rates sheet keyed by WD number and classification if you need to store many labor lines. This is the cleanest approach for grouped counties and revisions.
Single-sheet register: For a small project, one row per WD/locality/classification can be practical if every row repeats the WD number, construction type, modification, source URL, and retrieval date. Include a verbatim locality column so the repeated rows do not imply that each county has its own independent determination.
Versioned archive: Keep prior rows rather than overwriting them when a new modification appears. Add an “effective/retrieved” note and a superseded-WD field. This preserves what an estimator or compliance reviewer saw at the time of a bid or payroll decision.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.What are the common mistakes and their fixes?
| Mistake | Why it fails | Fix |
|---|---|---|
| Using the county name as the WD number | One WD can cover many counties, and one county can have different construction schedules | Key every record by the official WD identifier |
| Choosing the first search result | Results may differ by construction type or revision | Read the full record and compare candidates |
| Mixing DBA and SCA rows | They apply to different worker and contract categories | Keep the workflow limited to Davis-Bacon records |
| Copying only the base wage | Fringe benefits and work rules are part of the determination | Store base, fringe, and explanatory notes separately |
| Dropping city exceptions | An independent city may not follow the surrounding county entry | Preserve every locality phrase exactly as printed |
| Assuming an old PDF is current | Modifications and formatting updates can change the record | Reopen the live SAM.gov page before use |
| Promising a bulk export | The reviewed sources do not confirm an official county CSV/XLSX or API | Describe your workbook as an internally organized collection of individual records |
What should I verify before using the spreadsheet?
- The row links to a live SAM.gov determination, not only to a local copy.
- The WD number and modification match the current record.
- Every project county, city, and geographic exception is represented.
- The construction type matches the contract’s work.
- Classification, base wage, fringe, and notes were transcribed together.
- The retrieval date is present and the record was rechecked before the contract action.
- Ambiguous coverage or unusual formatting has a manual-verification note.
- The spreadsheet is not being presented as a legal decision or an official SAM.gov export.
SAM.gov’s Help index includes Davis-Bacon search and latest-determination guidance. Use that official help and the contract agency’s instructions when the search results do not resolve which record controls.
Also popular on Amazon
- 【Read before You Buy】 Note: This adapter is USB 2.0 version and cannot transmit HDM, VGA, or other video signals. Nevertheless, they are fully capable of charging devices,duplicating files, and can be seamlessly integrated with USB-C earphones, wireless network adapters, and SD card adapters.
- 【Easy to Use and Safe】Thanks to modern manufacturing techniques, we've made these adapters sufficiently compact so that they can remain inserted in your device without noticeable protrusion or inconvenience. This means you don't have to constantly plug and unplug them, reducing the likelihood of wear and misalignment, and making them more convenient to carry around.
- 【Reliable Quality】Engineered for enhanced durability, durable aluminum alloy shell material,get excellent wear resistance and heat dissipation,the male USB C and female USB connectors & the male USB and female USB C connectors are designed to be plugged and unplugged up to 20000 times. Provides data transfer, device charging, memory space expansion, and additional computer peripherals.
- 【Think more for you】Do you need to connect a USB-C-enabled device to an odd device that only has USB-A ports? Then these USB-A male to USB-C female adapters are made for you.Simply insert the adapter into the USB-A port on the device, and you can instantly connect your USB-C device to the device that originally didn't have the correct connection port.
- 【Trusted xiwxi Quality and Service】As a responsible brand seller, you will receive xiwxi's 12-month Quality assurance and lifetime friendly customer service, you're not just buying a product,you're investing in peace of mind with all-round quality and exceptional customer service.
What does this workflow prove—and what does it not?
It gives contractors, estimators, compliance staff, and researchers a traceable way to locate and organize official records by county association. It does not determine the legally applicable wage determination for a particular contract, resolve every construction-type question, or replace agency and Department of Labor guidance. Keep the official determination with the project file and treat the spreadsheet as an indexed, reviewable representation of that source.
Frequently Asked Questions
What if a project spans two counties?
List both locations and inspect the complete locality coverage of each candidate determination. A single WD may cover both counties, but a different construction type or city exception can require a separate record; document the comparison instead of assuming one county row controls the whole project.
The Tool Desk
Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Outbyte Driver Updater FREEScan for outdated or missing drivers - takes under a minuteDriver Scan →Should I keep superseded Davis-Bacon determinations in the workbook?
Yes, retain them in a versioned archive when they were cited, used for an estimate, or replaced by a later modification. Mark them superseded and link the current WD so an auditor can reconstruct which schedule was available at each decision point.
How do I preserve fringe-benefit information in a county spreadsheet?
Keep fringe as its own field beside the base wage for each classification, and retain any footnotes or alternative fringe language in a notes field. Combining fringe into one total can hide how the source schedule states the obligation.
What should I do if the SAM.gov page layout no longer matches my import template?
Stop the automated mapping and compare the current record with the saved document or URL. Update your template only after confirming the new labels and values, and flag any suspected publication error through the Department of Labor contact identified on the SAM.gov page.

