Hardware FixRecommendedDevice not working? Your driver may be the problemCheck updates for common hardware issues.Fix DriversThanksgiving DealsAmazon USThanksgiving week: Black Friday picks start earlyAmazon US: current deals, useful picks and tech finds.Check DealsPC HealthRecommendedCrashes, freezes, slowdowns? Check your PC nowSpot repairable issues before they interrupt work.Check PC×
FREEDOM251

Freedom251 › Blog

Choosing an FCC-Recognized Test Lab: A Product Owner’s Verification Guide

By Freedom251 Team · · 13 min read

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.

Choosing an FCC-recognized test lab means verifying three things before you send a sample: the exact facility is currently recognized by the FCC, its ISO/IEC 17025 accreditation covers your product and every required measurement, and its test plan matches your FCC authorization path. For certification, the lab produces technical data; a separate Telecommunications Certification Body (TCB) reviews the application and decides whether to grant certification. Products using the Supplier’s Declaration of Conformity (SDoC) follow a different route and generally do not require testing at an FCC-recognized laboratory. The steps below show how to confirm fit rather than relying on a directory listing or a lab’s marketing claim.

How do I choose an FCC-recognized test lab for my product?

Start with the product’s authorization procedure, then verify the candidate facility’s current FCC recognition and detailed accreditation scope. A lab is suitable only when its scope and methods cover the specific device, radio technologies, operating modes, and measurements in your compliance plan.

As an Amazon Associate I earn from qualifying purchases.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  1. Classify the authorization route. Determine whether the device needs FCC certification or can use SDoC. Do not ask labs to quote work until this is clear.
  2. Identify the exact facility. Recognition applies to a particular site, not automatically to a company, brand, country, or group of locations.
  3. Check live recognition status. Use the FCC’s current recognition records and ask the lab for evidence that the status is active for the proposed work.
  4. Obtain the accreditation certificate and scope. Confirm ISO/IEC 17025 accreditation through an FCC-recognized accreditation body and match the scope line by line to your test requirements.
  5. Demand a written, device-specific test plan. It should identify FCC rules, methods, configurations, samples, report outputs, and assumptions.
  6. Coordinate with the TCB when certification is required. Have the TCB confirm that the planned evidence will support application review.
  7. Check for Pre-Approval Guidance (PAG). New or unusual technologies may require extra FCC review and coordination.
  8. Recheck before testing starts. Recognition, accreditation, ownership, scope, and your product configuration may have changed since the quote.

The FCC’s own warning is the right standard: “IT IS YOUR RESPONSIBILITY TO SELECT A FIRM THAT IS CAPABLE OF MEASURING YOUR SPECIFIC DEVICE.” The FCC’s public accredited-firm dataset is dated March 22, 2021, so it is useful background but not proof of current recognition. Use the FCC’s current rules and recognition information and the facility’s current accreditation documents before signing a purchase order.

Does every product need FCC lab testing?

No. The answer depends on the equipment authorization procedure. Certification generally requires testing by an FCC-recognized, accredited laboratory. SDoC equipment is not subject to the same FCC-recognized-lab requirement, although a manufacturer may still commission testing to support its declaration and technical records.

Popular on Amazon
Sale
Silkland 40Gbps USB C 90 Degree Right Angle Adapter 2 Pack, 240W USB4 | Male to Female Extender, 8K@60Hz, Thunderbolt 4/3, Steam Deck, ROG Ally, MacBook, Switch 2, iPhone 18/17/16/15, Quest 3 VR
  • 【90 Degree Full Function USB C Adapter】Supports the latest USB4 standard for up to 40Gbps of bandwidth, 8K video support, and up to 240W Fast charging; Support USB PD 3.1 Extended Power Range (EPR) including 140W, 180W and 240W. Your productivity is easily doubled. *Warm Tip: For the best fit, please make sure the USB-C port is fully exposed; thick or bulky cases may affect compatibility.
  • 【Reliable Quality】Made from high-quality, scratch-resistant aluminum alloy, delicate metal frame. get excellent wear resistance and heat dissipation. Non-Slip Design for easier insertion and removal.
  • 【Small and portable】Ultra thin size, ultra compact design, a petite physique that matches the minimalist design of your modern laptops. Coming with a slim figure that won't block the port next to the one it's plugged into.
  • 【Compatibility】Widely work with most usb c, thunderbolt 4/3 devices. Compatibilit for ROG Ally, Steam Deck, Switch, MacBook Pro, Quest 3 VR headset, Surface Book 2, iPhone 18/17/16/15, Samsung Galaxy S23/S22/S21, Note 20/10, Google Pixel, ChromeBook, etc.
  • 【Excellence Customer Support】If you experience any issues or cable failure, simply reach out to our dedicated customer service team. We provide a prompt response within 18 hours, providing you with the necessary technical support to resolve any concerns.

Certification

Certification is the route in which an FCC-authorized TCB reviews an application and grants an equipment authorization when the evidence supports compliance. The certification test data must come from a laboratory that is accredited to ISO/IEC 17025 by an FCC-recognized accreditation body and recognized by the FCC for the applicable work. The accreditation scope must cover the equipment and measurements at issue; a general EMC capability is not enough if the product also needs radio or other specialized measurements.

Supplier’s Declaration of Conformity

SDoC places the compliance declaration with the responsible supplier rather than requiring a TCB-issued certification. FCC rules do not require testing at an FCC-recognized accredited laboratory for equipment relying on SDoC. You still need to determine the applicable technical rules, retain the required compliance information, and ensure that any testing you commission actually represents the final marketed configuration. If the classification is uncertain, resolve it with a qualified compliance professional, the lab, and—where certification may apply—the intended TCB before testing.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What is the difference between an FCC test lab and a TCB?

A test laboratory performs measurements and prepares technical reports; a TCB reviews the certification application and makes the certification decision. They are complementary roles, not interchangeable labels.

  • Laboratory: receives representative samples, applies the agreed methods, records configurations and results, and delivers the report and supporting data.
  • TCB: checks the application, evaluates whether the reports and other exhibits satisfy FCC requirements, raises questions, and grants or withholds certification under its authority.
  • Manufacturer or supplier: defines the product, supplies accurate schematics and operating information, selects competent providers, and remains responsible for the compliance submission and marketed configuration.

A laboratory cannot promise that a TCB will grant certification, and a TCB does not replace the need for technically valid measurements. Ask the proposed lab which TCB will review the file, or select the TCB first and have it review the draft test plan. This avoids a report that is technically sound but formatted or scoped in a way that creates avoidable application questions. The FCC’s certification framework and the distinction between measurement facilities and certification bodies are described in its equipment-authorization materials.

How do I check whether an FCC lab can test my device?

Check the facility, its accreditation scope, and its proposed methods separately. A lab can be recognized yet still lack the scope or equipment for your particular device.

1. Record the product profile before contacting labs

Prepare a one-page profile containing the product name and model, hardware and software versions, intentional transmitters and receive bands, antenna options, power levels, interfaces, accessories, intended markets, and the likely FCC authorization route. Include unusual operating modes, simultaneous transmissions, modular radios, and any battery or power-conversion arrangements that could affect measurements. This profile gives every candidate the same facts and makes quotations comparable.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Sale
Anker USB C Hub, 5-in-1 USBC to HDMI Splitter with 4K Display | 85W Max PD, 1 Powered USB-C 5Gbps & 2 Powered USB-A 3.0 5Gbps Data Ports, for MacBook Pro, MacBook Air, Dell and More (Black)
  • 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
  • Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
  • Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
  • HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
  • What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.

2. Search for the exact facility, not just the company

Match the legal name and physical address on the lab’s certificate to the FCC recognition record. A corporation may operate several sites, and recognition of one site does not automatically establish recognition of another. Ask for the recognition identifier, effective status, and any limitations or expiry information. If a sales office, subcontractor, or overseas site will perform part of the work, verify each facility involved.

3. Review the accreditation certificate and scope

Request the current ISO/IEC 17025 certificate and the complete technical scope, not a marketing summary. Look for the equipment categories, frequency ranges, test standards or methods, measurement types, and site or chamber identifiers that correspond to your plan. Note exclusions, lower or upper frequency limits, and whether the scope covers conducted and radiated work as applicable. A scope that ends below one of your operating bands, for example, is a material gap even if the lab advertises wireless testing generally.

Confirm that the accreditation body itself is recognized by the FCC for the relevant designation. The FCC treats accreditation and recognition as connected but distinct checks: the laboratory must satisfy both, and the scope must fit the work. Keep copies of the documents you relied on with the project record.

4. Ask for a line-item test matrix

Require the lab to map each proposed measurement to the applicable FCC rule section, method, product mode, and report section. The matrix should state:

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  • which transmitters, receivers, interfaces, and accessories are included;
  • frequency, bandwidth, modulation, duty-cycle, and power configurations to be exercised;
  • antenna types, gains, cable losses, and representative worst-case arrangements;
  • emissions, radio, exposure, or other measurements required for the product’s rules;
  • sample quantities, firmware settings, support equipment, and site requirements;
  • data files, photographs, uncertainty information, setup diagrams, and final report format;
  • assumptions that could trigger a change order or additional testing; and
  • the process and pricing basis for retesting if a configuration fails or changes.

Do not accept “FCC compliant testing” as a sufficient scope description. The useful question is whether the lab can measure this device in these modes under these methods.

5. Validate equipment and personnel capability

Ask who will be responsible for the work, what equipment and sites will be used, and whether the lab has handled products with the same technical features. Relevant experience might include a particular radio architecture, simultaneous transmitters, novel modulation, unusual antenna placement, or a product that combines several regulated functions. Experience is not a substitute for accreditation scope, but it can reveal practical risks such as incomplete test-mode firmware or an unsuitable sample fixture.

Also popular on Amazon
Sale
Anker USB C Hub, 7in1 Multi-Port USB Adapter, 4K@60Hz USBC to HDMI Splitter | 85W Max PD, 2 USB 3.0 & 1 USBC Data Ports, SD/TF Card Reader, for Laptops/Mac and Other Type C Devices (Charger Not Included)
  • Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
  • Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
  • Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
  • Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
  • What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.

Request anonymized examples of report structure or a sample deliverables list rather than confidential client files. Ask how the lab controls revisions, records calibration status, handles deviations, and communicates questions. These are procurement and quality questions; the FCC sources do not establish a universal price or turnaround benchmark.

What does current FCC recognition actually prove?

Recognition proves that the FCC has accepted the facility under the applicable framework at the time you check. It does not guarantee that the lab can measure every device, that a report will pass TCB review, or that recognition will remain unchanged through a long project.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The FCC requires reassessment of test laboratories for accreditation and recognition at least every two years. The Commission has also adopted integrity measures affecting recognized laboratories. In 2026 it reported that 23 laboratories it determined were owned, controlled, or directed by a foreign adversary were no longer recognized. That figure is evidence that status can change; it is not a current count of all recognized laboratories or a reason to infer anything about a particular provider without checking the current record.

Before contracting, ask the lab to identify any pending change in ownership, accreditation, location, scope, or recognition. Recheck immediately before the first test and again before relying on a report if the project has been delayed. Preserve dated copies or screenshots of the recognition and scope evidence so your file shows what was verified and when. The FCC’s integrity order and related notices, including FCC 25-27 and DA 25-798, explain why a historical report or directory entry cannot be treated as permanent proof.

What should I do if my product or technology is on the FCC PAG list?

Pre-Approval Guidance (PAG) can add FCC scrutiny where test methods or compliance approaches are not yet mature. If your technology appears on the current PAG list, involve the TCB and the lab before testing begins, agree on the information the FCC may request, and allow for questions or additional measurements.

Ask the lab to identify any prior PAG matters involving the same technology and to explain which steps are included in its proposal and which require TCB or FCC interaction. A “standard” package that ignores PAG is a warning sign. Obtain written agreement on who prepares submissions, who responds to FCC questions, and how added work is authorized. Because PAG categories and procedures can change, verify the current list and process at project kickoff rather than relying on an old proposal.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Also popular on Amazon
Sale
BENFEI USB C Hub 5-in-1 with 4K HDMI(Certified), 100W Power Delivery, 3 USB-A, Silicone Cable, Aluminum Case Compatible with MacBook Pro/Air, iPad Pro, iMac, iPhone 15 Pro/Pro Max, XPS, Thinkpad
  • Portable and powerful USB-C HUB: BENFEI USB Type-C HUB, with super-soft and knot-free silicone woven design cable, meets most mobile office needs. Compact, lightweight, stylish, and powerful portable USB C Hub equipped with 1 x HDMI port, 1 x 100W charging, and 3 x USB ports. 18-month warranty, 24-hour response, to ensure you feel at ease when using our product.
  • Design centered on comfort and reliability: Thanks to BENFEI's end-to-end in-house cable production capability, in-house PCBA and assembly capability, using the industry's most advanced silicone woven design and process, 20cm cable in length, no knots, super-soft, the HUB is easy to use in all scenarios: laptop, tablet, stand etc. Super-soft, 25000+ life cycles, to meet your daily carrying and office needs.
  • 100W Charging: Support up to 90W USB C pass-through charging via Type-C port to keep your laptop powered. 10W is reserved for other interface operations. No data and video function on the Type-C port.
  • 4K HDMI Display: The HDMI port supports media display at resolutions up to 4K 30Hz, keeping every incredible moment detailed and ultra vivid. Please note that the C port of the Host device needs to support video output.
  • Transfer Files in Seconds: Transfer files and from your laptop at speeds up to 10 Gbps with USB A 3.2 port. Extra 2 USB A 2.0 ports are perfectly for your keyboards and mouse.

Does the lab’s country or location matter?

Location alone does not determine suitability. A non-U.S. facility may be acceptable when its accreditation, designation, and FCC recognition fit the applicable rules and any relevant Mutual Recognition Agreement (MRA) route. Verify the individual laboratory and its scope; do not infer eligibility from the country or from the name of its accreditation body.

Geography still affects execution. Consider shipping time and customs, sample security, export controls, time-zone coverage, language, witness access, and whether engineering staff can join troubleshooting sessions. If a project uses multiple sites, state which site performs each measurement and ensure the report identifies them consistently.

How should I compare qualified lab proposals?

Once candidates pass the recognition and scope checks, compare the proposals on technical completeness and project control rather than headline price.

Comparison point Questions to ask Evidence to keep
Scope match Does the accreditation scope cover every rule, band, method, and measurement? Current certificate and detailed scope with matching lines highlighted
Test plan clarity Are modes, antennas, samples, fixtures, and deliverables explicit? Versioned test matrix and assumptions list
Device experience Has the team worked with the relevant radio architecture or unusual feature? Named technical lead and anonymized capability examples
TCB coordination Will the lab resolve method questions and format data for the chosen TCB? Written coordination responsibilities and escalation path
Sample handling How many units are needed, how are firmware changes controlled, and how are samples returned? Sample instructions, custody terms, and configuration records
Retest terms What happens after a failure, product change, or method clarification? Retest definition, change-order rules, and approval contacts
Schedule What dates are reserved, and what dependencies could move them? Milestone plan tied to sample and documentation delivery
Report quality Will the report include raw data, setup photographs, uncertainty, and configuration details? Deliverables list or redacted report outline
Commercial terms What is included, excluded, cancellable, or billed separately? Itemized quotation and acceptance criteria

Details checked November 2026.

No source in this review establishes a universally best laboratory, standard fee, or typical turnaround. A lower quote can be poor value if it omits a required mode, assumes the wrong authorization route, or makes retesting and TCB questions expensive. Compare like-for-like scopes and document why the selected proposal is technically complete.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What questions should I send a prospective lab?

Use a written questionnaire so each candidate answers the same questions. The following wording is suitable for an initial request:

  1. What is the exact legal name and address of the facility that will perform each test?
  2. What is the current FCC recognition status and identifier for that facility?
  3. Which FCC-recognized accreditation body issued your ISO/IEC 17025 certificate, and can you provide the complete current scope?
  4. Where in the scope are our product category, frequency ranges, technologies, and required measurements covered?
  5. Which FCC authorization path do you believe applies, and what assumptions support that view?
  6. Please provide a line-item test plan showing rules, methods, configurations, samples, and report deliverables.
  7. Will a TCB review the certification file, and how will you coordinate method or report questions with it?
  8. Does the product or technology require PAG or other pre-approval interaction?
  9. What firmware, test commands, antennas, accessories, and support equipment must we supply?
  10. How do you control configuration changes, deviations, failures, retests, and final report revisions?
  11. Which work is included in the quotation, and which events create additional charges or schedule changes?
  12. What recognition, accreditation, ownership, or scope changes should trigger a recheck before we rely on the results?

Ask the lab to answer with document references, not only “yes.” A scope number, page, method revision, or facility identifier makes the response auditable.

Also popular on Amazon
𝟒𝐏𝐚𝐜𝐤 𝐔𝐩𝐠𝐫𝐚𝐝𝐞𝐝 USB to USB C Adapter,Type-C Female to A Male Charger Converter for iPhone 18 Charger,iWatch Ultra SE 9 10,iPhone 17 Pro Max 16 15 14,Samsung S25,AirPods,iPad,Car,Xbox
  • 【Read before You Buy】 Note: This adapter is USB 2.0 version and cannot transmit HDM, VGA, or other video signals. Nevertheless, they are fully capable of charging devices,duplicating files, and can be seamlessly integrated with USB-C earphones, wireless network adapters, and SD card adapters.
  • 【Easy to Use and Safe】Thanks to modern manufacturing techniques, we've made these adapters sufficiently compact so that they can remain inserted in your device without noticeable protrusion or inconvenience. This means you don't have to constantly plug and unplug them, reducing the likelihood of wear and misalignment, and making them more convenient to carry around.
  • 【Reliable Quality】Engineered for enhanced durability, durable aluminum alloy shell material,get excellent wear resistance and heat dissipation,the male USB C and female USB connectors & the male USB and female USB C connectors are designed to be plugged and unplugged up to 20000 times. Provides data transfer, device charging, memory space expansion, and additional computer peripherals.
  • 【Think more for you】Do you need to connect a USB-C-enabled device to an odd device that only has USB-A ports? Then these USB-A male to USB-C female adapters are made for you.Simply insert the adapter into the USB-A port on the device, and you can instantly connect your USB-C device to the device that originally didn't have the correct connection port.
  • 【Trusted xiwxi Quality and Service】As a responsible brand seller, you will receive xiwxi's 12-month Quality assurance and lifetime friendly customer service, you're not just buying a product,you're investing in peace of mind with all-round quality and exceptional customer service.

What are the most common selection mistakes?

  • Relying on an old directory entry. The FCC accredited-firm dataset carries a March 22, 2021 update date. Treat it as a starting point, then verify live recognition and current scope.
  • Confusing company recognition with site recognition. The address performing the work must be the recognized and accredited facility.
  • Checking only “ISO 17025.” Accreditation without the right technical scope does not establish capability for your device.
  • Choosing the lab before deciding certification versus SDoC. The route determines whether recognized-lab testing is required and what evidence the TCB will review.
  • Letting a lab promise certification. Only the TCB makes the certification decision; the lab supplies measurements and reports.
  • Ignoring configuration control. A report for one antenna, firmware build, or power setting may not represent the product you ship.
  • Overlooking PAG. New technologies can require additional interaction that a routine quotation does not include.
  • Failing to recheck after delay. Recognition, accreditation, ownership, and scope can change while a sample is waiting for test.
  • Comparing prices without comparing scope. An apparently inexpensive quote may exclude required modes, raw data, TCB support, or retesting.

What should my final selection file contain?

Keep a compact evidence package that another engineer or auditor can understand without calling the salesperson. Include the product profile and authorization decision; dated FCC recognition evidence for each performing site; the accreditation certificate and full scope; the signed test matrix; PAG analysis, if applicable; TCB contact and review expectations; quotation and change-order terms; sample and firmware records; and the final reports with all revisions.

At the release decision, confirm that the tested configuration, labeling information, user documentation, and production changes still correspond to the authorization file. If the product changed materially, ask the lab and TCB whether additional analysis or testing is needed instead of assuming the original report covers it.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

How do I make the decision when two labs appear equally qualified?

Prefer the proposal with the clearest scope match and test plan, then weigh TCB coordination, technical communication, sample logistics, schedule certainty, report completeness, retest terms, geography, and total quoted cost. Ask both candidates to resolve the same open questions in writing. The better choice is the one that leaves fewer assumptions for your team to discover after the sample is on the bench.

Finally, perform the recognition and scope check again immediately before work begins. That simple recheck protects against relying on a stale listing, changed ownership, expired accreditation, or a facility that is no longer recognized for the exact measurements your product needs.

Frequently Asked Questions

Can I use a laboratory that appears in an old FCC directory?

An old directory can help you find candidates, but it cannot establish current eligibility. The FCC’s accredited-firm dataset is dated March 22, 2021; verify the exact facility’s live recognition, accreditation certificate, and technical scope before relying on it.

Can the same company be both the test lab and the TCB?

The functions remain distinct even when related organizations offer both services. The laboratory generates measurements and reports, while the TCB independently reviews the certification application and makes the certification decision; ask how independence and responsibilities are handled.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What happens if a lab loses recognition after testing is complete?

Do not assume a historical report remains usable without review. Notify the TCB, preserve the recognition and scope evidence that existed when testing occurred, and ask whether the status change affects acceptance of the report or requires additional work.

Should I send production hardware or engineering samples to the lab?

Send samples that represent the final intended configuration, with controlled firmware, antennas, accessories, and operating modes. Document every difference between the tested sample and production plans so the lab and TCB can determine whether further analysis or testing is necessary.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply. Prices as of November 22, 2026 5:05 pm GMT+0530.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Crashes, No Sound, or Screen Glitches?Free driver scan
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.