Data centers use electricity to run servers, storage and networking equipment—and to power the cooling, backup and electrical systems that keep that IT equipment operating. The International Energy Agency (IEA) estimated global data-centre electricity use at 415 terawatt-hours (TWh) in 2024, about 1.5% of global electricity consumption. Its 2026 update puts the 2025 estimate at roughly 485 TWh and projects about 950 TWh in 2030. These figures come from different report vintages and baselines, not one unchanged forecast series.
How a data center uses electricity
Electricity enters a facility through a grid connection and may also come from onsite generation. Power-conditioning and backup equipment help deliver reliable electricity to the IT equipment. Servers process workloads; storage systems hold data; networking equipment moves it. Cooling and other facility systems also consume power. This is a general explanation of the components, not a universal wiring diagram: layouts and equipment differ from site to site.
As an Amazon Associate I earn from qualifying purchases.
The IEA identifies servers, storage, networking, uninterruptible power supplies (UPS), cooling, network and grid connections, and backup generators among the relevant equipment. The proportion of electricity used by each part varies with the data-center type and equipment efficiency. There is no single split that applies to every facility.
Windows Errors? Fix Them Before They Spread
Repair common Windows errors and clear accumulated junk for a smoother, more stable PC - no reinstall needed.Free scan · no reinstallCrashes, No Sound, or Screen Glitches?
Random freezes, missing sound and display glitches usually trace back to one bad driver. Find and replace yours safely.Free scan · under a minuteHow much electricity data centers use
Global estimates and projections have shifted as the IEA has updated its outlook. Read each number with its report year and baseline:
#1 Best Overall
- Versatile and Space-Saving: This 1U Rack mount PDU features a compact design that allows for efficient use of space in standard 19-inch racks. 16 rear-facing plug outlets and three front-facing outlets provide ample connectivity for your devices
- Efficient USB Power: Featuring four USB ports, it enables simultaneous power supply to your favorite devices, ensuring convenience and productivity
- Built-in Circuit Breaker: The PDU is equipped with a built-in 12-Amp circuit breaker that protects against circuit overloads. This ensures reliable performance and helps prevent damage to your equipment
- Heavy-Duty Construction: The power distribution unit is designed with heavy-duty components and a sturdy metal housing for durability and long-lasting use
- Convenient Mounting: The PDU features mounting ears on the back panel for easy installation in a standard 19-inch rack
| IEA publication | Estimate or projection | How to interpret it |
|---|---|---|
| 2025 report | 415 TWh in 2024; about 1.5% of global electricity use | Estimated global consumption in 2024. |
| 2025 report, Base Case | 945 TWh in 2030; just under 3% of global electricity use | A scenario projection, not an observed outcome. |
| 2026 update | Roughly 485 TWh in 2025; about 950 TWh in 2030 | A later estimate and updated central projection with a different baseline and forecast vintage. |
The IEA also reported that data-centre electricity demand had grown around 12% annually over the five years before its 2025 report. The 2026 update estimates global demand grew 17% in 2025, with AI-focused data centres growing 50% that year. The figures describe different periods and editions; they should not be treated as directly interchangeable measures.
Why data-center power demand is growing
AI and accelerated servers
AI is driving deployment of high-performance accelerated servers and increasing power density in data centers. In the IEA’s 2025 Base Case, electricity use by accelerated servers grows around 30% per year from 2024 to 2030, compared with 9% per year for conventional servers. Accelerated servers account for almost half of net global data-centre electricity growth in that scenario. These are projections, not measured future results.
Rank #2
- Rack mount 9-outlet power distribution unit (PDU) designed for standard 19-inch server racks, ideal for data centers, server rooms, and network closets
- Wide spacing for 2 outlets to accommodate larger plugs and adapters, improving cable management and reducing outlet overcrowding
- Individual on/off switches for each outlet, allowing convenient and independent control of connected devices
- 1u PDU includes 2 high-speed USB fast charging ports and 2 type C ports for simultaneous power supply and device charging
- Built-in overloading protection safeguards connected equipment from power surges and overloads, ensuring safe, reliable operation
AI workloads do not all use the same amount of energy. The IEA’s 2026 analysis says simple text-generation tasks have become more energy-efficient, while video generation, reasoning and agentic workloads can require hundreds or thousands of times more energy per query than simple text generation. That comparison is about particular types of task; it does not mean every AI query has one fixed footprint.
The Tool Desk
Outbyte Driver Updater FREEScan for outdated or missing drivers - takes under a minuteDriver Scan →Outbyte PC Repair FREEClear out junk files and repair common Windows errorsFree Scan →Cloud and other digital services
AI is a major growth driver, but not the only one. Expanding demand for cloud computing, data processing and other digital services also adds to electricity use. Facility infrastructure draws additional power as well as the IT equipment doing the computing.
Rank #3
- 1U 8-OUTLET RACK MOUNT PDU: Built-in 8ft. (2.4m) NEMA 5-15P Power Cord; 8x NEMA 5-15R Outlets; 125V Max. Input/Output; 15A Circuit Breaker; Ideal power supply for server rooms, server closets, small data centers and recording studios
- ON/OFF OUTLET SWITCHES: Each outlet features an individual illuminated rocker switch for controlled power management; Enumerated switch labels clearly identify the corresponding outlet; Safety covers prevent accidental power cycling
- 15 AMP CIRCUIT BREAKER: This 8-port rackmount power distribution unit features a self-tripping and resettable circuit breaker with 15A trip-point to protect connected equipment
- 1U RACK DESIGN: This horizontal power distribution unit installs in 1U of rack space on network racks and is compatible with all 19-inch server racks 4" or deeper; Compatible with ANSI/EIA RS-310-D standards
- OPTIMIZED DESIGN: Heavy-duty steel housing with rear facing outlets; Attached 8 ft. (2.4m) long power cord
Where growth is concentrated—and what that means for grids
A small global share can still create substantial pressure where data centers cluster. In the IEA’s 2025 report, the United States accounted for 45% of global data-centre electricity consumption in 2024, China for 25% and Europe for 15%. The United States and China together account for nearly 80% of projected global growth through 2030 in that analysis.
Grid connections, transmission construction and equipment supply can take longer than data-center projects. The IEA’s 2025 report estimates that around 20% of planned data-centre projects could be at risk of delays unless grid risks are addressed. This is a projection about planned projects, not a count of facilities currently delayed. It helps explain why local constraints matter more than the global percentage alone when asking whether data centers could contribute to power shortages.
Rank #4
- 2-flat-pin plug
- 110V input voltage / 9VDC 1A output voltage
- For use with Arduino Uno, Mega and MB102 Power supply boards
- Connector size: 5.5 x 2.1mm with Center Tip positive, sleeve is negative
- These adapters do not work for guitar pedals or label makers which require negative tip power adapters
What electricity sources supply data centers?
In the IEA’s 2025 Base Case, renewables meet nearly half of global data-centre demand growth from 2024 to 2030. Natural gas and coal together supply over 40% of additional demand through 2030 in that scenario. These are estimates of physical electricity generation, accounting for onsite generation and the local grid mix—not the contractual electricity mix an operator may claim through purchasing arrangements. The actual supply mix varies by place and scenario.
Recommended Free Tools
Why forecasts differ
Forecasts depend on how quickly AI is adopted, what workloads people run, how efficient hardware and software become, how many facilities are built, and whether power-system bottlenecks delay them. The IEA’s 2025 scenarios range from roughly 700 TWh of data-centre electricity use in 2035 under Headwinds to more than 1,700 TWh under Lift-Off. These are contrasting scenario outcomes, not confidence bounds around a single prediction.
Best Value
- 10-Outlets Power Distribution Units - This PDU provides 10 AC outlets (110V/15A), features 10 individual on/off power switch, you can use to shut off electronics when not in use for power/energy saving, with 10ft power extension cord(14AWG)for plug your devices in while leaving the rack mobile
- Rack Mount Surge Protector - The power supply PDU strip provides surge protection to prevent excess voltage from reaching electronics with LED indicators, and built with PSD surge protection, Further ensuring the safety of electronic devices
- 1U Rack Mountable Design - The rackmount power strip compatible with all 19” server racks, and 1u power supply fits many network racks, data centers, network closets, and VoIP Phone systems
- ETL Listed & Overload protection - Reliable ETL safety certification with the rack power strip, with Overload protection, built-in circuit breaker and reset switch, ensuring a dependable performance of your networking equipment,Protects your equipment professonally
- Versatile Rackmount Options - Our rackmount power strip is made of industrial-grade metal housing, which is high quality and heavy duty, and allows for the PDU to be installed vertically or horizontally
For a fair comparison, check the report date, scenario, baseline year and forecast horizon. A forecast is not an observed result, and a newer estimate may use a different starting point or assumptions than an earlier one.
Quick Recap