Outbyte Driver Updater FREEFix the driver behind crashes, sound loss and screen glitchesFind Drivers →Outbyte PC Repair FREEClear out junk files and repair common Windows errorsFree Scan →Sometimes locally, but not automatically. Data centers use substantial electricity, and their cooling and power supply can consume water. A facility built on forested land can remove trees, while added grid costs can affect other customers under some utility rate designs. How much any of these impacts matter depends on the site, cooling system, local resources, and utility rules; national figures do not establish what a particular project will do.
How much electricity do data centers use?
Lawrence Berkeley National Laboratory (LBNL) estimated U.S. data centers used 176 terawatt-hours (TWh) in 2023, about 4.4% of national electricity use. In a 2024 report, LBNL estimated that use could reach 325–580 TWh by 2028, or about 6.7%–12% of projected U.S. electricity use. The Department of Energy (DOE) reported these figures in a December 20, 2024 release.
As an Amazon Associate I earn from qualifying purchases.
| Period | Estimated U.S. data-center electricity use | Share of U.S. electricity | What the figure represents |
|---|---|---|---|
| 2023 | 176 TWh | About 4.4% | LBNL estimate reported by DOE in 2024; based on historical shipments and recent trends, not direct metering of every facility. |
| 2028 | 325–580 TWh | About 6.7%–12% | LBNL scenario range reported by DOE in 2024, not a measured outcome or a single-point forecast. |
The estimates show why data-center growth matters for electricity planning, but they do not say how much demand a particular facility will add to a local grid. Nor do they establish that a particular household’s bill rose because of data centers: that depends on regional infrastructure needs and how a utility allocates costs.
Can data centers contribute to water shortages?
They can add to water demand, but the effect depends on where and how a facility operates. A national or industry-wide water figure would conceal important differences among sites, so water use should be assessed with a stated facility, boundary, year, and measurement method.
#1 Best Overall
- Condition: 100% Brand New and in Perfect package to ensure you receive a perfect product
- Model: DV4600-492
- Bearing Type: Ball; Fan Diameter: 120mm; Maximum Fan Speed: 2650/3100 RPM; Material: Plastic; Type: Axial cooling fan
- Packaging: Carton; Power Connection: 2-Pin; Voltage: 115VAC
- Fan size: 120*120*38MM
Direct water use for cooling
Servers generate heat, and some cooling systems consume water on site to remove it. Consumption varies with the facility’s size, computing density, cooling design, and operating conditions. A system that uses less water may have other resource implications; cooling choices can shift impacts between water and electricity rather than eliminate them.
Indirect water use from electricity
Power generation can consume water away from the data center. A facility’s on-site water-use figure therefore does not capture its full water footprint. A fair comparison should distinguish direct cooling water from water associated with the electricity supply.
Rank #2
- APPLICATION: USB computer fans cool off gaming systems, routers, amplifiers, and receivers. 120mm case fan keep entertainment centers' stereos and cables cool and help with air flow in various spaces
- PLAY AND PLUG: Just plug this server fan into any USB source—like a charger, power bank, phone adapter, game console, or USB outlet. It's a breeze to use
- PACKAGE INCLUDING: This usb cooling fan set comes with two USB fans, one USB cable to control two fans (high speed medium speed low speed), and a metal shield to protect your hands. Easy to use, safe and reliable
- Variable Speed Fan: It has a variable-speed controller so you can adjust the pc fan for the best mix of quiet operation and airflow
- Specification: 120 x 120x 25 mm ( 4.72 x 4.72 x 0.98 in. ) | Rated Voltage : 5V | Rated Current: 0.25A | Airflow: 77 x 2 CFM | Noise: 32dBA | Speed: 2000 RPM (MAX)
Why local conditions matter
Virginia’s Joint Legislative Audit and Review Commission (JLARC) found in its 2024 review that most Virginia data centers used about as much water as, or less than, an average large office building, while a few used substantially more. The review also noted that water is less available in some Virginia localities. These are findings about Virginia facilities, not a rule for other states or watersheds. Even a facility with relatively modest use may matter more where water is constrained or already in demand.
Recommended Free Tools
Do data centers cause deforestation?
A project can remove trees or habitat if it is built on forested land, but a data center’s large site requirement alone does not show that forest was cleared. Land could instead have been farmland, previously developed property, or another type of cover. JLARC identifies large, flat sites as a location requirement in Virginia; that is evidence of land-use pressure, not proof of forest conversion.
Rank #3
- An ultra-quiet UL-certified fan system designed for cooling cabinets that requires minimal noise.
- Features a multi-speed controller to set the fan’s speed to optimal noise and airflow levels.
- Contains a CNC machined aluminum frame with a modern brushed black finish.
- Powered by wall outlet or USB port, included Turbo Adapter increases performance by 25%.
- Dimensions: 8.5 x 4.4 x 1.3 in. | Total Airflow: 52 CFM | Total Noise: 18 dBa | Bearings: Dual Ball
The official sources cited here do not quantify forest clearing attributable to data centers nationally or establish that they are a major driver of U.S. forest loss. To assess a specific proposal, check the parcel’s prior land cover, site plans, tree-removal information, local permits, environmental reviews, and habitat records. A national claim would require consistent land-cover evidence rather than acreage from one development.
Can data centers raise other customers’ electric bills?
Potentially. If utilities build generation or transmission to serve expected demand, regulators and rate structures determine how the costs and risks are allocated. The outcome can depend on whether forecast demand arrives, what large-load customers are required to pay, regional power supply, and regulatory decisions. Cost allocation is not the same as proof that current increases in any particular household’s bill were caused by data centers.
Rank #4
- An ultra quiet UL-certified fan system designed for cooling cabinets that requires minimal noise.
- Features an on board processor that provides a digital read-out of the cabinets temperatures.
- Programming includes thermostat control, fan speed control, and SMART energy saving mode.
- Dimensions: 6.3 x 6.3 x 1.3 in. | Airflow: 52 CFM | Noise: 18 dBA | Bearings: Dual Ball
In a 2024 Virginia review, JLARC concluded that existing rates appropriately allocated current costs to the customers responsible for them, including data centers. It also found that growth was likely to increase system costs for all customers. For a typical Dominion Energy residential customer, JLARC estimated an additional $14–$37 per month by 2040 in generation- and transmission-related costs, in constant dollars. That is a forecast for one utility territory—not a measured bill increase, a nationwide average, or a prediction for every Dominion customer.
How to compare data-center proposals
For two projects, ask for comparable information using the same reporting boundary and time period. A facility’s annual water consumption, for example, cannot be fairly compared with a municipality’s withdrawal limit unless the units and periods align.
Best Value
- 【Universal Compatibility】This USB cooling fan works seamlessly with Mini PC, PS5, routers, Apple TV, modems, PlayStation, receivers, Rokus, T-Mobile 5G Home Internet, Xbox Series, and other audio-video electronics. Whether cooling a gaming console, router, or streaming device, it eliminates overheating worries across your digital ecosystem.
- 【Powerful Cooling Performance】Equipped with a 120mm fan boasting 55.8 CFM airflow and 850RPM±10% speed, this USB PC fan delivers rapid cooling—dropping device temperatures by 20% in seconds. The 9-blade design ensures powerful airflow to tackle heat buildup in routers, mini PCs, and gaming consoles, preventing lag and performance drops caused by overheating.
- 【Ultra-Quiet Operation & Scratch-Proof Protection】 Designed for ultra-quiet and scratch-resistant cooling needs, this USB computer fan comes with 4 shock-absorbing pads and operates at just 18dB(A)±10% noise—whisper-quiet, quieter than library silence (30dB) and close to the sound of rustling leaves (20dB). It enables efficient device cooling without noise interference or surface scratches, letting you fully immerse in video, audio, and gaming. It’s perfect for home offices, living rooms, and gaming setups.
- 【USB-Powered & Space-Saving Setup】This USB powered fan features an integrated 530mm (20.87-inch) USB cable, connecting easily to chargers, mobile power banks, or laptops—no extra wires needed. With dimensions of 130mm×130mm×48.6mm (5.12×5.12×1.91 inches), it can be placed flat or upright, making it perfect for narrow spaces while keeping your setup tidy.
- 【Sturdy & Long-Lasting Durability】Made from premium eco-friendly ABS material, this USB fan (with a box fan-like structure) supports heavy-duty use and can withstand weights up to 11LB. With a lifespan of 40000 hours, it offers long-term cooling for your devices, ensuring stable performance and protection against overheating for years to come.
- Water: Separate on-site consumption from water used in electricity generation; identify the source of cooling water and the local availability of water for competing uses.
- Cooling and power: Identify the cooling design, expected operating conditions, projected electric load and timing, and the planned generation and transmission needed to serve it.
- Customer costs: Review the proposed rate class, minimum payment commitments, and rules for allocating costs if expected demand does not materialize.
- Land: Establish the parcel’s current land cover and document proposed tree removal, habitat effects, and zoning decisions.
For broader context on data-center electricity estimates, consult DOE’s release of the 2024 LBNL figures; for Virginia-specific land, water, and rate findings, consult JLARC’s 2024 review. Neither source substitutes for site-specific records when evaluating a proposed project.
Quick Recap