DriversRecommendedOutdated drivers can make a good PC feel brokenScan driver issues before chasing fixes manually.Scan NowHalloween DealsAmazon USHalloween week deals: useful picks before month-endAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix Now×
Skip to content
World desk6 min

Data Center Water Use: From WUE to Real-World Resilience

WUE measures onsite water per kilowatt-hour of IT energy but omits electricity-related water and local conditions. Here is what it covers, how cooling choices shift the trade-off, and how to judge resilience.
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Data center water use is most often expressed as water usage effectiveness (WUE): the annual onsite water use of a facility divided by the energy consumed by its IT equipment, in liters per kilowatt-hour (L/kWh). WUE is a useful way to compare cooling efficiency at one site. It does not include the water consumed to generate the electricity the site draws, and it says nothing by itself about whether local water supplies can absorb the demand. A low site WUE is one input to a judgment about water impact and resilience, not a verdict on either.

What WUE measures

The U.S. Department of Energy’s Federal Energy Management Program (FEMP) defines site WUE as annual site water usage divided by IT-equipment energy use, in liters per kWh. The definition appears in FEMP’s cooling-water efficiency guidance for federal data centers, dated January 9, 2019. DOE’s later Best Practices Guide for Energy-Efficient Data Center Design (July 2024) also defines site WUE.

As an Amazon Associate I earn from qualifying purchases.

Two features of the definition shape how the number should be read.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
  • WUE is an intensity, not a total. It tells you how many liters are used per kWh of IT energy. The total volume depends on how much IT energy the facility uses. Illustrative arithmetic, not a measured facility: at a WUE of 0.7 L/kWh, a site using 10,000,000 kWh of IT energy in a year would use about 7,000,000 liters onsite; at 20,000,000 kWh of IT energy, about 14,000,000 liters.
  • The denominator is IT energy only. Cooling-plant and power-delivery energy do not enter the ratio, so WUE cannot show whether the facility is efficient in its energy use. It has to be read beside an energy metric.

What WUE leaves out

Site WUE covers water used on the property. It excludes water consumed upstream at power plants to generate the facility’s electricity. The Lawrence Berkeley National Laboratory (LBNL) 2024 United States Data Center Energy Usage Report distinguishes site WUE from source WUE, which accounts for the water required to produce the electricity the data center uses.

Source accounting is harder than site accounting because it depends on the electricity supply. The water intensity of a grid varies by region and by generation mix, so two facilities with the same site WUE can carry very different source-water footprints. Any comparison that involves a change in electricity demand needs to state which boundary it uses.

How cooling design moves the impact

Cooling choice changes which resource is affected. The 2024 LBNL report notes that air-cooled chillers use no water onsite but use more energy, while water-cooled and evaporation-based systems generally can be more energy efficient and use more water. The trade is between onsite water and energy, and each side has its own source-water consequence.

Cooling approach Onsite water Energy use Source-water effect
Air-cooled chillers None onsite (LBNL 2024) Higher (LBNL 2024) Not quantified in the cited sources; depends on the electricity supply
Water-cooled and evaporation-based systems Uses onsite water; more than air-cooled chillers (LBNL 2024) Generally more energy efficient (LBNL 2024) Not quantified in the cited sources; depends on the electricity supply

Where onsite water goes

In a cooling-tower arrangement, heat from IT equipment is transferred through the cooling system and rejected at the tower, where evaporation carries it to the atmosphere. Water use therefore tracks the facility’s heat load and the efficiency of each stage of heat removal, as described in FEMP’s cooling-water guidance.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Evaporation is only part of the onsite water budget. As water evaporates, dissolved minerals stay behind and concentrate in the circulating water. Operators discharge some of that concentrated water as blowdown and replace it with makeup water. Makeup water therefore covers both evaporation and blowdown, which is why a cooling tower’s makeup demand is larger than the water that evaporates alone.

Off-site water in the electricity supply

A 2025 review by Nuoa Lei, Jun Lu, Arman Shehabi, and Eric R. Masanet, “The water use of data center workloads: A review and assessment of key determinants,” in Resources, Conservation and Recycling 219 (2025), article 108310 (DOI 10.1016/j.resconrec.2025.108310), assesses water use at the level of individual workloads rather than whole sites. The review ranks the following as key determinants:

  • server efficiency
  • grid water-consumption factors
  • server utilization
  • cooling type
  • infrastructure efficiency
  • climate zone
  • share of inactive servers
  • server refresh cycle

The review reports workload-level water use varying by more than 10,000-fold. That spread is driven by two factors it quantifies separately: water consumption per kWh of server electricity varies by more than 1,000-fold, and server workload efficiency varies by roughly tenfold. These are the review’s findings across the workloads it assessed. They are not operating measurements of any particular facility and should not be used as a benchmark for one.

Electricity demand is the channel through which this off-site water grows. LBNL’s United States Data Center Energy Usage Report: 2025 Update, published in June 2026, estimates in its abstract that data centers could account for 11.8% of U.S. electricity use by 2030, with scenarios from 9.5% to 15.3%. Those are electricity estimates. The abstract does not project national water use, so the figures should not be read as a national water number.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Operational measures that lower onsite water

FEMP’s guidance lists operations and maintenance opportunities for existing cooling-tower systems. DOE states that these can lower water use in appropriate systems and climates, and each depends on controls and operating conditions suited to the site and equipment:

  • Setpoint review. Reviewing temperature and humidity setpoints.
  • Air-side economizing. Using outdoor air for cooling when outdoor conditions and air quality allow.
  • Water-side economizing. Using water-side economizing when the system configuration permits it.
  • Cycles of concentration. Optimizing cycles of concentration to reduce blowdown and makeup water.

Cycles of concentration: the three-to-six example

Cycles of concentration is the ratio of dissolved minerals in the circulating tower water to those in the makeup water. Raising it means less blowdown for each unit of evaporation, but the circulating water is then more concentrated, so water treatment has to keep scaling and corrosion under control.

FEMP cites its Cooling Tower Best Management Practice for one example: increasing cycles of concentration from three to six reduces cooling-tower makeup-water requirements by 20% and blowdown by 50%. The FEMP page does not give a publication year for that underlying practice, and the percentages describe that example, not every tower.

Reverse-osmosis treatment of blowdown

DOE describes reverse-osmosis treatment of cooling-tower blowdown as one option to offset some freshwater needs in drought-affected regions. The process produces a concentrated reject stream. DOE also notes that hybrid systems add control loops and need a detailed operations and maintenance plan. It is an engineering option to evaluate for a specific site, not a default measure.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Why resilience depends on the site

The same cooling design can be sound in one location and a poor fit in another. Resilience depends on local freshwater availability, drought conditions, and utility constraints. Climate and outdoor-air conditions determine whether economizing is possible at all. Operating controls matter as well: an economizer or cycles-of-concentration strategy saves water only when the equipment and its controls support it.

Changing the cooling approach also changes the energy side of the ledger. Moving from water-based to air-based cooling trades onsite water for energy that still has to be supplied, which can shift the burden onto the grid and its water. No public score converts these factors into a single resilience rating, and the guidance cited here does not replace a local water-utility or permitting review.

A checklist for judging a data center water claim

  1. Confirm the boundary. Establish whether the figure is site WUE (onsite water only) or includes source water. A comparison is valid only when both figures use the same boundary.
  2. Check the denominator. Confirm that WUE is divided by IT-equipment energy, not total facility energy.
  3. Note the measurement year. Guidance and case examples carry different dates. FEMP’s NREL data-center example, which reports PUE 1.06 and WUE 0.7, does not state the year in which it was measured.
  4. Identify the cooling design. Air-cooled, water-cooled, and evaporative designs imply different water-energy trade-offs, as shown in the table above.
  5. Ask for the energy figure beside the water figure. A water number on its own cannot show whether the trade was worthwhile.
  6. Check the workload behind the figure. Use the determinants listed above, particularly utilization, inactive-server share, and server efficiency, to judge what the water is producing.
  7. Test the figure against local conditions. Apply the freshwater, drought, and utility factors described above to the specific location before deciding whether the figure is acceptable.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More from the Wire

  1. World desk4 min
    How to Spot an AI Voice Scam Before Sending MoneyDon’t rely on how a caller sounds. Pause, call back through a known number, and verify the emergency with another trusted person before sending money.
  2. Mountain View desk4 min
    Google’s SynthID Detector: How to Check AI-Generated Images, Video and AudioGoogle’s SynthID Detector looks for an embedded watermark in supported images, video and audio. Here is what its results do—and do not—show.
  3. Redmond desk20 min
    How to create a link to File or Folder in Windows 11Windows 11 gives you several ways to point to a file or folder without moving or duplicating it. You can create a desktop shortcut,…
Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
Windows Errors? Fix Them Before They SpreadFree repair scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.