Driver FixRecommendedSound, Wi-Fi or graphics acting up? Check drivers firstFind missing or outdated drivers fast.Check DriversOctober DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix Now×
Skip to content
World desk6 min

How North America Will Power Its Data Center Boom

Data center demand is rising across the United States and Canada, but forecasts differ and grid pressure will depend on where projects land, when they connect and how power systems respond.
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

North America will need a mix of new generation, grid expansion, storage, efficiency and flexible demand to accommodate data center growth. The scale is substantial, but there is no single reliable North American total: U.S. and Canadian forecasts use different years, measures and scenarios, and many proposed projects may not proceed as planned. The most immediate challenge is regional—getting dependable power and grid capacity to the places where new facilities are built.

How much electricity will data centers need?

The U.S. forecasts point to rapid growth, but their figures are not interchangeable: some describe observed use, some model near-term growth, and others project a future share of national electricity demand. The Canadian outlooks are separate and use their own assumptions.

As an Amazon Associate I earn from qualifying purchases.

U.S. demand: observed growth and forecasts

Source and forecast vintage Measure What it says
Lawrence Berkeley National Laboratory (LBNL), 2025 update Observed and reference-case electricity-use growth U.S. data center electricity use rose 14% from 2023 to 2024. In the update’s reference case, it grows 22% from 2024 to 2025 and 29% from 2025 to 2026.
LBNL, 2025 update, as summarized by the U.S. Department of Energy (DOE) Share of U.S. electricity use in 2030 Estimated at 11.8%, with a modeled range of 9.5%–15.3%. The energy-use model estimates demand from projected equipment shipments; it does not directly model growth in grid or onsite energy supply.
LBNL, 2024 report, as summarized by DOE 2023 electricity use and share; earlier projection to 2028 Estimated 176 terawatt-hours (TWh), about 4.4% of U.S. electricity use, in 2023. Its earlier projection put 2028 use at 325–580 TWh, approximately 6.7%–12% of U.S. electricity. This is an earlier forecast vintage, not the 2025 update.

A TWh measures energy consumed over time, while a grid’s ability to serve a facility also depends on how much power it needs at a given moment and where it connects. A national share therefore cannot show whether a particular utility area has enough generation, transmission or local distribution capacity.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Canada: separate energy and capacity outlooks

Source and geography Measure Projection and qualification
Environment and Climate Change Canada (ECCC), 2025; Canada Modeled annual data center electricity demand 3 TWh in 2025, 11 TWh in 2030 and 16 TWh in 2035. ECCC projects utility generation growth, especially wind and nuclear, while Canada continues to be a net electricity exporter to the United States.
Canada Energy Regulator (CER), 2026 Current Measures scenario; Canada Additional data center load capacity 1.5 gigawatts (GW) by 2030 and 3.5 GW by 2050. These are scenario assumptions, not committed projects.
CER, 2026 Higher scenario; Canada Additional data center load capacity 2.7 GW by 2030 and 12 GW by 2050. These are scenario assumptions, not committed projects.
CER, 2026 Lower scenario; Canada Additional data center load capacity 0.5 GW by 2030 and 1.5 GW by 2050. These are scenario assumptions, not committed projects.
Independent Electricity System Operator (IESO), 2025; Ontario commercial data center sub-sector Net annual energy-demand projection 3 TWh in 2026 and 16 TWh in 2050. IESO says project numbers, locations, operating dates and demand profiles are uncertain.

These Canadian figures should not be added together. ECCC estimates national energy demand, the CER scenarios express assumed additional load in GW, and IESO covers Ontario’s commercial data center sub-sector. The CER expects much of Canadian growth in Ontario, Alberta and Quebec, but says actual growth could be higher or lower than its scenarios.

#1 Best Overall
Tecmojo 6U Wall Mount Server Cabinet IT Network Rack Enclosure Lockable Door and Side Panels Black, Cooling Fan, Standard Glass Door, 450mm Depth, for 19” IT Equipment, A/V Devices
  • Save valuable floor space: 6U wall mount server cabinet Dimensions: 13.78" H x21.65" W x17.72" D.Maximum mounting depth is 14.2"
  • Keep critical network equipment secure: glass door and side panels are lockable to prevent unauthorized access. Front door can be installed on either side of the front of the cabinet to satisfy your door swing orientation preference
  • Easy equipment configuration: Fully adjustable mounting rails and numbered U positions, with square holes for easy equipment mounting with top and bottom punch-out panels for easy cable access
  • Durability: Made of high quality cold rolled steel holds up to 110lb (50kg) (Easy Assembly Required)
  • PCI & HIPPA and EIA/ECA-310-E compliant

Why location matters more than a North American total

Data centers can add large, concentrated loads to a particular grid area. Two regions facing similar national growth can have different constraints depending on available generation, transmission, interconnections, local distribution capacity and the timing of projects. A facility’s demand profile also matters: round-the-clock operations place a premium on dependable supply, while flexibility can give grid operators more room to balance peaks.

In its 2026 outlook, the U.S. Energy Information Administration (EIA) forecasts average annual electricity-load growth from 2025 to 2027 of 10% in ERCOT and 3% in PJM. Those are forecasts for the ERCOT and PJM grid regions, not growth rates for data center facilities alone. EIA also identifies additional growth in central and southwestern parts of the United States.

The difference between a national energy forecast and a regional grid outlook is important: rising demand does not automatically mean the same strain everywhere, and a large national supply addition cannot relieve a local bottleneck unless power can reach the affected area. Project locations and operating schedules are also uncertain, as IESO notes for Ontario and the CER notes for its Canadian scenarios.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What could higher demand mean for prices?

EIA’s 2026 high-demand exercise estimates that, in 2027, wholesale electricity prices would be $37 per megawatt-hour (MWh) higher in ERCOT and $2.60/MWh higher in PJM than in EIA’s February 2026 Short-Term Energy Outlook (STEO) forecast. These are modeled regional wholesale-price changes in a high-demand scenario, not predictions of retail electricity bills.

Rank #2
Tecmojo 12U Wall Mount Server Cabinet IT Network Rack Enclosure Lockable Door and Side Panels Black,Cooling Fan,Glass Door,17.7inch Depth,for 19” IT Equipment,A/V Devices
  • Save valuable floor space: 12U wall mount server cabinet Dimensions: 24.25" H x21.65" W x17.72" D. MAXIMUM MOUNTING DEPTH is 14.2".
  • Keep critical network equipment secure: glass door and side panels are lockable to prevent unauthorized access; Front door can be installed on either side of the front of the cabinet to satisfy your door swing orientation preference
  • Easy equipment configuration: Fully adjustable mounting rails and numbered U positions, with square holes for easy equipment mounting with top and bottom punchout panels for easy cable access
  • Durability: Made of high quality cold rolled steel holds up to 110lb (50kg) (Easy Assembly Required)
  • PCI & HIPPA and EIA/ECA-310-E compliant

The exercise assumes demand grows faster while generating capacity remains at the level used in EIA’s February 2026 baseline assumptions. Under that condition, increased natural-gas generation is the primary source of incremental power, with other existing resources responding differently by region. The larger modeled price effect in ERCOT reflects that scenario and regional conditions; it is not a certainty, nor does it account for every possible new plant or grid upgrade.

Data centers are a major driver, but not the only one

The International Energy Agency (IEA), in its 2026 outlook, expects U.S. electricity use to increase by more than 420 TWh over the five years to 2030. It projects data centers to account for about half of that growth. Buildings, manufacturing and transportation are among the other contributors, so the increase should not be attributed to data centers alone.

For grid planners, this means data centers are part of a broader demand challenge. Power systems must serve new loads across sectors, sometimes in the same regions and time periods, while accounting for how quickly generation and network infrastructure can be added.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What can supply the additional power?

There is no single supply fix. DOE describes a portfolio spanning new generation, use of existing infrastructure, grid expansion, storage and ways to reduce or shift demand. Which combination works depends on local resources, project schedules and the reliability requirements of each grid.

Rank #3
Tecmojo 4U Wall Mount Rack,4U Rack 14 inch Depth,19" Network Rack for Shallow Server and IT Equipment, Network Switches,Patch Panel Bracket,110lbs(50kg) Weight Capacity,Black
  • Sturdy:4u server rack is construct from cold rolled steel, with a weight capacity of 110lbs(50kg); Electrostatic powder coat prevents rust and corrosion,quality finish
  • Direct use:Open and use, not having to assemble it.Network rack can be placed flat or mounted on the wall,also can be installed vertically under the table
  • Design Features:maximum mounting depth of 14 in,cables can be fixed on the side panel;Open frame server rack achieves effortless inspection, replacement and assemble
  • Installation:wall mount network rack is easy to install,with instructions or videos for reference;Equipped with multiple accessories, suitable for different needs
  • Application:EIA/ECA-310-E Compliant;wall mounted 4u rack fits all 19" racks and cabinets to hold various IT, network, and AV equipment;wall mount rack available in 4U, 6U, and 8U to choose
Option Role in meeting demand Consideration
Solar and land-based wind DOE identifies both as options that can scale relatively quickly and add electricity supply. Variable generation needs to be planned alongside transmission, storage and other resources that can help balance supply.
Batteries and other storage Can help shift electricity across time and support grid flexibility. Storage is one part of a portfolio; its contribution depends on system needs and how it is operated.
Existing nuclear and hydropower infrastructure DOE points to using existing facilities as part of the response to new demand. These resources are regionally situated; their availability cannot be assumed in every grid area.
Next-generation geothermal and nuclear DOE identifies these technologies as important potential sources of clean firm power. They are part of the longer-term clean-firm portfolio, not a basis for assuming immediate supply everywhere.
Transmission and reuse of retired power-station sites Transmission expansion can move power to growing areas; retired plant sites may offer locations to redevelop energy infrastructure. New supply alone does not resolve a delivery constraint unless the grid can connect and carry it.
Efficiency and flexible demand Efficiency can reduce the electricity needed for a given level of computing service; flexibility can shift some demand to times when the grid has more room. Continuous data center operations make the amount and timing of flexibility important to establish rather than assume.

Planning, interconnection decisions and rate structures also shape whether the new load can be served reliably and how grid costs are managed. The central issue is not simply how much generation is built, but whether enough power and delivery capacity are available in the right places and at the right times.

What the forecasts do—and do not—say

The estimates describe possible demand under particular models and assumptions, not a guaranteed buildout. LBNL’s 2025 estimate of the U.S. data center share in 2030 models energy use but does not directly model growth in grid or onsite supply. CER’s long-range Canadian numbers are scenario inputs, and IESO explicitly identifies uncertainty about the projects behind its Ontario outlook. EIA’s wholesale-price results are conditional on a high-demand case and its stated capacity assumptions.

DOE’s December 20, 2024 announcement quoted then-U.S. Energy Secretary Jennifer M. Granholm: “We can meet this growth with clean energy.” That was advocacy framing at the time, not a guarantee that all projected load will be served by clean power. The outlooks cited here do not establish a directly comparable combined North American data center load, project-by-project economics, continent-wide retail-bill effects or a single data-center-specific emissions figure.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More from the Wire

  1. World desk4 min
    How to Spot an AI Voice Scam Before Sending MoneyDon’t rely on how a caller sounds. Pause, call back through a known number, and verify the emergency with another trusted person before sending money.
  2. Mountain View desk4 min
    Google’s SynthID Detector: How to Check AI-Generated Images, Video and AudioGoogle’s SynthID Detector looks for an embedded watermark in supported images, video and audio. Here is what its results do—and do not—show.
  3. Redmond desk20 min
    How to create a link to File or Folder in Windows 11Windows 11 gives you several ways to point to a file or folder without moving or duplicating it. You can create a desktop shortcut,…
Recommended PC Tool
Recommended PC Tool
Outdated Drivers Are Slowing You DownFree scan - exact matches
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.