There is no reliable single number for how long it takes to build and license a small modular reactor (SMR). A project schedule can span design review, site-specific approvals, construction, commissioning and permission to operate—and the duration depends on the country, design, site, licensing route and whether the project is a first-of-a-kind or repeat build. A published 36-month construction target, for example, covers only one defined part of one project’s schedule.
What does “build and license” include?
The phrase can refer to several different endpoints. A useful schedule separates these stages rather than treating them as one continuous construction period:
As an Amazon Associate I earn from qualifying purchases.
- Design development and generic review or certification: The design is developed and assessed under the relevant national regulatory framework. This work can happen before a specific site is ready.
- Site-specific preparation and licensing: The project prepares its site, safety and environmental information, and licensee organization for the required approvals. Long-lead equipment procurement may also proceed during this period.
- Construction and commissioning: Construction starts at a stated milestone—often first nuclear concrete—and continues through a separately defined endpoint. Commissioning and readiness for fuel loading are not necessarily included in a construction figure.
- Operating authorization and commercial operation: Permission to construct is not permission to operate. The project must complete the applicable safety milestones and obtain the operating authorization required in its jurisdiction before it can operate commercially.
The IAEA describes a traditional two-stage pattern of a construction license followed by an operating license. Actual licensing routes vary by country and project.
What do published project schedules show?
The figures below illustrate different milestones; they are not a universal SMR timeline or a directly comparable pair of end-to-end schedules.
#1 Best Overall
- Exquisite Appearance: This is a simple MK1 Arc Reactor model with an integrated blue LED light that emits an impressive glow, whether during the day or at night.
- Disassembled Kit: This reactor comes as a DIY assembly kit with a detailed instruction to ensure you can successfully complete the assembly.
- Complete Accessories: Including a USB power cable with a switch and a simple acrylic stand. Additionally, essential components come with spares for replacement in case of damage during assembly.
- Home Decor Piece: Used for various creative projects, such as computer case modifications, electric vehicle lighting upgrades, or as a unique nightlight or desk decoration. Arouse your creativity and imagination to personalize your decor.
- Notes: Glue is required (Not Included) during the assembly process. You will also need to provide your own 5V USB charging adapter, or you can power it by connecting to a power bank or computer.
| Project or schedule | Published timing | What the milestone means |
|---|---|---|
| Westinghouse AP300, as reproduced in the IAEA’s 2024 catalogue | Regulator certification targeted for 2027; site-specific design and licensing and long-lead procurement planned for 2027–2030; construction readiness targeted for 2030 | These are project schedule targets for separate pre-construction milestones, not completed approvals. |
| Westinghouse AP300, as reproduced in the IAEA’s 2024 catalogue | 36 months | The planned nth-of-a-kind construction interval, measured from first nuclear concrete to readiness for fuel loading. It does not include the earlier design and licensing stages, and it is not a claim that the plant will be commercially operating 36 months after first concrete. |
| Westinghouse AP300, as reproduced in the IAEA’s 2024 catalogue | Commercial operation targeted for 2033–2034 | A project target listed alongside earlier design, licensing and construction milestones; it is not a guarantee of the actual operating date. |
| Holtec SMR-300, U.S. Nuclear Regulatory Commission update of January 13, 2026 | Second part of the construction-permit application expected by mid-2027; planned detailed technical review of no more than 18 months if the application is sufficient and docketed | This is an in-progress application and a conditional review schedule. It is not a total licensing, construction or build-to-operation estimate. |
The NRC said Holtec had submitted the first part of its two-part construction-permit application for a proposed project at Palisades. The agency also said that a construction permit would leave additional safety milestones before an operating license. The application and review schedule therefore cannot be read as permission to operate or as a complete project duration.
Why can one SMR schedule differ from another?
- Country and licensing route: National regulators set their own requirements and review processes. A schedule from one jurisdiction should not be assumed to apply in another.
- First-of-a-kind versus nth-of-a-kind: A first deployment and a repeat build are different cases. The IAEA SMR Regulators’ Forum identifies potential licensing differences between FOAK and NOAK designs; the AP300’s 36-month figure is specifically for a planned nth-of-a-kind construction interval.
- Design maturity and site readiness: A generic design milestone does not establish that site-specific approvals are complete. Site and licensee preparation can affect when construction authorization is ready.
- Number of modules: Single- and multi-module facilities can raise different regulatory and deployment considerations. A duration for one configuration should not automatically be assigned to another.
- Chosen start and finish points: First nuclear concrete to readiness for fuel loading is a narrower interval than design start to commercial operation. Commissioning, fuel loading, operating authorization and commercial operation may fall outside a quoted construction duration.
The IAEA’s 2020 deployment timeline is a historical illustration of differing design, licensing, construction and commissioning sequences, not a current schedule for the named projects. International regulatory cooperation is intended to support collaboration while preserving national regulators’ decision-making authority; the IAEA reported that a Regulatory Cooperation Toolkit was made available in 2026. The cited material does not quantify how much time cooperation saves.
Rank #2
- 1. Very cool illuminant arc reactor ornament lamp.
- 2. Night light, powerer by USB cord, variable brightness.
- 3. 1:1 arc reactor model with real effect.
- 4. Delicate design and details makes high quality effect.
- 5. Compared with the drive-by-wire one, the wireless remote control one has more amazing modes than always-on mode. We can make use of the remote controller to switch mode such as Beating Damage Mode and Slow Breathing Mode, whose key distinction is the flash frequency of lighting. What’s more, you can adjust the brightness and set up the gradient mode.
How should you compare two SMR timeline claims?
Check whether both claims describe the same project stage and endpoint. Before comparing durations, identify:
Quick wins for a faster PC:
Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Repair Windows errors before they cause bigger problemsFix Now →- the country and licensing route;
- whether the project is FOAK or NOAK, and whether it is single- or multi-module;
- the design-review or certification status and the status of site-specific approvals;
- the construction start and finish milestones, including whether commissioning or fuel loading is included; and
- whether the stated endpoint is an operating license, startup or commercial operation.
Without those details, a short construction estimate can be mistaken for a full build-and-license schedule. The available figures are project targets and a regulator’s conditional review schedule; they do not establish a representative global average of licensing-to-commercial-operation time.
Quick Recap
Rank #4
- Wireless Power Transmission: Powered through electromagnetic induction, it requires no cables or built-in batteries. It emits a soft LED light that is gentle on the eyes and has a long lifespan.
- Exquisite Craftsmanship and Superior Quality: Made from polymer benzene and alloy, it features a transparent base revealing the magnets and coils, enhancing its aesthetic appeal.
- Distinct Features of First and Second Generation: The front design differs between generations, while the back remains the same. The first generation has a transparent ring with a 24-hole black front ring, while the second generation features a fluorescent green ring and a gray alloy front ring.
- Magnetic Levitation Arc Reactor: Utilizing advanced magnetic levitation technology, this arc reactor floats and rotates in mid-air without any support or contact, creating a futuristic and awe-inspiring presence. The LED lighting adds to its high-tech appeal.
- Multi-scenario application: suitable for placement on a desk, nightstand or any space that needs a little something special; also a great addition to museum exhibits and collections around film and television.
Rank #3
- Precision Naval Engineering: Experience the power of a modern nuclear-powered submarine through this highly detailed 1:125 Los Angeles Class SSN building set. From the tactical hull shape to the realistic command tower, every angle captures the iconic silhouette of a true military submarine
- Immersive Interior Exploration: Removable side panels reveal detailed internal compartments inspired by real submarine engineering. Explore the reactor section, torpedo area, and control spaces while enjoying a hands-on building journey that feels both technical and cinematic
- Built to Command Attention: Measuring over 34 inches long, this collectible submarine model transforms instantly into a striking display piece. Whether showcased in a home office, collector shelf, or man cave, it delivers a bold military aesthetic that becomes an instant conversation starter
- A Rewarding Build for Adults & Teens: With 2,988 precision-fit pieces, this military building set offers a deeply satisfying and relaxing building experience. Perfect for adults, teens 14+, military enthusiasts, and anyone who enjoys immersive model projects with authentic detail
- Premium Gift for Military Collectors: Designed for builders who appreciate naval history and engineering, this submarine model kit makes an unforgettable gift for birthdays, Father’s Day, holidays, or special occasions. A collectible centerpiece that combines creativity, display value, and military craftsmanship
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.