Free tools Windows power users keep installed
One-click scans. No signup required.
Moeve has started construction of Onuba, the first phase of the Andalusian Green Hydrogen Valley, at its Energy Park in Palos de la Frontera, Huelva. The project is intended to become one of Europe’s biggest renewable-hydrogen developments, with the first plant scheduled to enter service in 2029.
What started in Huelva
Construction began on 17 September 2026 at Moeve’s Energy Park in Palos de la Frontera, in Spain’s Huelva province. Onuba is the name of the initial development and the first build-out of the wider Andalusian Green Hydrogen Valley.
| # | Preview | Product | Price | |
|---|---|---|---|---|
| 1 |
|
HydroCell Kit For Truck | $235.68 | Buy on Amazon |
| 2 |
|
Horizon Fuel Cell Technologies Solar Hydrogen Education Kit | $115.00 | Buy on Amazon |
| 3 |
|
HydroCell PLUS Kit | $349.87 | Buy on Amazon |
| 4 |
|
Hydrogen Fuel Cell Electric Car Hydrogen and Oxygen Power Generation Clean Energy Vehicle Model... | $109.99 | Buy on Amazon |
| 5 |
|
HydroCell Plus | $174.63 | Buy on Amazon |
As an Amazon Associate I earn from qualifying purchases.
Moeve describes the valley as Europe’s largest renewable-hydrogen project. Engineering News-Record uses the same framing for the broader development and reports that the first phase is expected to operate in 2029. That “largest” description is a developer and trade-publication characterization and can change as competing European projects are approved, financed and built.
Do these 3 things before closing this tab:
1Repair Windows errors before they cause bigger problems2Scan for outdated or missing drivers - takes under a minute3Clear out junk files and repair common Windows errorsMoeve chief executive Maarten Wetselaar said the project moves the company “from green hydrogen pilot projects towards the chapter of large-scale construction.” Spanish Prime Minister Pedro Sánchez said the government’s goal is to provide investment certainty and expand industrial supply, while European Commission Executive Vice-President Teresa Ribera called the energy transition an opportunity to make industry stronger, more innovative and more autonomous.
#1 Best Overall
- Complete kit for gas carburetor engine Cell produces 2.25 LPM at 30 amps
- 1 quart reservoir/bubblier last 1000 miles measures 6"x5"x4" Up To small V8
- Includes PDF copy of our new book Converted. We Work With All Members To Get Them Results
- Converted is the must have PDF for HHO education. Includes installation manuals along with our vehicle database
- Vehicle database shows all cars we/members have installed on, with their MPG results and how acheived
Onuba’s first-phase specifications
| Metric | Onuba first phase |
|---|---|
| Electrolyzer capacity | 300 MW |
| Expansion option | An additional 105 MW, according to Moeve |
| Investment | More than €1 billion; Engineering News-Record presents the same commitment as approximately $1.2 billion |
| Planned operation | 2029 |
| Public support | €304 million from Spain’s Recovery, Transformation and Resilience Plan, financed by NextGenerationEU |
The dollar figure is a currency presentation of the more-than-€1-billion investment, not a second investment package. The electrolyzers will use renewable electricity to split water into hydrogen and oxygen; the project materials identify the product as renewable, or green, hydrogen.
How large the full valley could become
Onuba is only the first phase. The Andalusian Green Hydrogen Valley’s stated long-term ambition is 2 GW of combined electrolysis capacity and as much as 300,000 tonnes of green hydrogen production each year. Those figures describe the entire valley rather than the 300 MW Onuba installation.
Rank #2
- Horizon puts renewable energy technology into the hands of our future scientists
- Solar Hydrogen Education Kit generates clean energy using the sun
- Renewable hydrogen is created using only solar energy and water
- Combining cutting-edge science, education and fun for all!
- Includes fuel cell, small electric motor, propeller blade, experiment manual and assembly guide
The development is intended to supply sectors in which direct electrification is difficult. Planned applications include lower-carbon fuels for road, aviation and maritime transport, as well as industrial uses. Engineering News-Record identifies chemical production, steel, cement, heavy maritime transport and aviation among the potential customers and links the plan to a maritime hydrogen corridor connecting southern Europe with northern Europe through Rotterdam.
Who owns and is building Onuba
Moeve is the controlling investor, with a 51% stake. Hy24 and COFIDES together hold 29%, while Enagás Renovable and Alter Enersun hold the remaining 20%.
Rank #3
- Complete kit for Large Commercial Diesel engines Cell produces 7 LPM at 30 amps
- 1 quart reservoir/bubblier last 600 miles measures 6"x5"x4" Up To small V8
- Includes PDF copy of our new book Converted. We Work With All Members To Get Them Results
- Converted is the must have PDF for HHO education. Includes installation manuals along with our vehicle database
- Vehicle database shows all cars we/members have installed on, with their MPG results and how acheived
| Participant | Role or interest |
|---|---|
| Moeve | 51% owner and project lead |
| Hy24 and COFIDES | 29% combined ownership |
| Enagás Renovable and Alter Enersun | 20% combined ownership |
| Siemens Energy | Leader of the engineering, procurement and construction consortium |
| STRABAG | Civil-works contractor |
| Thyssenkrupp Nucera | Primary alkaline-electrolyzer supplier |
| Alfa Laval and Industrie De Nora | Additional key suppliers identified by Engineering News-Record |
Expected production and emissions benefit
Moeve says the first phase is designed to produce about 45,000 tonnes of renewable hydrogen annually. It estimates that output could avoid around 250,000 tonnes of carbon-dioxide emissions each year compared with the higher-carbon fuels and industrial inputs the hydrogen is intended to replace.
The actual climate benefit will depend on the renewable-power supply, operating rate, transport arrangements and the fossil-based processes displaced by customers. The published figures are project targets, not a measured operating result, because the plant has not yet entered service.
Rank #4
- The Hydrogen fuel trolley uses zinc particles and food grade citric acid to synthesize hydrogen, and then uses the produced hydrogen and air to generate electricity to drive the trolley.
- During the experiment, please use 80℃ hot water for Combination reaction (if the water temperature is low, the amount of hydrogen and air pressure from the Combination reaction are insufficient, the fuel cell cannot be used for power generation), and then take off the plug of the vent pipe at the lower part of the fuel cell, release the gas in the rubber hose immediately, and then plug it back immediately, so that only pure hydrogen and air are in the fuel cell, so that the fuel cell can generate hydrogen air power.
Why the project matters to Spain and Europe
Huelva combines an established energy-and-chemical industrial base with access to port infrastructure and transport links. Building production where hydrogen can be consumed or moved into other fuels is intended to reduce the need to ship a finished product over long distances and to support hard-to-abate industries in southern Spain.
For Spain, the €304 million public contribution makes Onuba part of the country’s wider industrial and energy-transition strategy. For Europe, the project is a test of whether very large electrolyzers can be delivered on schedule, connected to sufficient renewable electricity and integrated with industrial offtakers. The proposed corridor toward Rotterdam also depends on infrastructure beyond the plant itself, including storage, pipelines, ports and compatible fuel facilities.
Quick Recap
Best Value
What happens between construction and 2029
- Engineering and civil works: The EPC consortium and STRABAG must complete detailed design, site preparation and construction at the Huelva Energy Park.
- Electrolyzer installation: Thyssenkrupp Nucera’s alkaline systems and associated equipment from the other suppliers must be installed, connected and commissioned.
- Renewable-power and water systems: The project must secure the electricity, water treatment and grid or dedicated renewable connections needed for continuous operation.
- Industrial integration: Moeve and its partners must finalize the transport, storage and customer arrangements for fuels and industrial users.
- Testing and start-up: Commissioning will determine whether the facility can reach commercial operation in the 2029 target window.
What to watch
- Whether the optional 105 MW expansion is approved and financed.
- Progress against the 2029 operating target.
- Confirmation of renewable-power and infrastructure connections.
- Conversion of the valley-wide 2 GW ambition into separately financed projects.
- Actual customer contracts in aviation, shipping, chemicals, steel and cement.
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.




