For a terminal gate-to-gate measure, calculate truck turnaround time by subtracting the actual terminal gate-in completion timestamp from the actual terminal gate-out completion timestamp for the same truck visit. The subtraction is simple; the critical modeling choice is defining which gate events count and keeping them tied to one visit.
Define the interval before calculating it
TIC 4.0 defines Truck Turnaround Time as the average time an external truck spends on a terminal during a carrier-visit process. Its start is completion of terminal gate-in; its endpoint is completion of terminal gate-out. The KPI applies to terminals, truck companies, trucks and gates, and can be expressed in minutes or hours. TIC 4.0’s Truck Turnaround Time definition names actual arrival-terminal-gate-end and departure-terminal-gate-end timestamps.
Do not silently substitute a port-gate boundary or a broader visit interval. TIC 4.0 describes a PortGate as a carrier passing port-gate or pre-gate facilities; entry and exit at that boundary may happen inbound or outbound. Some ports do not have a designated port gate, and their process may coincide with the terminal gate. Name the boundary in your event data and metric. TIC 4.0’s PortGate definition
Queueing outside a terminal is another distinct interval. PierPass distinguishes outside queue time, time inside the terminal and total visit time, with total visit time described as queue time plus terminal time. A terminal-gate-to-gate calculation therefore does not include the outside queue. PierPass’s explanation of truck visit time
#1 Best Overall
- PLAN EVERY DELIVERY — solcing challenges requires planning and foresight. Because moving one truck out of the wrong exit at the wrong moment can gridlock the entire board, you have to plan your whole sequence of deliveries in advance and adapt as the traffic changes. It is a satisfying test of logic, planning and flexible thinking for anyone who enjoys a proper think-ahead puzzle — and it is so absorbing that one more challenge quickly turns into several.
- DESIGNED FOR AGES 9 TO ADULT — 80 CHALLENGES, EASY TO EXPERT — With one of the higher starting ages in the SmartGames range, this game is built for older kids and adults who want a serious planning challenge. Early challenges ease you into the loading docks; expert challenges pack the grid with trucks and demand that you think many moves ahead. A single game that rewards a sharp 9-year-old and a seasoned puzzler alike.
- LOAD THE TRUCKS, PLAN THE EXITS, CLEAR THE CHAOS — The loading docks are gridlocked, and only you can clear the chaos! Choose a challenge and place the trucks and cargo on the 4x5 grid as shown. Load each cargo piece onto its correct truck, then drive the trucks out through the five exits to make the deliveries. The real challenge is the order you leave in: send a truck out too soon and you can trap the others, jamming the whole board. Plan every exit. One solution each time.
- BRAIN HEALTH FOR EVERY GENERATION — The same logistics puzzle that sharpens a young player's planning gives adults a satisfying strategic challenge and offers older adults the kind of engaging mental workout that helps keep the mind sharp and active. Screen-free and endlessly re-playable across 80 challenges, it is a thoughtful gift for a puzzle-loving child, a strategy fan, or a grandparent who enjoys a genuine brain-bender.
- AWARD-WINNING BELGIAN DESIGN — SmartGames is the worldwide leader in multi-level logic games, with 30+ years of award-winning design from Belgium, trusted by families, educators and puzzle lovers in 80+ countries.
Model each event with its visit and meaning
A minimal event record should retain a stable identifier for the truck visit, the type of event, and its timestamp. A vehicle identifier and the originating system are useful additional fields. For example:
GateEvent
visit_id stable identifier for one truck visit
vehicle_id truck identity recorded by the facility
event_type GATE_IN, WEIGH_1, DOCK_IN, DOCK_OUT, WEIGH_2, GATE_OUT, etc.
event_at timestamp with an explicit timezone or offset
source reader, terminal operating system, or other source
The key is that visit_id identifies one carrier visit, not merely a truck that may enter the facility repeatedly. Event names should express what happened, and the timestamps should identify the completion moments used by the KPI. This is a practical data-model recommendation, not a schema mandated by TIC 4.0 or CODECO.
Rank #2
- Curious Cargo is a two player game where you go head-to-head against your opponent by building up the infrastructure of your facility, calling in trucks at the right moment, all while perfectly timing the shipping and receiving of cargo to score the most points. Connect an interweaving network of lines to your shipping and receiving spaces. Ship your custom-shaped cargo tokens to your opponent to interfere with their logistics plans!
- The puzzling nature of Ryan Courtney's Pipeline comes alive in Curious Cargo! With 6 unique player boards for each player and 2 game modes, a skillful challenge awaits even the sharpest competitor.
- 2 players
- 30-60 minute play time
- Ages 12+
CODECO, a UN/EDIFACT message, is a gate-in/gate-out report used to confirm delivery or pickup of specified containers by inland carriers. Terminals, depots and similar parties use it for electronic data interchange. Gate timestamps may also be recorded in a terminal operating system. These are plausible operational sources, not a guarantee that every facility uses the same fields or implementation. UNECE’s UN/EDIFACT message directory and a study describing terminal performance monitoring
Calculate elapsed time for each visit
- Group events by the stable
visit_id. - For each visit, select the actual timestamp marking completion of terminal gate-in.
- Select the actual timestamp marking completion of terminal gate-out for that same visit.
- Subtract the start from the end and convert the result to the unit you report.
for each visit_id:
start = actual timestamp for completion of terminal gate-in
end = actual timestamp for completion of terminal gate-out
turnaround_minutes = (end - start).total_seconds() / 60
This calculation presumes a valid start/end pair, an end later than the start, and timestamps interpreted on a consistent time basis. Those are implementation assumptions to document; the KPI definition does not establish universal rules for duplicate scans, missing endpoints, clock corrections, timezone normalization or negative intervals. Decide how your system handles those cases rather than presenting a local cleanup rule as an industry standard.
Rank #3
- INSPIRED BY THE SMASH-HIT TV SERIES: A world filled with secret agendas and cunning strategy is brought to life in this thrilling board game adaptation
- A HIDDEN TRAITOR LIES AMONG YOU: One player is secretly working against the group, sabotaging missions, and plotting to claim the prize for themselves
- DISCOVER SHIELDS AND REWARDS IN THE ARMORY: Use these powerful tools to protect yourself and tip the scales in your favor
- CONFRONTATION AT THE ROUND TABLE: Accuse, argue, and of course, vote! Will you banish the Traitor or unknowingly turn on an innocent Faithful?
- OUTSMART EVERYONE AND SURVIVE THE NIGHT: Only the most cunning will survive. Recommended for 4-6 players, ages 12 and up.
Keep intermediate events for operational analysis
Events such as weighbridge readings, dock entry and exit, and bay calls can help explain where time is spent within a visit. Keep them as separate event types instead of treating them as replacements for the gate-in and gate-out endpoints. They enable a more detailed breakdown, while the basic terminal turnaround interval remains the time between completion of terminal gate-in and completion of terminal gate-out. A published example data model likewise lists visit, vehicle and stage fields alongside gate and intermediate stages. Example gate-event data model
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Report enough context to make the figure comparable
Publish the boundary, unit, time period, aggregation method and any grouping with the result. TIC 4.0’s examples include hour, day, month and year buckets, with splits such as truck operator or flow type. Its KPI is an average per carrier visit; if a report instead uses a median, percentile or another statistic, label that clearly.
Rank #4
- COMPLETE THE CONSTRUCTION PROJECT BEFORE THE BIG STORM ARRIVES - Help the builders work around the construction site and collect supplies to finish the project on time! Race around to collect the supplies and materials needed to finish your construction project, but make sure you finish the project before the big storm arrives and washes everything away. Perfect for 2-4 players ages 4 and up.
- FUN AND EDUCATIONAL - Construction Kids is designed to keep kids engaged while learning new skills. This cooperative game lays out a colorful and exciting setting that allows kids to use their creativity and imagination. Simple instructions, visual matching, and easy counting make Construction Kids the perfect introduction to board games for kids 4 and up.
- BUILD NEW SKILLS AT THE CONSTRUCTION SITE - Playing Construction Kids will help kids develop skills like strategic thinking, communication, basic counting, and turn-taking, all while having fun! Our games are designed by teachers to aid in development through hands-on play at home and in the classroom.
- LEARN TOGETHER, WIN TOGETHER - This cooperative board game emphasizes play and collaboration. Players share ideas and strategies together to complete their construction project before the big storm arrives and knocks it down. This game encourages young learners and teaches that learning new skills and winning as a team is fun!
- FUN FOR THE WHOLE FAMILY - Construction Kids is the perfect family gift! Working together to build a new project on schedule will keep both kids and parents entertained. Box contains 1 game board, 4 builder tokens, 6 construction project tiles, 1 storm token, and 96 cards.
- Boundary: terminal gate, port gate or another explicitly defined start and end.
- Queue treatment: whether the interval begins at terminal entry or includes an outside queue.
- Event semantics: whether timestamps represent completion of gate-in and gate-out, as in the TIC 4.0 definition.
- Aggregation: average per visit or another statistic, plus the relevant time bucket and operator or flow split.
APM Terminals describes its own truck turn-time calculation as running from a truck entering its gate until it leaves. That operator-specific description is consistent with a gate-to-gate measure, but it should not be treated as a universal boundary definition. APM Terminals’ truck turn-times page
When comparing facilities, align the boundary, queue inclusion, event meanings and aggregation first. If those differ, the figures measure different intervals even if both are called truck turnaround time.
The Tool Desk
Outbyte Driver Updater FREEScan for outdated or missing drivers - takes under a minuteDriver Scan →Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Quick Recap
Best Value
- Engaging Construction Theme: Immerse yourself in the thrilling world of construction with this captivating board game.
- Strategic Gameplay: Strategically plan and execute construction projects, managing resources and overcoming challenges.
- Family-Friendly Fun: Suitable for players of all ages, fostering teamwork, problem-solving, and friendly competition.
- Educational Value: Introduces concepts of urban planning, resource management, and project execution in a fun, interactive way.
- Replayability: With varying game scenarios and objectives, each playthrough offers a unique and engaging experience.
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.