Clearstone Energy Limited’s appeal to build a 150 MW battery energy storage system near Axminster, Devon, was dismissed on 13 August 2026. Reporting on the decision says the inspector was not satisfied that the proposed explosion-mitigation measures and fire-water containment had been shown to protect groundwater adequately. The appeal also raised concerns about the development’s effect on the rural landscape.
Which energy storage appeal was dismissed?
The decision concerns Clearstone Energy Limited’s proposal for a battery energy storage system at land just south of Hazlehurst, Raymonds Hill, near Axminster in Devon. The Planning Inspectorate’s official record identifies East Devon District Council as the local planning authority and lists the inquiry appeal, reference APP/U1105/W/25/3369854, as dismissed on 13 August 2026. Planning Inspectorate case record
As an Amazon Associate I earn from qualifying purchases.
ESS News identifies the project as the Axminster Energy Hub and reports a proposed capacity of 150 MW. It says East Devon District Council refused the planning application in May 2025 and Clearstone appealed; the council later withdrew its opposition during the appeal, while local groups continued to oppose the scheme. ESS News report, 19 August 2026
Quick wins for a faster PC:
Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →Repair Windows errors before they cause bigger problemsFix Now →Why was the appeal rejected?
The reported central concern was whether a fire or explosion could be managed without polluting aquifers or degrading groundwater quality, with particular regard to residents’ health and safety. The inspector’s reported reasoning focused on the evidence for explosion mitigation and on whether fire water could be contained if an incident occurred.
#1 Best Overall
- 49 Min UltraFast Recharging: With upgraded HyperFlash tech, fully recharge at 1,600W—for outage prepping, camping trips, or tailgating events. Enable it in the Anker app.
- 2,000W Output via 10 Ports: Delivers 2,000W (3,000W peak) and 1,024Wh capacity. Power up to 10 devices—ideal for emergency backup, remote work setups, tiny homes, and off‑grid living.
- Compact and Portable: Easily carry, store, and move from room to room, your RV, or even on beach and park outings. C1000 Gen 2 is 14% smaller and 11% lighter than similar models.
- 10 Years of InfiniPower: Built to last through years of daily backup and RV and van life. After 4,000 cycles, the battery still has at least 80% capacity.
- 1.8 Hr Solar Recharging: Go fully off‑grid with sustainable power for tiny homes, camping RV off‑grid setups, and remote locations. Plug in 600W (60V max) of solar and recharge in just 1.8 hours.
According to ESS News, the inspector wrote: “I am not persuaded that there is sufficient robust evidence to demonstrate that the deflagration/explosion mitigation strategies would work effectively and that explosion hazards would be satisfactorily controlled for cabinets 10cm apart.” The publication also reports that the inspector considered fire safety to weigh very heavily against the proposal, and said that uncertainty about fire safety meant they could not be confident that measures such as the fire-water retention blanket would prevent aquifer pollution or control groundwater quality. ESS News report
Those statements are reported as the inspector’s conclusions, but the full decision document linked on the Planning Inspectorate case record is the source for the complete findings and planning balance.
What battery system was proposed?
ESS News reports that the scheme included 52 Wärtsilä Quantum 1 units, described as lithium iron phosphate batteries, for a proposed 150 MW project. The cabinet spacing discussed in the inspector’s reported explosion-mitigation reasoning was 10 cm. These are details of this specific proposal, not guidance for other battery sites. ESS News report
Do these 3 things before closing this tab:
1Repair Windows errors before they cause bigger problems2Scan for outdated or missing drivers - takes under a minute3Clear out junk files and repair common Windows errorsRank #2
- Essential Home Backup: The Jackery HomePower 3600 Plus delivers 3600W output (7200W in parallel) to run pumps, heaters, and dryers with ease. With dual voltage (120V & 240V in parallel) and 3584Wh capacity expandable to 21kWh per unit or 43kWh with multiple units, it can power a 3-person household for over 2 weeks.
- Safe Power That Lasts: Built with high-temp resistant ceramic membrane battery cells tested at 302 °F, the Jackery HomePower 3600 Plus Portable Power Station prevents thermal runaway from heat or overcharge. Offering 6,000 cycles and a 10-year lifespan, it delivers safe, reliable even in -4 °F blizzards.
- Plug-and-Play: With its easy plug-and-play design, the Jackery HomePower 3600 Plus, paired with MTS, powers your home effortlessly—no complex installation required. Whether at work, in the kitchen, or with family, simply plug in, press "Power-On" and keep life running smoothly through any outage.
- 4 Charging Options: With 4 convenient ways to charge, the Jackery HomePower 3600 Plus solar generator can be fully recharged from 0–100% in just 2 hours via hybrid AC+DC. It also supports charging via AC in 2.5 hours, solar in 4 hours, or a gas generator in 2.5 hours —delivering a full day of quiet, clean energy.
- Ultra-Portable & Lightweight: The Jackery HomePower 3600 Plus, the lightest 3.6kWh LFP power station, boasts automotive-grade CTB tech and is 34% smaller and 29.3% lighter than other models. Its luggage-style design with wheels and a telescopic handle allows effortless rolling from kitchen to garage or beyond.
The report also describes evidence about the system’s deployment and safety testing. That evidence should not be read as establishing that site-specific hazards were adequately controlled: the reported decision turned on whether the mitigation and containment case for this proposal was sufficiently robust.
How did landscape concerns figure in the case?
The appeal also concerned the development’s effect on the character and appearance of the area, including the Dorset National Landscape. ESS News reports that the scheme’s industrial appearance in a rural setting was a concern. The official case record confirms the outcome, but the detailed landscape findings and the inspector’s full balance of planning considerations are in the decision document linked from the case record.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.What do the fire-risk figures in coverage mean?
ESS News attributes an estimate of approximately 10% probability of at least one fire over the proposed project’s 40-year lifetime to Jeremy Ramsden, an expert for the opposing Rule 6 Party. The estimate was reported as based on standard calculations using 2025 failure rates. It is a case-specific expert estimate, not an independently established general fire rate for battery energy storage systems.
Rank #3
- 1500VA/1000W PFC Sinewave Uninterruptible Power Supply (UPS): Uses sine wave output to provide battery backup power for Active PFC & conventional power supplies; Safeguards computers, workstations, network devices, and telecom equipment
- 12 NEMA 5-15R OUTLETS: 6 battery backup & surge protected outlets, 6 surge protected outlets; INPUT: NEMA 5-15P right angle, 45 degree offset plug with 5 foot power cord; 2 USB charge ports (1 Type-A, 1 Type-C) quickly charge phones and tablets
- MULTIFUNCTION, COLOR LCD PANEL: Displays immediate, detailed information on battery and power conditions; Color display alerts users to potential issues before they can affect critical equipment and cause downtime; Screen tilts up to 22 degrees
- AUTOMATIC VOLTAGE REGULATION (AVR): Corrects minor power fluctuations without switching to battery power; UL SAFETY CERTIFIED: Product has been tested in a UL certified lab and listed with UL as meeting or exceeding safety standards
- 3-YEAR WARRANTY – INCLUDING THE BATTERY; $500,000 Connected Equipment Guarantee; FREE PowerPanel Management Software (Download)
The same report attributes inspection figures to Clean Energy Associates: 26% of BESS units inspected had defects in fire suppression systems, 18% had thermal management system defects, and system-level defects accounted for nearly 50% of quality-assurance findings. These figures describe that organization’s inspection findings; they do not measure conditions at Axminster or establish rates across all battery storage installations. ESS News report
Recommended Free Tools
What does this decision mean for other battery projects?
The dismissal is the outcome of one planning appeal involving a particular site, design and evidential record. It does not establish that all battery energy storage systems are unsafe, nor that following a specific guideline guarantees planning permission. For another proposal, relevant questions may include how explosion hazards are modelled and mitigated, how fire water would be retained, the route by which contaminants could reach groundwater, emergency response arrangements, consultation evidence and landscape effects.
Clearstone’s response, as quoted by ESS News, was that the decision was concerning for UK BESS projects and government plans. That is the appellant’s view; it is distinct from the inspector’s findings. ESS News report