There is no single nationwide permit for produced-water storage. The approvals depend on the state or tribal jurisdiction, whether the water is held in tanks or an impoundment, whether the activity is part of oil-and-gas exploration and production (E&P), and what happens to the water afterward. A surface container may be subject to state oil-and-gas, solid-waste, groundwater, or pollution-control rules even when the water is excluded from federal hazardous-waste regulation.
Before identifying permits, document the location, operator relationship, storage design, volume and duration, fluid composition, nearby waters and groundwater, and planned destination. Storage, discharge, underground injection, stormwater management, and spill prevention are separate regulatory questions.
As an Amazon Associate I earn from qualifying purchases.
The regulatory answer in one view
Produced water is water brought to the surface during oil and gas production. It commonly contains salts, hydrocarbons, treatment chemicals, and naturally occurring constituents, so regulators focus on containment, releases, groundwater protection, and the water’s final disposition.
Recommended Free Tools
| Regulatory pathway | When it matters | What it covers | What it does not authorize |
|---|---|---|---|
| RCRA and state solid-waste rules | The fluid is an E&P waste or is mixed with other wastes. | Waste classification and state controls for storage, handling, closure, and releases. | It is not a blanket permission to store without a state approval or containment controls. |
| Clean Water Act section 402/NPDES | Produced water or contaminated runoff is discharged from a point source to a water of the United States. | Authorized surface-water discharges and applicable stormwater discharges. | It does not authorize mere storage or underground injection. |
| Underground Injection Control (UIC) | Water is sent to a disposal or enhanced-recovery well. | Class II injection wells and related aquifer-exemption decisions. | It is not a permit for a surface tank, pit, or pond. |
| Spill Prevention, Control, and Countermeasure (SPCC) | The facility stores qualifying oil and could reasonably discharge to navigable waters or adjoining shorelines. | A facility-specific spill-prevention plan and related controls. | It does not replace a discharge, waste, or storage permit. |
| State, tribal, and local programs | Always screen these programs; requirements vary substantially. | Oil-and-gas, groundwater, waste, water-resource, construction, fire, and land-use controls. | No national table can supply the applicable state thresholds or application steps. |
Federal rules provide a framework, not a facility-specific permit determination. The responsible state or tribal agency and the applicable EPA region should confirm the final list.
#1 Best Overall
- Read Before You Buy — No Video Output: These adapters support charging and USB 2.0 data transfer, but cannot transmit video signals. Except for standard USB webcams (which use USB data only), they are not compatible with HDMI/DisplayPort cables, video-capable USB-C hubs, or docking stations with video output.
- Convert USB-A Ports to USB-C: Designed to connect USB-C earphones, cables, flash drives, card readers, and other USB-C accessories to standard USB-A ports. Plug-and-play with no drivers or software required.
- Aluminum Alloy Housing: Built with a sturdy aluminum alloy shell that aids in heat dissipation and protects against daily wear and scratches. Designed to maintain a stable and secure connection.
- Compact & Travel-Friendly: The ultra-compact design allows the adapter to stay plugged into your device without blocking adjacent ports or adding bulk, reducing wear and tear on your original USB ports.
- 12-Month Warranty: Backed by a 12-month manufacturer warranty for peace of mind. Designed to meet strict quality control standards for reliable everyday performance.
Start with six facts regulators will ask for
- Jurisdiction: Record the state, county or municipality, tribal status, and whether the site is in Indian Country. EPA and state authority can differ by location.
- Connection to E&P: Explain whether the water comes directly from oil-and-gas exploration, development, production, or an associated recycling operation. Storage for another industrial or commercial use may follow a different rule set.
- Container type: Identify aboveground or underground tanks, lined containments, closed vessels, or open impoundments. Include liners, secondary containment, leak detection, freeboard, and inspection features if already designed.
- Quantity and duration: State maximum and average volume, turnover rate, and how long water may remain onsite. National sources do not establish one universal storage threshold.
- Fluid characterization: Describe salinity, hydrocarbons, additives, naturally occurring constituents, and any co-stored material. Unrelated wastes can change the regulatory analysis.
- Destination: Specify whether the water will be reused in production, treated for another use, discharged to surface water, hauled away, or injected underground.
These facts should appear in the permit strategy, engineering package, spill plan, and operating procedures. A change in destination or a change from a closed tank to an open impoundment can create a new approval requirement.
RCRA: what the oil-and-gas exclusion does and does not do
The narrow Subtitle C exclusion
Federal regulation 40 CFR 261.4(b)(5) excludes produced waters and other wastes associated with oil-and-gas exploration, development, or production from RCRA Subtitle C hazardous-waste regulation. EPA identifies produced waters, drilling fluids, and related E&P wastes as examples covered by this provision.
The exclusion is tied to the waste’s origin and association with E&P. It is not a blanket exemption for everything found at an oilfield. Spent solvents, discarded chemicals, laboratory waste, and other unrelated materials do not become excluded merely because they are stored at the same facility.
The Tool Desk
Outbyte PC Repair FREERepair Windows errors before they cause bigger problemsFix Now →Outbyte Driver Updater FREEFix the driver behind crashes, sound loss and screen glitchesFind Drivers →Subtitle D and state controls still matter
EPA explains that many E&P wastes are outside Subtitle C but generally remain subject to RCRA Subtitle D and applicable state requirements. A tank or pit may therefore need state approval, operating conditions, inspection, closure, groundwater protection, or financial-assurance measures even when a federal hazardous-waste permit is not required for the produced water itself.
Do not describe produced water as “exempt from RCRA” without identifying the precise Subtitle C exclusion and its E&P limitation. Confirm whether any mixed or unrelated waste causes the exclusion to fail, and keep separate streams segregated when required by state rules.
Rank #2
- 5-in-1 USB-C Hub: Experience comprehensive connectivity featuring a Power Delivery input, two USB-A 2.0 ports, a USB-A 3.0 port, and an HDMI port. (Note: The USB-C power delivery input port is only for connecting an external wall charger to power your laptop and cannot power peripheral devices.)
- 90W Pass-Through Charging: Achieve optimal charging with 90W pass-through power to your laptop, supported by a total input of 100W, with the hub reserving 10W for operational efficiency. (Note: Wall charger not included.)
- Quick Data Transfers: Accelerate your productivity with rapid data transfers using a high-speed 5Gbps USB 3.0 port and two 480Mbps USB 2.0 ports.
- 4K HDMI Display: Enhance your visual experience with a hub capable of delivering 4K resolution at 30Hz in both mirror and extend modes. Please note that this hub is compatible with MacBook (macOS 12 and newer), Windows 10 and 11, ChromeOS, and laptops equipped with DP Alt Mode and Power Delivery. Note: This device is not compatible with Linux.
- What You Get: Anker USB-C Hub (5-in-1, 4K HDMI), welcome guide, 18-month warranty, and our friendly customer service.
Surface-water discharge and stormwater are separate screens
When an NPDES permit may be required
Discharging produced water to a water of the United States is different from storing it. A point-source discharge generally requires authorization under Clean Water Act section 402, commonly through the National Pollutant Discharge Elimination System (NPDES). The permitting authority may be EPA or a state with delegated authority, depending on the location and the scope of that delegation.
Texas illustrates why location matters. EPA states that the Texas Commission on Environmental Quality received partial authority on January 15, 2021, for specified produced-water and related oil-and-gas discharges. EPA retains permitting authority and primary enforcement responsibility for facilities discharging in Indian Country, while maintaining oversight elsewhere. This is a bounded example, not a national rule.
Quick wins for a faster PC:
Repair Windows errors before they cause bigger problemsFix Now →Fix the driver behind crashes, sound loss and screen glitchesFind Drivers →A storage permit, if required, does not silently authorize an overflow, bypass, truck discharge, or pipe to a creek. Map every intentional and accidental discharge pathway and ask the permitting authority which application and monitoring requirements apply.
Stormwater exemption limits
EPA describes a limited oil-and-gas stormwater exception for runoff composed entirely of precipitation conveyances and not contaminated by contact with materials or wastes at the site. Runoff that contacts produced water, tanks, loading areas, waste, or contaminated soil may fall outside that exception. Construction or industrial stormwater coverage can then be required.
Design drainage so clean rainwater is separated from process areas where feasible. Document inspections, diversion structures, sampling points, and corrective actions required by the applicable permit or state program.
Rank #3
- Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
- Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
- Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
- Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
- What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.
Underground injection: a different permit pathway
If the operating plan sends produced water to a disposal or enhanced-recovery well, use the UIC pathway rather than treating an injection approval as a storage permit. EPA identifies Class II wells as wells used for fluids associated with oil and natural-gas production; produced brines are a principal fluid.
A Class II permit addresses the well, injection zone, mechanical integrity, monitoring, and related safeguards. It does not authorize a surface pond or tank while water waits for transport. Surface storage may require separate state or local approvals and spill controls.
If injection would require an aquifer exemption, that is a separate UIC decision. EPA states that injection begins only after the exemption is approved and a UIC permit is granted. Keep the exemption, well permit, transportation arrangements, and interim-storage approvals on separate schedules.
SPCC and release prevention
Screen the facility for the federal SPCC rule whenever it stores qualifying oil and there is a reasonable expectation of discharge to navigable waters or adjoining shorelines. Applicability is facility-specific and turns on the substances stored, total capacity, and site conditions.
Do not assume that every produced-water tank is covered, and do not assume that labeling a tank “produced water” creates an automatic exemption. Have the actual inventory and discharge pathways reviewed under the SPCC rule. Where the rule applies, the plan should address inspections, containment, drainage controls, response procedures, and professional certification or other requirements specified by the rule.
Rank #4
- Dual Converters, Infinite Potential:Includes 2× USB C male to USB A female adapters and 2× USB A male to USB C female adapters. Perfect for a wide range of uses—tablets with Bluetooth keyboards, expand USB ports on macbook, and more. Two different converters for all your daily needs
- Next-Level 10Gbps & 3A Charging: No more slow 480Mbps, this usb to usb c adapter has a transfer speed of up to 10Gbps, allowing you to do more transferring in less time. This usb adapter fits both USB A and USB C charger, supporting up to 3A fast charging
- Upgraded Exquisite Craftsmanship: With an aluminum alloy housing and metal connector, the usbc to usb adapter is extremely durable and sturdy. Rigorously tested to withstand more than 10,000 times of plugging and unplugging, ensuring long-lasting performance
- Broad Compatible: The usb c to usb adapter widely supports all USB C/ USB A devices like laptops, tablets, cellphones, car chargers, and phone chargers. Such as compatible with MacBook Pro/Air 2023/2022, Thunderbolt 4/3 Devices,Apple MagSafe Watch 9/8/7/SE/Ultra, iPad Pro 2022/2021, Samsung Galaxy S23/S20/S10, and iPhone 17/16/15 Pro. Plug and play
- Please Note: To reach 10Gbps speed, keep the cable under 3.3 ft. For USB A Male to USB C adapters, try flipping the USB C connector. USB C Male to USB A adapters support bidirectional 10Gbps transfer within 3.3 ft
State, tribal, and local requirements can decide the outcome
New Mexico as an illustration, not a national template
EPA’s November 9, 2018 draft white paper illustrates how one state can divide requirements by use. It describes New Mexico Oil Conservation Division requirements for qualifying oil-and-gas recycling containments. The same paper says an impoundment storing produced water outside oil-and-gas production may require a New Mexico Environment Department groundwater-discharge permit, along with possible water-resource approvals.
That document is a dated draft. Verify current New Mexico statutes, rules, forms, and agency interpretations before relying on its particulars. The example demonstrates the key point: the same-looking pond can follow a different permit path when the operator, purpose, or water source changes.
Other state and local screens
Depending on location, review oil-and-gas conservation rules, solid-waste permits, groundwater-discharge permits, water-rights or water-resource approvals, construction permits, dam or impoundment requirements, fire codes, floodplain rules, and local land-use conditions. Tribal environmental programs may impose requirements in addition to, or instead of, a state program.
Ask the agency whether a permit is required before construction, before receiving the first barrel, or only when the facility changes capacity or use. Obtain written confirmation when an agency determines that no permit is needed.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
Comparing tanks, lined containments, and impoundments
| Storage form | Questions that affect permitting | Controls to verify | National rule? |
|---|---|---|---|
| Aboveground tank or closed vessel | Is it within E&P operations? What is the inventory, secondary containment, and connection to loading or transfer lines? | Overfill prevention, inspection, secondary containment, leak response, and stormwater segregation. | Numeric thresholds and design standards are not stated nationally; check the governing state and permit. |
| Lined containment or recycling cell | Is it an oil-and-gas recycling facility, and does the liner system protect groundwater under the state rule? | Liner specifications, leak detection, freeboard, sampling, inspection, closure, and emergency procedures. | Requirements vary by jurisdiction; no universal liner specification is established here. |
| Open impoundment or pond | Is the water stored for E&P, another industrial use, or later discharge? Could precipitation contact the water? | Groundwater protection, seepage control, freeboard, wildlife and public safety measures, runoff management, and closure. | Permit type and thresholds are state-specific and not stated nationally. |
Choose the design only after the agency confirms the applicable category. A lower-cost container can create a more complex groundwater, stormwater, or closure analysis than a closed system.
Best Value
- 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
- Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
- Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
- HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
- What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.
A practical permit-determination workflow
- Draw the site map. Mark tanks, pits, transfer points, drains, wells, wetlands, streams, property boundaries, and stormwater flow.
- Prepare a water and waste inventory. List each stream, source, expected constituents, maximum volume, and whether any unrelated waste is mixed or co-stored.
- Classify the operation. State whether it is E&P, recycling, treatment, commercial storage, or another use, and identify the operator responsible for each step.
- Check the federal pathways. Evaluate the 40 CFR 261.4(b)(5) exclusion, section 402/NPDES discharge questions, UIC requirements for injection, stormwater coverage, and SPCC applicability.
- Contact the state or tribal agencies. Provide the map, design drawings, inventory, destination, and schedule. Ask for the exact program, application, trigger, and preconstruction conditions.
- Screen local approvals. Confirm zoning, building, fire, floodplain, road-access, and emergency-response requirements where applicable.
- Build operating controls. Write inspection frequencies, transfer procedures, sampling, leak response, rain-event actions, recordkeeping, and closure steps into the operating plan.
- Recheck after changes. Reevaluate permits if volume, liner, storage duration, fluid composition, operator, or final destination changes.
Documents to assemble before applying
- Site ownership, jurisdiction, tribal-status, and facility-contact information.
- Scaled site plan showing containment, drainage, nearby waters, groundwater features, and access for emergency vehicles.
- Engineering drawings for tanks, liners, berms, leak detection, overflow protection, and closure.
- Maximum and average storage volumes, turnover estimates, and expected storage duration.
- Fluid characterization and a segregation plan for unrelated wastes.
- Transfer, inspection, sampling, spill-response, stormwater, and maintenance procedures.
- Final-disposition contracts or plans for reuse, treatment, discharge, hauling, or injection.
- Agency correspondence and written determinations, including any statement that a permit is not required.
Common mistakes and how to correct them
“The RCRA exclusion means no permit is needed.”
Correction: Identify the narrow Subtitle C exclusion, then separately evaluate Subtitle D, state waste rules, groundwater protection, and containment requirements.
“A UIC permit covers the waiting tank.”
Correction: Treat the well authorization and surface-storage approval as separate actions with separate operating conditions.
“Any rainwater exemption covers the site.”
Correction: Determine whether runoff contacts produced water, waste, equipment residue, or contaminated soil. If it does, obtain the stormwater coverage or other authorization required by the regulator.
“A state example applies everywhere.”
Correction: Use New Mexico and Texas examples only to illustrate how programs differ. Confirm the current rule in the actual state or tribal jurisdiction.
“A tank label settles SPCC status.”
Correction: Evaluate the stored substances, capacity, and reasonable discharge expectation for the actual facility.
Questions to put to the regulator
- Which agency has jurisdiction over this location and activity?
- Is the storage considered E&P-related, recycling, commercial storage, or another category?
- Does the proposed tank, lined containment, or impoundment require a construction or operating permit?
- Are groundwater-discharge, water-resource, liner, leak-detection, closure, or financial-assurance requirements triggered?
- Would any planned discharge, truck transfer, bypass, or runoff require NPDES or stormwater authorization?
- Does the facility meet SPCC applicability criteria, and who must certify the plan?
- What approvals are needed before construction, first fill, expansion, or a change in final disposition?
The defensible permit list is the one tied to the actual site, design, fluid, and destination. Treat the federal exclusions and permits as separate screens, then obtain current written direction from the responsible state, tribal, or federal authority before construction or operation.
Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.