Driver FixRecommendedSound, Wi-Fi or graphics acting up? Check drivers firstFind missing or outdated drivers fast.Check DriversHalloween DealsAmazon USHalloween week deals: useful picks before month-endAmazon US: current deals, useful picks and tech finds.Check DealsClean PCRecommendedOne scan can reveal what keeps slowing WindowsLook for cleanup and repair opportunities.Run Scan×
FREEDOM251

Freedom251 › Blog › data centers

Plans for data center in Moncalieri, Italy, put on hold by town mayor

By Freedom251 Team · · 4 min read

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Moncalieri mayor Lorenzo Mauro has put the proposed data-center campus at the former ILTE industrial site on hold. The plan is not an approved or operating facility: after a 6 October services conference raised unanswered questions about electricity, water, cooling, land remediation and public infrastructure, Mauro said the project is “not acceptable as presented” and called for further technical review and public discussion.

What the mayor’s decision means

The municipality has not issued a final approval for the campus. A negotiated executive plan application was filed on 29 July 2026 for Via Fortunato Postiglione 14 in the Vadò area, according to Moncalieri’s transparency record. The pause means the proposal must be clarified and discussed before the town takes a decisive administrative step.

As an Amazon Associate I earn from qualifying purchases.

On 8 October, Mauro said in Italian, “Al momento questo progetto non è accoglibile, ci sono troppe cose che vanno ancora valutate, tra cui l’approvvigionamento energetico e soprattutto vogliamo coinvolgere la cittadinanza.” In English, he said the project could not currently be accepted because too many matters—including energy supply—still needed assessment and residents had to be involved. On 13 October he repeated: “Il risultato è chiaro: il progetto, così come presentato, non è accoglibile” (“The result is clear: the project, as presented, is not acceptable”).

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What is proposed at the former ILTE site

Reporting by the Piemonte Regional Council and Rai TGR Piemonte describes a large campus rather than a single server building. The figures below describe the submitted concept; they are not an approved final build-out.

#1 Best Overall
Sale
TOZO A1 Wireless Earbuds Bluetooth 5.3 Light Weight in Ear Headphones | IPX5 Waterproof,2 Mics for AI Calls,Immersive Premium Sound Bass Headset with Charging Case,32 EQ via App Black
  • [Ultra-Lightweight Ear Buds Designed for Small Ears] Each earbud weighs only 3.7g and features a compact, ergonomic in-ear design made especially for small ears. Secure, low-profile, and comfortable for workouts, all-day wear or overnight sleeping.The ultra-slim profile sits flush in your ear with no hard edges poking or rubbing, so you can even sleep on your side without discomfort.
  • [Immersive Stereo Sound with TOZO OrigX Technology] TOZO OrigX tuning delivers clear vocals, balanced mids, and natural stereo sound for music, podcasts, and videos.
  • [Long Battery Life for Daily Use] Get up to 7 hours of playtime on a single charge, with up to 32 hours total using the charging case—ideal for workdays, commuting, and extended listening sessions.
  • [Bluetooth 5.3 & Stable Connection] Bluetooth 5.3 provides fast pairing, stable wireless performance, and reduced dropouts as you move around home or office.
  • [Deep Bass with Clear Vocals] High-performance drivers produce punchy bass while keeping vocals clean and detailed for everyday listening.
Item Proposal as presented
Location Former ILTE industrial area in Vadò, Via Fortunato Postiglione 14, Moncalieri
Applicant identified in reporting Private company Moncalieri Logistics
Buildings Four data-center buildings
Site area Approximately 270,000 square metres
Gross floor area 173,500 square metres
Electrical capacity Up to 576 megawatts
Planned workforce 320 workers
Proposed public works and land transfer About €4.1 million in works and nearly 40,000 square metres transferred to the municipality

The 576 MW figure indicates the maximum electrical capacity described for the concept, not a confirmed grid connection or a guaranteed level of consumption. No binding utility contract, construction timetable or independently published final investment figure has been established.

Why the proposal was paused

Electricity supply is unresolved

Mauro specifically listed electricity procurement as an open issue. A campus of the proposed scale would require a documented energy-supply and grid-connection plan, but the public statements do not establish that such arrangements have been secured. The mayor has therefore treated power availability as a matter requiring evidence before approval.

Rank #2
Sale
Smart Watch for Men Women Compatible with iPhone Samsung Android Phone 1.69 inch Full Touch Screen IP68 Waterproof Bluetooh Fitness Tracker Heart Rate/Sleep Monitor (Black)
  • 【IP68 Waterproof Multifunctinal Smart Watch】Torjalph fitness activity tracker smart watch is IP68 waterproof technology ,you can wear it when swimming,handwashing,it's rain-proof which means that you perform multiple exercise modes outside without worrying about sweat or rain corroding your fitness smart watch,and this watch equipped with a 230 mAh large capacity battery magnetic charging ,and this sports activity tracker watch can be used 5-7 days If fully charged.
  • 【Larger 1.83'' Full Screen Watch & Multi-dial Selection】1.83 inch full HD color touch screen smart watch for men / women provides excellent 240*284 resolution image quality ,This Bluetooth smart watch offers a better touch experience and remarkable immersion and ,more than 200 watch faces for you to choose from App"Da Fit ", you can change the dial style according to your mood to wear keeping the world on your wrist
  • 【Accurate Activity Tracker Smart Watch 】sports watch activity tracker uses sweat and dust resistant breathable silicone strap, our Fitness Tracker Smart Watch for Android iOS Phones supports 12 sports modes,walking,running,bicycle,swimming,badminton,basketball,football,rope skipping. This bluetooth calls smart watch for men women is lightweight and stylish, bringing more convenient and relaxing sports experience while also providing more protection.
  • 【Your 24 Hour Personal Daily Health Monitor】Fitness watch for women men full touch screen IP67 waterproof bluetooth smartwatch for Android iOS Phones with heart rate blood pressure monitor multifunction Andriod smart watch with steps counter sleep monitor sports fitness watch, monitoring blood oxygen saturation allows you to understand your physical condition in real time to track fitness progress ,to know your health status in time.
  • 【More Functions Bluetooth Call Smart Watch】This fitness activity smart watch full screen for iPhone and Android phones includes a bunch of new features including:The bluetooth smart watch can hang up the phone, receive and display WhatsAPP /Text /Facebook /Twitter /Messenger reminder.Support sedentary reminder, alarm clock, stopwatch, timer,weather information,music control, remote camera control compatible with Android 5.0 and above or iOS 9.0 and above smartphones.

Water, cooling and discharge plans are incomplete

The 6 October conference identified unclear water demand, unspecified cooling systems and unanswered questions about how water or other discharges would be managed. That means the public record does not yet provide a reliable water-use figure for the campus. Cooling technology matters because it affects water withdrawals, wastewater, energy efficiency and heat output; none of those choices had been specified sufficiently for the municipality.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Land remediation and hydraulic safety need more work

The area proposed for public green space requires remediation. Officials also left open questions about hydraulic safety, the amount of impermeable surface and the urbanisation works needed to support the development. These issues can affect flood risk, drainage design, construction obligations and the condition of land ultimately handed to the town.

Rank #3
New Bee Guitar Cable 10ft Electric Instrument Bass AMP Cord | 6.35mm Jack, Durable Design, Stage and Home Studio Use, Low Noise Shielded Electric Cord for Bass, Keyboard, Amp, Mixer
  • [Low Noise High Fidelity] New bee guitar cord with 22AWG oxygen-free-copper center conductors provides enhanced signal transfer, the PVC insulation material and the high-density stranded copper double shield provide noise rejection for quiet operation
  • [Ideal for Choice] New bee 1/4 straight and right angle metal connectors, ensures a secure connection in any instrument, pedal, or amp jack. L shape great fro on stage guitar stands
  • [Wide Compatible] Suitable for mixer, power amplifier, microphone, effector, decoder, equalizer, electoronic organ, electric guitar, electric bass and other electronic equipments. Widely used in the installation of smart home, karaoke speaker, professional stage audio, etc
  • [Easy Disassemble] Making incidental repairs quick and easy! Very nice, flexible cable
  • [Dont Hesite to Order] 24 hours customer services and professional technology team are standing by

Municipal costs and transferred land are contested

The property owner proposed roughly €4.1 million of works and a transfer of almost 40,000 square metres to Moncalieri. Municipal offices expressed reservations about accepting future maintenance responsibilities for that land and infrastructure. The proposal therefore raises a public-finance question in addition to its private construction costs: what the municipality would have to maintain, and at what long-term expense.

Noise, heat, emergency power and jobs lack guarantees

Mauro also named noise, heat recovery, emergency generators and employment guarantees as unresolved. Data centers commonly require backup generation and continuous cooling, so the project needs a clear plan for generator operation, acoustic impacts and whether waste heat can be recovered. The stated workforce is a planning figure, not a binding commitment to a guaranteed number of permanent jobs.

Rank #4
BSIMB 15.6" Digital Family Calendar & Chore Chart, No Subscription Fees
  • Digital Family Calendar: BSIMB digital calendar wall touch screen puts an end to your chaotic life. Designed for busy families, the digital calendar keeps you organised and in step with your family. Assign different colours and tasks to each family member to make family scheduling easier and more intuitive.
  • Easy Setup and Auto-Sync: Plug in, connect to WLAN and auto-syn your electric calendar in minutes. Digital wall calendar compatible with Google calendar, iCloud calendar, Outlook calendar, Cozi calendar and Yahoo calendar. Add events directly on the device or through the ecalendar app. Electronic calendar stays current whether you're at work or traveling—no manual updates needed.
  • All-In-One Home Assistant: Smart calendar builds habits and encourage independence with personalised chores. Display daily meal plan to reduce the daily ‘What's for dinner?’ stress. To-do lists keep track of everything you want. Turning chores into valuable achievements with stars and rewards, making life easier and more enjoyable.
  • Manage Anytime Anywhere: BSIMB electronic calendar for family stay connected with the powerful ecalendar app. Access and manage your digital wall calendar anytime, anywhere with free features like stars & rewards, photo screensaver, chore charts, meals plans, to-do lists etc. Electronic planner paid features like Magic Import tailor advanced tools for users with special needs.
  • Stay in Touch with Loved Ones: Share photos or videos from your phone to electronic wall calendar with app, instantly update your life moment, and keep in touch with your family, especially those who are far away; you can also surprise your smart calendar digital wall by sending him a wish card; it's also great for keeping tech-illiterate elders in touch with the youngsters.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Where the approval process stands

The latest conference findings had not yet been formally recorded when Mauro announced the pause, according to reporting by Open. That procedural detail does not amount to approval or rejection; it means the technical record was still being completed while the mayor publicly signalled that the submitted version could not proceed unchanged.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Mauro has called for a new discussion with the property owner and for residents to be involved. A revised proposal would need to answer the energy, water, cooling, discharge, remediation, drainage, noise, heat-reuse, emergency-generation and employment questions, as well as clarify the municipality’s infrastructure and maintenance obligations.

Is the project’s cost known?

No independently published final investment figure has been established. Open used a €5 billion description in a headline for the maxi-project, but the cited material does not verify that amount as an approved or independently confirmed project cost. It should therefore not be treated as the project’s settled budget.

How Piemonte’s wider policy debate affects Moncalieri

On 22 September, the Piemonte Regional Council reported that the regional government was consulting stakeholders while preparing legislation to regulate digital infrastructure. Councillor Valentina Cera cited the Moncalieri proposal as an example of why municipalities need a clear, uniform and preventive framework for large data-center developments.

That regional work does not decide Moncalieri’s application. It does, however, place the local review in a broader debate over grid capacity, water and land use, environmental safeguards, public benefits and how early communities should be consulted.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

What is still undecided

  • Whether the municipality will accept a revised version of the negotiated executive plan.
  • The final electrical connection, procurement arrangements and operating demand.
  • The campus’s water requirement, cooling technology and discharge controls.
  • The remediation method and the treatment of drainage, impermeable surfaces and hydraulic risk.
  • Noise limits, emergency-generator operation and any heat-recovery system.
  • Binding employment guarantees and the division of infrastructure and maintenance costs.
  • A verified final investment total, construction schedule and start date.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

data centersdata-center policyinfrastructureItalylocal governmentMoncalieriPiemonte

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Windows Errors? Fix Them Before They SpreadFree repair scan
Outdated Drivers Are Slowing You DownFree scan - exact matches

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.