Halloween DealsAmazon USHalloween week deals: useful picks before month-endAmazon US: current deals, useful picks and tech finds.Check DealsWindows FixRecommendedWindows errors stealing your time? Find the fix fastScan stability, cleanup and performance issues.Fix NowHalloween DealsAmazon USOctober picks are moving - compare before checkoutAmazon US: current deals, useful picks and tech finds.See Picks×
FREEDOM251

Freedom251 › Blog › erosion control

How to Reduce Stormwater Runoff and Soil Erosion at a Solar Farm

By Freedom251 Team · · 11 min read

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The most reliable way to control runoff at a solar farm is to keep soil covered and permeable, avoid creating concentrated flow paths, and design drainage for water shed by panels, roads, pads, and upslope land. Preserve vegetation and natural drainage where possible, limit grading and compaction, stabilize disturbed ground quickly, and use site-specific swales, infiltration areas, treatment practices, and safe conveyance. Temporary construction controls and permanent operating measures are both necessary.

Panel rows do not create runoff uniformly. Water runs to each panel’s lower edge, where repeated discharge can scour soil. Roads, inverter pads, trenches, and compacted or gravel-covered areas add other runoff sources. The measures below provide a design and management framework; final sizing and permit compliance require a qualified stormwater or civil engineer familiar with the project’s soil, slope, climate, jurisdiction, and array layout.

As an Amazon Associate I earn from qualifying purchases.

Why solar farms develop runoff and erosion problems

Rain that lands on a photovoltaic module flows across its surface and leaves at the drip edge. Instead of arriving as diffuse rainfall, water can be delivered repeatedly along narrow lines. On sloping ground, those lines may merge into rills or gullies, removing topsoil and carrying sediment toward wetlands, streams, neighboring land, roads, or equipment.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The Minnesota Pollution Control Agency (MPCA) solar-farm guidance identifies dripline scour as a potential water-quality impact. It also notes that access roads and inverter pads generate runoff. The U.S. Department of Energy explains that removing topsoil, compacting soil, or replacing vegetation with gravel or other ground treatments can reduce infiltration; downhill flows can then undermine foundation piles and equipment pads. Its flood-resilience discussion is aimed at smaller on-site photovoltaic systems, so utility-scale developers should treat it as general resilience guidance rather than a complete design standard.

#1 Best Overall
Jute Erosion Control, Soil Saver Mesh Blanket - 48" Wide x 20 Yards (60 feet Long) - 240 Sq. Ft. Coverage
  • Premium Jute Construction: Our Soil Saver Erosion Control Fabric is made from premium-quality jute, a natural and biodegradable material renowned for its superior erosion control capabilities. Crafted with meticulous attention to detail, this 48-inch wide and 20-yard long fabric ensures a sturdy, reliable solution for preventing soil erosion.
  • Extensive Coverage for Soil Protection: With a length of 20 yards, this roll of fabric covers an approximate area of 240 square feet, delivering extensive coverage for your landscape. It acts as a shield, safeguarding soil from erosion, reducing sedimentation, and mitigating the adverse impact of wind and water, ensuring the integrity of your landscape and garden areas.
  • Environmentally Sustainable Solution: Harness the power of nature with our eco-friendly jute erosion control fabric. As a natural and biodegradable material, it promotes environmental sustainability by seamlessly integrating with the soil, enriching its quality, and eventually decomposing without leaving harmful residues.
  • Versatile and Adaptable Design: The 48-inch width provides a versatile solution that can be easily tailored to your landscaping needs. Whether you're covering embankments, stabilizing slopes, or nurturing garden beds, the easy-to-cut design allows for seamless customization, adapting effortlessly to various terrains and shapes.
  • User-Friendly Installation: Engineered for hassle-free installation, this erosion control fabric is user-friendly and straightforward to set up. Its manageable weight and pliability make it easy to handle and lay down, allowing for a quick and efficient application, reducing installation time and effort.

Runoff risk is therefore a combination of panel geometry and site preparation. A project can have modest rainfall yet experience severe erosion if water is concentrated, soil is bare, or a compacted construction route directs flow. Conversely, dense vegetation and well-distributed drainage can absorb and slow much of the same rainfall.

Start with a site and drainage assessment

Map how water currently moves before deciding where to grade, place roads, or install controls. The assessment should cover the entire contributing area, not only the fenced array.

Document existing conditions

  • Survey slopes, ridges, depressions, swales, wetlands, streams, culverts, flood-prone areas, and drainage outlets.
  • Characterize soil texture, infiltration rate, erodibility, seasonal groundwater, bedrock, and the depth of any restrictive layer.
  • Record existing vegetation, compacted areas, farm tracks, drainage tiles, and locations where runoff already ponds or erodes.
  • Trace upslope drainage that may enter the site, and identify downstream property, waterways, and infrastructure that could receive sediment.
  • Overlay panel rows, drip edges, access roads, inverter pads, collection trenches, laydown areas, and construction entrances on the drainage map.

Use local flood history and current mapping, but do not assume that land outside a mapped floodplain cannot flood. The DOE notes that intense stormwater can inundate sites beyond mapped flood boundaries. Include wet-soil and scour exposure in the structural and electrical design review.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Compare design constraints before selecting a practice

No single treatment is best for every solar farm. MPCA specifically identifies maintenance and operating cost, available land, and geographic and topographic setting as planning variables. Compare alternatives using the following questions:

Decision factor Questions to answer
Infiltration and groundwater Can the soil accept the design volume without creating prolonged saturation, and will seasonal groundwater limit infiltration?
Slope and flow paths Where will sheet flow concentrate, and can a feature safely intercept or spread it?
Space and row layout Is there enough room between rows and at the perimeter for vegetation, swales, maintenance access, and treatment areas?
Permit treatment What runoff volume, sediment, or pollutant reduction must be demonstrated, and what practices receive credit?
Construction and maintenance Can crews build, inspect, mow, remove sediment, and repair the feature without damaging modules or electrical infrastructure?
Ecological fit Will the seed mix and maintenance schedule work with local climate, soils, shade, wildlife, and neighboring land uses?
Asset resilience Are piles, pads, inverters, transformers, cables, and access roads protected from scour, ponding, and floodwater?

Control erosion during construction

Construction is when the largest area of soil may be exposed at once. Temporary erosion and sediment controls keep sediment on the site while permanent drainage and vegetation are being established. They do not replace the permanent design.

Preserve soil and drainage wherever the approved layout allows

  • Keep existing vegetation and natural drainage paths unless clearing is necessary for an approved facility or safety requirement.
  • Minimize clearing, grading, trench width, and unnecessary excavation. Use existing access routes where they can meet safety and bearing requirements.
  • Restrict heavy-equipment traffic, especially on wet soil. Where compaction occurs, restore soil structure using the methods allowed by the project specifications and site conditions.
  • Separate and protect fertile topsoil so it can be redistributed during restoration instead of being buried or mixed with subsoil.
  • Keep stockpiles away from channels and protect them from rainfall and wind.

Phase the work

Open only as much ground as crews can stabilize promptly. Sequence clearing, grading, trenching, foundation work, and revegetation in manageable areas. A phased schedule reduces the length of time that exposed soil can generate sediment and makes inspections and repairs practical.

Rank #2
Farm Plastic Supply - Erosion Control Blanket - Straw Garden and Landscape Cover, Erosion Control Blanket, Straw Blanket, Erosion Control, Mulch, Slope Stabilizer, and Seed Protector (8' x 112.5')
  • Soil Erosion: Prevents soil erosion from rainfall impact and stormwater sheet flow. Our Erosion Control Blankets retain moisture in the soil to enhance seed germination and vegetation growth which will lead to better growing seasons and less Erosion. The Dimensions of this product depending on shipping are 7.5' x 112.5'.
  • Moisture Retainment: Our Erosion Control Blankets retain moisture in the soil to enhance seed germination and vegetation growth which will lead to better growing seasons.
  • Strong Material: This product is composed of agricultural wheat that is mechanically stitch-bonded and can withstand all of the elements that it may face and will last a long time.
  • Germination: Erosion Control Blankets also aid in the germination of newly planted seeds by shielding seeds from erosion and weather which makes it easier for them to grow.
  • Versatile: Erosion Control Blankets are very versatile as they are widely used on riverbeds, hills, culvert inlets and outfalls, and channel and ditch linings.

Under the Minnesota construction permit guidance described by MPCA, exposed soil that will not be worked for 14 days must receive temporary stabilization. That 14-day trigger is specific to the Minnesota permit framework; other jurisdictions may use different deadlines or requirements. Confirm the current permit language before putting a number in a contract or inspection plan.

What’s actually slowing this PC down?

Pick the symptom - the matching free tool is one click away.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Install and maintain temporary BMPs

The U.S. Environmental Protection Agency’s National Menu of Best Management Practices for Stormwater-Construction includes examples such as permanent seeding, mulch, geotextiles and matting, temporary slope drains, check dams, grass-lined channels, silt fences, sediment traps, and inspection and maintenance procedures. Select controls for the actual slope, flow, soil, and construction sequence rather than installing them as a generic package.

  • Use perimeter controls and stabilized construction entrances to keep sediment from leaving the site.
  • Intercept clean upslope water and route it around disturbed areas when feasible.
  • Use temporary slope drains or lined channels where concentrated flow cannot be avoided.
  • Place check dams only where they are designed for the channel and expected flow; poorly anchored dams can fail and become additional debris.
  • Use silt fences, wattles, sediment traps, or basins where the approved plan calls for them, and maintain the storage capacity they require.
  • Apply mulch, seed, erosion-control matting, or another specified cover immediately after final grading or when a work area is left idle.

Inspect after significant rain and at the intervals required by the permit. Repair undercut controls, remove accumulated sediment where the plan requires it, and document corrective actions. Sediment-laden water should remain on site to the extent required by the approved plan and local rules.

Establish permanent vegetative cover

Vegetation beneath and between panel rows is a functioning stormwater control, not merely landscaping. Leaves and stems intercept rainfall, roughen the surface so water moves more slowly, and roots reinforce soil while improving infiltration. A continuous cover also reduces the exposed soil available for dripline scour.

Set a measurable cover target

MPCA recommends 90 percent or better uniform vegetation coverage for areas counted as pervious in its solar guidance. That figure is an agency recommendation for its permit approach, not a universal code requirement. Define how coverage will be measured, when it must be achieved, and what happens if establishment fails in the project’s permit and operations plan.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

The same Minnesota guidance treats gravel as impervious for its permit approach. Do not count a gravel blanket beneath or between rows as pervious cover without confirming that the governing authority allows it. Gravel can also create concentrated pathways if it is placed on compacted soil or shaped toward an outlet.

Rank #3
Farm Plastic Supply 100% Biodegradable Erosion Control Blanket - Straw/Coconut Straw Garden and Landscape Cover, Straw Blanket, Erosion Control (8' x 112.5')
  • 100% Biodegradable - The Material and Netting in this Blanket is 100% Biodegradable. Both the agricultural Wheat Straw and Coconut Fibers are 100% Biodegradable and they are held together by a Biodegradable Brown Poly Net that will biodegrade after 90 days. This product comes as a 7.5' Width for shipping purposes.
  • 70% Straw - Our 100% Biodegradable Straw/Coconut Erosion Control Blankets are a temporary rolled erosion control product composed of 70% agricultural wheat straw.
  • 30% Coconut Fiber - Our 100% Biodegradable Straw/Coconut Erosion Control Blankets are a temporary rolled erosion control product composed of 30% organic coconut fiber.
  • Germination: Our Erosion Control Blankets also aid in the germination of newly planted seeds by shielding seeds from erosion and harsh weather which makes it easier for them to grow.
  • Versatile: Erosion Control Blankets are very versatile as they are widely used on riverbeds, hills, culvert inlets and outfalls, and channel and ditch linings. They are great for construction projects as well as they are a contractors dream.

Choose seed and maintenance for the site

  • Use locally appropriate perennial species selected for soil, climate, shade from modules, drought, winter conditions, and mowing or grazing requirements.
  • Native or pollinator-friendly mixes can be suitable where they match the site and the approved management plan; they are options, not universal requirements.
  • Prepare the seedbed without undoing erosion-control grading or compacting the root zone.
  • Specify seeding windows, mulch, watering, weed control, mowing height, and reseeding triggers.
  • Keep equipment traffic on designated routes so maintenance does not create new bare strips.

DOE reports that PV-SMaRT research found stormwater reduction of “as much as 38%” with deep-rooted pollinator and native plantings. That figure is attributed to the research through the DOE page, but the available material does not establish its methods or general applicability to every climate, soil, or array. Treat it as a reported research result, not a guaranteed project performance value.

MPCA recommends a lowest vertical array clearance no greater than 10 feet to prevent or control dripline erosion and scour in its context. This is Minnesota agency guidance, not a universal engineering limit. Array height, row spacing, tracker movement, vegetation growth, maintenance access, and structural design must be evaluated together.

Design permanent drainage to spread, slow, infiltrate, and convey

Permanent drainage should keep runoff from becoming a narrow, high-energy flow while providing a safe route for water that cannot infiltrate. The engineer should model panel driplines, road cross-drains, pad drainage, upslope inflows, and emergency overflow paths under the project’s design storms.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Vegetated swales and check dams

A broad, gently graded vegetated swale can spread flow, add roughness, and provide residence time for infiltration and sediment settling. Check dams may divide a swale into short storage steps and reduce velocity on a slope. They require stable geometry, appropriate spacing, an armored or vegetated overflow, and access for inspection and sediment removal.

Shallow depressions and infiltration areas

Shallow constructed or natural depressions can temporarily store runoff and release it through infiltration or a controlled outlet. Verify infiltration rates, seasonal groundwater, soil amendments, side slopes, and drawdown time. A depression that remains wet or overtops frequently can become a failure point rather than a treatment practice.

Filtration and underdrained practices

Filtration practices allow some water to infiltrate through engineered media while an underdrain carries excess flow. They can be useful where native soils infiltrate slowly or groundwater constraints limit full infiltration, but they need pretreatment, cleanouts, inspection ports, and a reliable discharge point.

Rank #4
Farm Plastic Supply - American Excelsior QuickGrass Pro - Green Erosion Control Blanket Landscape Roll, Erosion Control Blanket (8' x 112.5')
  • 100% Biodegradable - The top of each blanket is covered with photo-degradable or biodegradable netting. The blankets are naturally seed-free and contain no chemical additives. The Dimensions of this product depending on shipping are 7.5' x 112.5'.
  • Safeguard Topsoil - Excelsior netting is intended to safeguard topsoil from water and wind erosion while also promoting the perfect growth environment for grass seed. Wet curled excelsior fibers increase slightly in-depth and connect to form a robust fiber matrix with a built-in swell.
  • Versatile Product - Many industries use excelsior netting, particularly landscaping and road construction businesses and contractors working on residential, industrial, and commercial developments. They’ve also been used to improve drainage and waterways, and even landfill operators use them.
  • Strong Wooden Fibers - Wet curled excelsior fibers slightly expand in thickness and interlock to form a strong, fiber matrix and creating a built-in swell factor. This allows the fibers to have close contact with the area it is placed upon. Basically, the mat clings to the soil with “barbed” fibers to reduce soil loss and strengthen the foundation.
  • Provides Soil Nutrience - Aspen wood fibers are a renewable resource and act as mulch providing nutrients to the soil during breakdown. The fibers can be either natural or dyed green for instant color.

Retention, French drains, dry wells, and diversions

Retention areas, French drains, dry wells, or designed diversions may fit particular soils and drainage areas. Their suitability depends on groundwater separation, pretreatment, maintenance access, and the consequences of clogging. A diversion should move water to a stable outlet; it should not simply shift erosion to a neighboring parcel or streambank.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Protect foundations and electrical equipment

Grade or drain around piles, equipment pads, inverters, transformers, and cable routes so water does not pond against them or scour their supporting soil. Provide stable outlets and emergency overflow routes. Coordinate civil grading with structural pile design and electrical clearances; adding a drainage ditch after equipment is installed can create new undermining or access problems.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

Use disconnected impervious surfaces carefully

MPCA treats panels as impervious surfaces but recognizes a disconnected condition when runoff is directed onto intervening and underlying pervious vegetated soil and can infiltrate before reaching another impervious feature. Its calculator estimates a volume credit using soil type, pervious and impervious area, and panel runoff depth.

More vegetated distance between panels, a lower impervious-to-pervious ratio, and higher-infiltration soils increase the potential credit. The credit can substantially reduce remaining treatment needs in favorable conditions, but it does not automatically satisfy every required infiltration volume. Document the flow path, soil assumptions, vegetation condition, and receiving features, then verify the result against the applicable permit criteria.

Operate, inspect, and maintain the system

Stormwater controls lose performance when vegetation dies, sediment fills storage, outlets clog, or a vehicle creates a shortcut through a swale. Assign a responsible owner and budget for operation and maintenance before construction begins.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Routine inspection tasks

  • Walk panel drip edges, row ends, swales, outlets, road ditches, culverts, and equipment pads for rills, gullies, exposed roots, or undermining.
  • Check that vegetation remains dense and uniform and reseed failed areas before the next wet season.
  • Remove sediment from traps, forebays, channels, or infiltration features when the approved maintenance trigger is reached.
  • Clear debris from culverts, underdrains, overflow structures, and diversion inlets.
  • Repair damaged matting, check dams, channel lining, berms, and outlet protection with materials and anchoring suited to the flow.
  • Inspect after major rain as well as at permit-required intervals, and retain dated records, photographs, rainfall information, and corrective actions.

Plan for unusual storms and floods

Designated overflow routes should keep an extreme event from cutting through rows or across electrical equipment. Keep access roads passable for inspection and emergency work, and verify that floodwater will not float, overturn, or short-circuit equipment. Reassess controls after any storm that changes a channel or exposes foundations.

Match the plan to the governing jurisdiction

Requirements vary with location, project size, receiving waters, soil, and permit type. Minnesota-specific values and treatment approaches should not be copied into another state without checking local rules. Wisconsin DNR lists a dedicated post-construction guide for ground-mounted solar arrays, identified as guide 3800-2023-01 and effective February 2024, on its stormwater publications and guidance page. Ontario guidance states that erosion and sediment controls may be needed during both construction and operation; its design-and-operations discussion is available in Chapter 6 of the Technical Guide for Renewable Energy Approvals.

Before finalizing drawings, obtain the current construction and post-construction permits, local drainage standards, floodplain information, and approved erosion-and-sediment-control plan. A qualified professional should sign or verify grading, hydrology, infiltration testing, outlet stability, and inspection requirements.

A practical implementation sequence

  1. Survey and map: Delineate contributing drainage, soils, slopes, waterways, flood hazards, existing vegetation, and proposed impervious features.
  2. Set preservation limits: Mark no-clearing zones, natural channels, topsoil stockpiles, and equipment routes before mobilization.
  3. Model the layout: Account for dripline discharge, row spacing, tracker movement, roads, pads, trenches, upslope inflow, and emergency overflows.
  4. Phase earthwork: Limit open areas, avoid wet-soil trafficking, and stabilize any area that will be idle under the applicable permit deadline.
  5. Install temporary BMPs: Build perimeter controls, slope drains, check dams, sediment traps, stabilized entrances, and other specified measures before disturbance expands.
  6. Build permanent controls: Construct swales, depressions, filtration or retention features, diversions, stable outlets, and foundation drainage to the engineered details.
  7. Restore soil and seed: Replace topsoil where specified, decompact suitable areas, seed the approved perennial mix, and install mulch or matting where needed for establishment.
  8. Verify performance: Inspect after rainfall, correct failures, document vegetation coverage, and confirm that drainage does not undermine piles, pads, roads, or electrical equipment.
  9. Operate to a schedule: Assign inspection responsibility, define sediment and vegetation maintenance triggers, preserve access, and update the plan after storms or site changes.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

erosion controlrenewable energysite drainagesoil erosionsolar farmsstormwater management

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Recommended PC Tool
Recommended PC Tool
Windows Errors? Fix Them Before They SpreadFree repair scan
Crashes, No Sound, or Screen Glitches?Free driver scan

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.