Data centers in arid climates can cut direct water demand by tuning controls, using dry or outside-air cooling when weather permits, selecting heat-rejection systems that match rack density, tightening cooling-tower operations, and substituting reliable non-potable supplies for drinking water. The best choice is site-specific: evaporative cooling usually lowers electricity use but consumes water, while dry and mechanical systems conserve water but can increase power demand and grid-related impacts.
Operators should evaluate water consumption and withdrawal, electricity and PUE, peak-temperature performance, workload density, watershed stress, source reliability, and the cost and maintainability of each design together. A lower on-site water number is not automatically a lower total environmental impact.
As an Amazon Associate I earn from qualifying purchases.
Do data centers use water to cool servers?
Servers produce heat that must be moved out of the building continuously. In a conventional chilled-water plant, chillers transfer heat to condenser water, and cooling towers reject that heat by evaporating some of the water into the atmosphere. Towers also discharge blowdown—water intentionally drained to prevent dissolved minerals from concentrating—and replace it with makeup water. The resulting demand depends on IT heat load, tower and chiller design, weather, water chemistry, controls, and operating efficiency.
Water may also be used for humidification, equipment maintenance, sanitation, and other facility functions. A chip-level liquid loop can reduce or eliminate routine evaporative cooling at the IT equipment, but it does not by itself prove that the entire facility is water-free. The external heat-rejection system still determines whether a site uses towers, dry coolers, or another process.
#1 Best Overall
- Read Before You Buy — No Video Output: These adapters support charging and USB 2.0 data transfer, but cannot transmit video signals. Except for standard USB webcams (which use USB data only), they are not compatible with HDMI/DisplayPort cables, video-capable USB-C hubs, or docking stations with video output.
- Convert USB-A Ports to USB-C: Designed to connect USB-C earphones, cables, flash drives, card readers, and other USB-C accessories to standard USB-A ports. Plug-and-play with no drivers or software required.
- Aluminum Alloy Housing: Built with a sturdy aluminum alloy shell that aids in heat dissipation and protects against daily wear and scratches. Designed to maintain a stable and secure connection.
- Compact & Travel-Friendly: The ultra-compact design allows the adapter to stay plugged into your device without blocking adjacent ports or adding bulk, reducing wear and tear on your original USB ports.
- 12-Month Warranty: Backed by a 12-month manufacturer warranty for peace of mind. Designed to meet strict quality control standards for reliable everyday performance.
Why hot, dry regions need a different cooling strategy
Arid sites face two opposing conditions. Low humidity can make evaporative cooling thermodynamically effective, yet freshwater supplies may be scarce or legally constrained. High summer temperatures also reduce the hours when outside air or dry coolers can carry the full heat load. A design that performs well during mild nights may need a different mode during the annual peak.
Microsoft describes one direct-air system that uses water only when outside air exceeds 85°F (29.4°C), while noting that water demand rises in hotter climates. That threshold is a Microsoft fleet description, not a universal engineering limit. A proposed facility must model its own temperature and humidity profile, redundancy requirement, and IT load rather than adopting 85°F as a standard.
Start with a water-and-energy decision framework
Before choosing equipment, establish the boundary of the comparison. Review each option against the same operating year and design load, and document assumptions in the procurement and permitting record.
Free tools Windows power users keep installed
One-click scans. No signup required.
Rank #2
- 5-in-1 USB-C Hub: Experience comprehensive connectivity featuring a Power Delivery input, two USB-A 2.0 ports, a USB-A 3.0 port, and an HDMI port. (Note: The USB-C power delivery input port is only for connecting an external wall charger to power your laptop and cannot power peripheral devices.)
- 90W Pass-Through Charging: Achieve optimal charging with 90W pass-through power to your laptop, supported by a total input of 100W, with the hub reserving 10W for operational efficiency. (Note: Wall charger not included.)
- Quick Data Transfers: Accelerate your productivity with rapid data transfers using a high-speed 5Gbps USB 3.0 port and two 480Mbps USB 2.0 ports.
- 4K HDMI Display: Enhance your visual experience with a hub capable of delivering 4K resolution at 30Hz in both mirror and extend modes. Please note that this hub is compatible with MacBook (macOS 12 and newer), Windows 10 and 11, ChromeOS, and laptops equipped with DP Alt Mode and Power Delivery. Note: This device is not compatible with Linux.
- What You Get: Anker USB-C Hub (5-in-1, 4K HDMI), welcome guide, 18-month warranty, and our friendly customer service.
| Decision factor | What to measure | Why it matters |
|---|---|---|
| Direct water | Consumption and withdrawal, in liters or cubic meters, with cooling, humidification, sanitation, and other uses identified | A withdrawal figure is not interchangeable with a consumption figure. |
| Electricity | PUE, peak electrical demand, and expected energy use by cooling mode | Water-saving mechanical cooling can raise electricity use and associated grid water impacts. |
| Climate performance | Hours in dry, economizer, hybrid, and mechanical modes at local peak temperature and humidity | Annual averages can hide the conditions that determine reliability and water use. |
| Workload and density | Rack power, high-density zones, growth rate, and required supply temperature | AI and other dense workloads may require liquid cooling even when general-purpose racks do not. |
| Water source | Potable, reclaimed, recycled process, or other non-potable supply; seasonal capacity and drought reliability | Replacing drinking water is useful only if the alternative is dependable and responsibly sourced. |
| Delivery risk | Capital cost, maintenance, treatment chemicals, permits, utility capacity, and failure modes | A theoretically efficient system is unsuitable if operators cannot maintain it or utilities cannot support it. |
Tune existing systems before buying new equipment
Control changes are often the quickest way to reduce both water and energy use. The U.S. Department of Energy (DOE) notes that facilities frequently set temperatures below equipment guidance or constrain humidity more narrowly than necessary. Those settings increase chiller and fan work and can trigger unnecessary humidification or dehumidification.
Audit temperature and humidity setpoints
- Collect the current equipment guidance for servers, storage, networking, and power systems.
- Compare the allowed envelope with building-management-system setpoints and alarm limits.
- Check sensor placement and calibration; a poorly located sensor can make a room appear hotter or more humid than the IT inlet conditions.
- Widen controls only after confirming that every installed device remains within its specified operating range.
Use trend data to find simultaneous humidification and dehumidification, excessive reheat, or cooling that continues after a load reduction. DOE also describes air-management measures that can permit higher chilled-water temperatures and lower airflow, reducing chiller and fan energy. Savings vary with climate, airflow design, and operating conditions, so verify them with metered results rather than assuming a fixed percentage.
Improve airflow and heat-exchanger performance
Seal bypass paths, separate hot and cold aisles where appropriate, and keep filters, coils, and heat exchangers clean. Fouling raises approach temperatures and encourages operators to lower setpoints or increase flow. Microsoft has described using real-time weather data and operating analytics to audit facilities; that is an example of a control approach, not an independent performance guarantee.
Rank #3
- Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
- Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
- Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
- Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
- What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.
Use dry and outside-air modes when weather allows
Air-side economizers and dry coolers can reject heat without evaporating water during suitable outdoor conditions. In a hot region, a hybrid plant can run dry for cooler hours and add evaporative assistance only when the outdoor condition exceeds the dry system’s capacity. This arrangement reduces annual water use while preserving peak-day capacity.
Design the changeover around the local climate
- Use hourly weather data for the full design life, including extreme heat and dusty conditions.
- Define changeover rules for temperature, humidity, enthalpy, air quality, and wildfire smoke where relevant.
- Size dry equipment for the required redundancy at the local summer design point, not merely for an annual average.
- Model fan power, coil approach temperature, filtration, and maintenance access in every operating mode.
Dry operation is not automatically impact-free. It can require larger heat exchangers, more fan power, or additional mechanical refrigeration. Compare its electricity profile and local grid conditions with the water savings it delivers.
Match liquid cooling to high-density workloads
Direct liquid cooling moves heat from processors or other IT components into a recirculating loop. It is especially relevant where rack density makes room-air cooling inefficient or physically impractical. The loop’s fluid is reused, but the facility still needs a heat-rejection path.
Rank #4
- Dual Converters, Infinite Potential:Includes 2× USB C male to USB A female adapters and 2× USB A male to USB C female adapters. Perfect for a wide range of uses—tablets with Bluetooth keyboards, expand USB ports on macbook, and more. Two different converters for all your daily needs
- Next-Level 10Gbps & 3A Charging: No more slow 480Mbps, this usb to usb c adapter has a transfer speed of up to 10Gbps, allowing you to do more transferring in less time. This usb adapter fits both USB A and USB C charger, supporting up to 3A fast charging
- Upgraded Exquisite Craftsmanship: With an aluminum alloy housing and metal connector, the usbc to usb adapter is extremely durable and sturdy. Rigorously tested to withstand more than 10,000 times of plugging and unplugging, ensuring long-lasting performance
- Broad Compatible: The usb c to usb adapter widely supports all USB C/ USB A devices like laptops, tablets, cellphones, car chargers, and phone chargers. Such as compatible with MacBook Pro/Air 2023/2022, Thunderbolt 4/3 Devices,Apple MagSafe Watch 9/8/7/SE/Ultra, iPad Pro 2022/2021, Samsung Galaxy S23/S20/S10, and iPhone 17/16/15 Pro. Plug and play
- Please Note: To reach 10Gbps speed, keep the cable under 3.3 ft. For USB A Male to USB C adapters, try flipping the USB C connector. USB C Male to USB A adapters support bidirectional 10Gbps transfer within 3.3 ft
What to verify in a liquid-cooling design
- Heat rejection: Determine whether the secondary loop connects to air-cooled chillers, dry coolers, or cooling towers. Tower-based rejection can still consume evaporative water.
- Density and distribution: Confirm rack power, manifold capacity, coolant distribution units, supply temperatures, and expansion plans.
- Reliability: Provide redundant pumps, controls, leak detection, isolation, and a safe fallback mode for equipment that cannot accept liquid.
- Serviceability: Plan filtration, water-quality management, component replacement, and technician procedures.
Microsoft describes a particular AI-oriented design in which coolant recirculates in a closed loop and air-cooled chillers avoid evaporative cooling water during operation. That company-specific claim does not mean all facility water use is zero, nor does it establish the same result for every liquid-cooling architecture. DOE guidance likewise distinguishes tower-based and air-cooled heat rejection.
Reduce losses in cooling towers that remain in service
Evaporation is intrinsic to tower operation, but makeup and blowdown can be managed. The first step is to establish current cycles of concentration, conductivity, makeup volume, blowdown volume, chemical dosing, and discharge limits.
Quick wins for a faster PC:
Scan for outdated or missing drivers - takes under a minuteDriver Scan →Repair Windows errors before they cause bigger problemsFix Now →Increase cycles of concentration carefully
DOE attributes a benchmark from its Cooling Tower Best Management Practice: increasing cycles of concentration from three to six reduces makeup-water requirements by 20% and blowdown by 50%. The figure is a DOE-attributed guidance value, and the change is not universal. Higher cycles concentrate minerals, so operators must confirm water chemistry, corrosion risk, scale control, equipment warranties, and permit limits before changing the setpoint.
Best Value
- 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
- Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
- Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
- HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
- What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.
Control solids and recover blowdown
Side-stream filtration can remove suspended solids and reduce fouling. Filtration alone does not reduce water use unless it enables a lower blowdown rate or another operational reduction. Reverse osmosis can treat blowdown and return permeate as makeup water, reducing freshwater demand. DOE cautions that RO adds energy, capital, operations and maintenance, concentrate disposal, and potentially a PUE penalty. Compare those costs and impacts with the site’s water scarcity and discharge constraints.
Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Can data centers use reclaimed water?
Reclaimed municipal wastewater, recycled process water, and other non-potable supplies can reduce competition with drinking-water users when treatment, pipelines, permits, and community agreements are in place. The supply must remain reliable during drought, not just during normal years.
Requirements for a responsible substitution
- Confirm treatment quality, corrosion and scaling behavior, and compatibility with tower chemistry or other cooling equipment.
- Secure dual supplies or storage if a reclaimed-water interruption could threaten operations.
- Define ownership, monitoring, discharge, and emergency procedures with the utility and regulator.
- Assess basin-level ecological effects and seasonal availability; non-potable water still has infrastructure and treatment impacts.
AWS describes working with Loudoun Water on reclaimed-water supply and on-site treatment. Google reported in a 2022 historical article that more than 25% of its data-center campuses used reclaimed or non-potable water. That percentage belongs to the article’s publication-era report and should not be treated as a current global figure.
Measure water use so comparisons are fair
Water Usage Effectiveness (WUE) is generally expressed as liters of water per kilowatt-hour of IT energy, but the numerator and boundary differ among disclosures. A credible comparison states whether the metric covers withdrawal or consumption, which uses are included, the reporting period, and the IT-energy denominator.
| Publisher and period | Reported figure | Qualification |
|---|---|---|
| AWS, 2025 | 0.12 L/kWh | Global withdrawal WUE disclosed by AWS; withdrawal is not the same as consumption. |
| Microsoft, 2025 average, reported in 2026 | 0.27 L/kWh | Company-reported average; compare only after confirming matching boundaries and definitions. |
| Google, 2025 reporting, published 2026 | 87% of freshwater withdrawal from sources at low or medium risk of water depletion or scarcity | A sourcing-risk measure, not a WUE value or proof of zero local impact. |
Microsoft defines WUE as water used for humidification and cooling divided by IT equipment energy. AWS labels its disclosed metric withdrawal WUE. Those definitions cannot be ranked as if they measured the same thing. Add local watershed stress, seasonal supply, source type, and indirect electricity-related water to the dashboard.
A practical implementation sequence
- Set the baseline: Meter makeup, blowdown, reclaimed and potable inflows, cooling-mode hours, IT energy, total facility energy, and weather.
- Fix controls: Validate sensors, remove unnecessary overcooling, widen permissible humidity where equipment allows, and eliminate simultaneous humidification and dehumidification.
- Improve airflow and maintenance: Seal bypasses, clean coils and filters, inspect heat exchangers, and verify fan and pump control.
- Model operating modes: Quantify dry, outside-air, evaporative, and mechanical operation at the local peak condition and under projected rack growth.
- Test tower measures: Evaluate cycles of concentration, filtration, chemical control, and blowdown recovery with water-quality and discharge experts.
- Evaluate liquid cooling: For dense workloads, assess a complete chain from chip loop to final heat rejection, including redundancy and maintenance.
- Secure alternative water: Investigate reclaimed or recycled supplies with utilities and regulators, including drought-period contingencies.
- Report transparently: Publish boundaries, withdrawal versus consumption, source, period, IT denominator, and local watershed context.
Common mistakes and how to avoid them
- Treating a water-free chiller as a water-free facility: Include humidification, sanitation, treatment, and all heat-rejection equipment in the boundary.
- Using one climate threshold everywhere: Validate any claimed temperature trigger against the proposed site’s weather and equipment.
- Chasing a low WUE while ignoring PUE: Calculate the electricity and potential grid-water consequences of dry or mechanical cooling.
- Raising tower cycles without chemistry review: Check scale, corrosion, biological control, warranties, and discharge permits first.
- Counting reclaimed water as automatically sustainable: Examine treatment energy, pipeline capacity, ecological effects, and drought reliability.
- Comparing company metrics without definitions: Do not rank withdrawal WUE against consumption WUE or mix different reporting years and scopes.
The durable solution is a portfolio: efficient controls and airflow first, dry or outside-air operation whenever local conditions permit, targeted liquid cooling for dense loads, disciplined tower management, and non-potable supplies where they are reliable and locally appropriate. Evaluate the combination against both water scarcity and energy performance at the actual site.
Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.