Fanless liquid-cooled AI servers use liquid to remove heat from more of the server than a conventional cold-plate setup, so fans are not needed for the server’s relevant cooling path. That does not mean the rack or data center has no pumps, fans, or other moving equipment. The key buying distinction is how much of the server is liquid-cooled, what air cooling remains, and whether the facility can handle the resulting heat and water flow.
What “fanless” means in an AI server
In this context, fanless describes the server cooling design—not a completely silent or pump-free data center. A system may rely on liquid cooling across its heat-producing components and still require pumps, coolant distribution units (CDUs), rack-level heat rejection, and facility equipment. Some of those systems may themselves use fans.
As an Amazon Associate I earn from qualifying purchases.
The phrase also depends on cooling coverage. HPE describes an eight-layer approach spanning GPU, CPU, blade, storage, network fabric, rack or cabinet, pod or cluster, and CDU. Lenovo describes its full-system direct-water cooling as covering all components, including power supplies, for fanless operation. Those are vendor descriptions of their designs, not independent proof that every configuration sold under a product family is fanless.
Free tools Windows power users keep installed
One-click scans. No signup required.
How fanless direct liquid cooling differs from other designs
| Approach | How heat is removed | What “fanless” means here |
|---|---|---|
| Fanless direct liquid cooling | Liquid removes heat across a broad portion of the server; the extent of coverage varies by design. | The relevant server cooling path does not rely on server fans. Pumps and facility cooling equipment may still be required. |
| Hybrid direct liquid cooling | Cold plates cool selected hot components while fans cool components or areas not covered by liquid. | Not fanless: server fans remain part of the cooling design. |
| Liquid-to-air cooling | A heat exchanger uses chilled facility water to cool air circulated through the server. | Liquid is part of the heat-rejection path, but that does not by itself make the server fanless. |
| Immersion cooling | Server equipment is immersed in a cooling fluid as part of a separate deployment approach. | Do not treat immersion as a synonym for fanless direct liquid cooling; the cited vendor material does not establish that the named immersion systems are fanless AI servers. |
HPE’s solution page describes fanless and hybrid direct liquid cooling as different options. It states support for up to 400 kW per rack for fanless DLC and up to 200 kW per rack for hybrid DLC. These are HPE’s stated capacities, not universal limits or a guarantee for a particular rack; the supported configuration and facility design matter.
#1 Best Overall
- Read Before You Buy — No Video Output: These adapters support charging and USB 2.0 data transfer, but cannot transmit video signals. Except for standard USB webcams (which use USB data only), they are not compatible with HDMI/DisplayPort cables, video-capable USB-C hubs, or docking stations with video output.
- Convert USB-A Ports to USB-C: Designed to connect USB-C earphones, cables, flash drives, card readers, and other USB-C accessories to standard USB-A ports. Plug-and-play with no drivers or software required.
- Aluminum Alloy Housing: Built with a sturdy aluminum alloy shell that aids in heat dissipation and protects against daily wear and scratches. Designed to maintain a stable and secure connection.
- Compact & Travel-Friendly: The ultra-compact design allows the adapter to stay plugged into your device without blocking adjacent ports or adding bulk, reducing wear and tear on your original USB ports.
- 12-Month Warranty: Backed by a 12-month manufacturer warranty for peace of mind. Designed to meet strict quality control standards for reliable everyday performance.
Which AI servers are described as fanless or liquid-cooled?
HPE Cray Supercomputing EX2500 and EX4000
HPE’s solution overview labels the EX2500 as using 100% fanless direct liquid cooling and associates the EX systems with scientific research, simulation, large-scale deep-learning training, and predictive analytics. The overview also describes the EX4000 as a large-scale system, but does not establish that every EX4000 blade configuration is fanless. Confirm the exact system and blade configuration with HPE before treating it as a fanless deployment.
HPE ProLiant Compute XD685
HPE’s overview describes the XD685 as an eight-GPU, 5U system for natural-language processing, large language model, and multimodal training, with direct liquid cooling available as an option. That does not establish that the system is inherently fanless; ask which cooling configuration is included in the proposed build.
Rank #2
- 5-in-1 USB-C Hub: Experience comprehensive connectivity featuring a Power Delivery input, two USB-A 2.0 ports, a USB-A 3.0 port, and an HDMI port. (Note: The USB-C power delivery input port is only for connecting an external wall charger to power your laptop and cannot power peripheral devices.)
- 90W Pass-Through Charging: Achieve optimal charging with 90W pass-through power to your laptop, supported by a total input of 100W, with the hub reserving 10W for operational efficiency. (Note: Wall charger not included.)
- Quick Data Transfers: Accelerate your productivity with rapid data transfers using a high-speed 5Gbps USB 3.0 port and two 480Mbps USB 2.0 ports.
- 4K HDMI Display: Enhance your visual experience with a hub capable of delivering 4K resolution at 30Hz in both mirror and extend modes. Please note that this hub is compatible with MacBook (macOS 12 and newer), Windows 10 and 11, ChromeOS, and laptops equipped with DP Alt Mode and Power Delivery. Note: This device is not compatible with Linux.
- What You Get: Anker USB-C Hub (5-in-1, 4K HDMI), welcome guide, 18-month warranty, and our friendly customer service.
Lenovo ThinkSystem SD650 V3 and SD665-N V3 Neptune
Lenovo identifies both as Neptune server platforms and describes full-system direct-water cooling that covers all components, including power supplies, for fanless operation. The statement applies to Lenovo’s full-system cooling mode; verify that the specific model and configuration being quoted uses that mode rather than assuming every Neptune configuration does.
Dell PowerEdge XE9780L
Dell markets the XE9780L as a liquid-cooled AI server and lists configurations with eight NVIDIA HGX B300 GPUs or eight HGX B200 GPUs. The cited product information does not establish that the XE9780L is fanless, so classify it as liquid-cooled unless Dell confirms the proposed configuration’s fan and cooling coverage.
Rank #3
- Sleek 7-in-1 USB-C Hub: Features an HDMI port, two USB-A 3.0 ports, and a USB-C data port, each providing 5Gbps transfer speeds. It also includes a USB-C PD input port for charging up to 100W and dual SD and TF card slots, all in a compact design.
- Flawless 4K@60Hz Video with HDMI: Delivers exceptional clarity and smoothness with its 4K@60Hz HDMI port, making it ideal for high-definition presentations and entertainment. (Note: Only the HDMI port supports video projection; the USB-C port is for data transfer only.)
- Double Up on Efficiency: The two USB-A 3.0 ports and a USB-C port support a fast 5Gbps data rate, significantly boosting your transfer speeds and improving productivity.
- Fast and Reliable 85W Charging: Offers high-capacity, speedy charging for laptops up to 85W, so you spend less time tethered to an outlet and more time being productive.
- What You Get: Anker USB-C Hub (7-in-1), welcome guide, 18-month warranty, and our friendly customer service.
What vendor savings and capacity figures do—and do not—show
HPE’s October 10, 2024 announcement says fanless DLC reduces cooling power required per server blade by 37% compared with hybrid DLC alone. The same announcement attributes to HPE CEO Antonio Neri a claim of 90% lower cooling power consumption compared with traditional air-cooled systems. Both figures are vendor claims with different comparison baselines; neither is an independent, cross-vendor test or a universal estimate for total data-center energy.
Lenovo’s page cites up to 40% energy savings in its sixth-generation Neptune cooling context, but the comparison baseline is not sufficiently clear to use that percentage as a general estimate. For a purchasing decision, request measured whole-system energy under the same workload and define the measurement boundary: server, rack, or facility.
Rank #4
- Dual Converters, Infinite Potential:Includes 2× USB C male to USB A female adapters and 2× USB A male to USB C female adapters. Perfect for a wide range of uses—tablets with Bluetooth keyboards, expand USB ports on macbook, and more. Two different converters for all your daily needs
- Next-Level 10Gbps & 3A Charging: No more slow 480Mbps, this usb to usb c adapter has a transfer speed of up to 10Gbps, allowing you to do more transferring in less time. This usb adapter fits both USB A and USB C charger, supporting up to 3A fast charging
- Upgraded Exquisite Craftsmanship: With an aluminum alloy housing and metal connector, the usbc to usb adapter is extremely durable and sturdy. Rigorously tested to withstand more than 10,000 times of plugging and unplugging, ensuring long-lasting performance
- Broad Compatible: The usb c to usb adapter widely supports all USB C/ USB A devices like laptops, tablets, cellphones, car chargers, and phone chargers. Such as compatible with MacBook Pro/Air 2023/2022, Thunderbolt 4/3 Devices,Apple MagSafe Watch 9/8/7/SE/Ultra, iPad Pro 2022/2021, Samsung Galaxy S23/S20/S10, and iPhone 17/16/15 Pro. Plug and play
- Please Note: To reach 10Gbps speed, keep the cable under 3.3 ft. For USB A Male to USB C adapters, try flipping the USB C connector. USB C Male to USB A adapters support bidirectional 10Gbps transfer within 3.3 ft
The available vendor materials do not establish comparable independent results for energy use, acoustics, reliability, water consumption, or total cost across these systems. A fanless server therefore should not be assumed to make an entire facility silent, use less water, or cost less to operate.
What to verify before specifying a rack
Cooling a high-density AI system is a facility-design decision as well as a server purchase. HPE notes that the selected cooling type must match design and facility capabilities. Request a configuration-specific plan that answers these questions:
Best Value
- 5-in-1 Connectivity: Equipped with a 4K HDMI port, a 5 Gbps USB-C data port, two 5 Gbps USB-A ports, and a USB C 100W PD-IN port. Note: The USB C 100W PD-IN port supports only charging and does not support data transfer devices such as headphones or speakers.
- Powerful Pass-Through Charging: Supports up to 85W pass-through charging so you can power up your laptop while you use the hub. Note: Pass-through charging requires a charger (not included). Note: To achieve full power for iPad, we recommend using a 45W wall charger.
- Transfer Files in Seconds: Move files to and from your laptop at speeds of up to 5 Gbps via the USB-C and USB-A data ports. Note: The USB C 5Gbps Data port does not support video output.
- HD Display: Connect to the HDMI port to stream or mirror content to an external monitor in resolutions of up to 4K@30Hz. Note: The USB-C ports do not support video output.
- What You Get: Anker 332 USB-C Hub (5-in-1), welcome guide, our worry-free 18-month warranty, and friendly customer service.
- Compute configuration: Which workload, accelerator model and count, CPU, memory, networking, and software stack are included? Product families and GPU configurations are not interchangeable.
- Cooling coverage: Which components are cooled by liquid, and which—if any—still depend on server fans? Is the proposed system full-system direct water cooling, component-level DLC, or a hybrid?
- Rack and heat rejection: What rack-level capacity is supported for the exact build? What CDU capacity, heat-rejection equipment, redundancy, and service arrangements are required?
- Facility readiness: What water temperature and flow does the design require, and can the facility provide them reliably? What power and infrastructure changes are needed?
- Monitoring and service: How are flow, temperature, and cooling faults monitored? Who maintains the server-side and facility-side equipment, and how is service handled during a fault?
- Economics and evidence: Compare total cost and measured energy using the same workload, operating conditions, and system boundary. Ask vendors to document their baselines and assumptions rather than comparing headline percentages.
Confirm current availability, accelerator options, and cooling specifications with the vendor for the exact configuration under consideration. Product pages and solution overviews may not establish every current build option.
Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.