Do these 3 things before closing this tab:
1Scan for outdated or missing drivers - takes under a minute2Clear out junk files and repair common Windows errors3Fix the driver behind crashes, sound loss and screen glitchesBECROWNED is slated for Nintendo Switch 2 in Q1 2027, according to Nintendo Everything’s October 7, 2026 report on the announcement by publisher Top Hat Studios and developer 13th Street Studio. The report does not confirm PS5 or Xbox Series versions, an earlier release date, or a delay; it says a specific launch date will be shared when announced.
What platforms is BECROWNED coming to?
The October 7, 2026 report confirms an unveiling for Nintendo Switch 2. Although the supplied headline names PS5 and Xbox Series as well, the report does not verify versions for either platform. Those platform claims should be treated as unconfirmed unless Top Hat Studios or 13th Street Studio announces them. Nintendo Everything’s announcement report identifies Top Hat Studios as publisher and 13th Street Studio as developer.
| # | Preview | Product | Price | |
|---|---|---|---|---|
| 1 |
|
Mario Kart™ World (Nintendo Switch 2) | $79.00 | Buy on Amazon |
| 2 |
|
Star Fox™ - Nintendo Switch 2 | $59.00 | Buy on Amazon |
| 3 |
|
Donkey Kong Bananza (Nintendo Switch 2) | $69.00 | Buy on Amazon |
| 4 |
|
Pokémon Pokopia - Nintendo Switch 2 | $69.00 | Buy on Amazon |
As an Amazon Associate I earn from qualifying purchases.
When does BECROWNED come out?
The reported launch window is Q1 2027, meaning the first quarter of 2027—not a confirmed day or month. Nintendo Everything says a specific date will be provided once announced. No exact release date is established in the report.
Has BECROWNED been delayed?
The headline supplied for this topic describes the Q1 2027 window as a delay, but Nintendo Everything’s report does not give an earlier schedule or say that the game was delayed. It also provides no reason for a delay. On the available information, Q1 2027 is a confirmed reported window; a delay and its cause are not established.
#1 Best Overall
- Race from one course to another through interconnected paths that span the world
- Traverse mountains, forests, cities, and more—with shifting weather patterns and a day/night cycle
- Ride on rails, jump off walls, skim across water, and more as you race for the finish line
- Take on the adrenaline-packed Knockout Tour—a fierce 24-driver elimination mode
- Explore courses at your own pace and wander the world to discover fun surprises in Free Roam
What kind of game is BECROWNED?
Nintendo Everything describes BECROWNED as surreal horror. Its overview follows Richard Torrance, a man driven by ambition and a search for happiness who encounters disturbing, bizarre places. The overview calls it “A tale of a man who became a prisoner of his own ambitions.”
Setting and style
The described locations include a vast castle and its surroundings, a decrepit hospital, and a liminal motel. The game’s stated influences include 1970s and 1980s grindhouse cinema, dark satirical humor associated with 1970s French horror, and Russian cultural and literary references.
Rank #2
- Blast off on a high-octane adventure to save a star system from invasion
- Tear through space, soar across planets, and shoot loads of foes out of the sky at every step of the way
- A cinematic take on the Star Fox 64 story, featuring fully voiced dialogue, an epic orchestral soundtrack, and a complete visual overhaul for the Nintendo Switch 2 system
- Enter first-person mode to experience the action from inside the cockpit, and even use mouse controls to fly
- Invite a second player* to join you as a gunner using Nintendo Switch 2 mouse controls
Exploration and choices
The overview describes exploration, hidden passages, optional puzzles, combat against varied enemies and bosses, and resource management. It also presents a nonlinear story in which choices affect other characters and lead to multiple endings. These are descriptions from the game overview reproduced in the report, not hands-on findings.
Quick Recap
Rank #4
- Shape the world and build a cozy new life with Pokémon as a Ditto transformed to look like a human.
- Use other Pokémon’s moves, like Bulbasaur’s Leafage, to revitalize and navigate the world around you.
- Meet and befriend more Pokémon as you help nature flourish.
- Gather materials to create items and furniture, till the fields to grow delicious crops, build homes for the Pokémon you meet, and more—there’s so much to do!
- Experience a world with varied weather, real-time days and nights, and other surprises.
Rank #3
- Explore a vast underground world—by smashing your way through it!
- A brand-new 3D platforming action adventure starring Donkey Kong and Pauline
- Bash through just about anything in groundbreaking exploration! Crash through walls and carve tunnels—the more you smash, the more areas open up to you
- Pair up with Pauline to use Bananza Transformations: smash through obstacles with the raw strength of Kong form, gallop with incredible speed as a Zebra, and more
- Team up with a friend in two-player co-op as Donkey Kong and Pauline! Blast foes and terrain alike with Pauline’s voice as you explore together
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

