Seiki Advanced Planning and Scheduling

Paid Self-hostedWebWindows

Visit Seiki Advanced Planning and Scheduling Alternatives Pricing

Seiki Advanced Planning and Scheduling's own site

What Seiki Advanced Planning and Scheduling is

Seiki Advanced Planning and Scheduling, also called Seiki Scheduler, creates manufacturing production plans that use actual capacity to balance delivery dates and workload. It schedules operations against available resources, with support for real-time adjustments, machine and labor capacity planning, and material constraints. An interactive planning board summarizes active order loading and operation details, while built-in sequencing rules provide a starting schedule for planners to refine. Users can model schedule changes and compare saved snapshots before choosing a plan; scenario runs and saved snapshots require an optional Simulation license. Seiki EAI connects the Scheduler to ERP, MRP, PLM, and other databases, with one-way or bidirectional transfer. SQL views and CSV files are described as import methods. The product can run without ERP if works orders and routing templates are entered directly. It is licensed per resource, with no stated limit on resources, and Seiki says it can handle tens of thousands of operations, although saving changes takes longer as the database grows. Seiki AIR is browser-based and can run on a self-hosted web server or Microsoft IIS; Windows is also listed. Pricing is on request. Seiki was established in 1992 and is based in Brighton, United Kingdom.

Who it suits

Seiki Scheduler suits manufacturers planning discrete operations against resource capacity, especially those coordinating delivery dates and workload. It can also suit organizations needing ERP or database links, or a standalone setup with manually entered works orders and routings.

What it does well

  • Plans operations against available resource capacity.
  • Supports machine, labor, and material planning.
  • Provides what-if analysis before schedule commitment.
  • Connects with ERP, MRP, PLM, and databases.
  • Can run without an ERP system.

What to know first

  • Scenario runs require an optional Simulation license.
  • Standalone use requires manual order and routing entry.
  • Saving changes takes longer as the database grows.
  • Pricing is available on request.

Limits

The Scheduler is licensed per resource, with no stated limit to the number of resources. Running planning scenarios and saving snapshots requires an optional Simulation license. Seiki says saving changes takes longer as the database grows.

Plans

PlanBilled and limitsPrice
Seiki Schedulerlicensed per resource · no limit to resources statedOn request
Seiki Advanced Planning and Scheduling (Seiki Scheduler)Licensed per resource · No limit to the number of resources you can addOn request

As seikisystems.co.uk lists them, read 8 Oct 2026. The maker's own page has the final word.

Getting started

  1. Contact Seiki for pricing and an installation plan.
  2. Prepare works orders and routings for discrete manufacturing operations.
  3. Choose ERP or database data exchange through Seiki EAI, or enter works orders and routing templates directly for standalone use.
  4. Select a self-hosted, web, or Windows deployment.
  5. Ask Seiki about installation, implementation, customisation, and training.

Seiki Advanced Planning and Scheduling is a finite-capacity production scheduler for manufacturers that need delivery dates and workload balanced against real machine, labor, and material constraints. It suits operations with established works orders and routings, as well as companies that need a standalone option alongside ERP or MRP systems. The main trade-off is a resource-based license and a separate Simulation license for broader scenario participation.

Overview

Seiki Scheduler builds production plans around the capacity that is actually available, rather than treating every resource as unlimited. Planners can adjust schedules in real time and use graphical views to see order loading and operation information. Built-in sequencing rules create a starting schedule, while planners retain control to refine the result.

Scenario planning is a practical strength. Users can model schedule changes, save snapshots, compare alternatives, and apply the preferred plan only after reviewing its impact. The optional Simulation license extends that workflow to other users, while the FAQ describes a typical setup with one active master scheduler.

Scale is aimed at substantial manufacturing environments: Seiki describes schedules containing more than 30,000 operations and says the system can handle tens of thousands, although saving changes takes longer as the database grows. Before installation, discrete manufacturers need works orders and routings. A standalone deployment can accept those works orders and routing templates directly, but that makes preparation and ongoing data maintenance a customer responsibility.

Key features

Capacity-based scheduling

Finite-capacity scheduling accounts for available machines, labor, and materials when sequencing operations. That makes the output more useful for plants where bottlenecks and competing workloads determine whether promised dates are realistic.

Planning board and scenarios

The interactive planning board gives planners a visual summary of active loading and operation status. Baseline rules reduce the effort needed to create an initial plan, while manual refinement and saved what-if snapshots support decisions that need operational judgment.

Integration and standalone operation

Seiki EAI connects with ERP, MRP, PLM, Microsoft SQL, and other industry-standard databases. Data can move one way or in both directions, using SQL views and CSV files for imports into the Scheduler database. This makes it viable as a scheduling layer in an existing information stack, but third-party interfaces can add project time. It can also run without an ERP, provided the required manufacturing data is entered directly.

Browser delivery and security

Seiki AIR runs in a browser on almost any device and can be hosted on a self-hosted web server or Microsoft IIS. Seiki says releases include current security protocols and patches, with authentication procedures intended to prevent unauthorised access. A standard Scheduler installation may take as little as a week; interface work can extend implementation.

Pricing

Seiki Scheduler uses custom pricing and is licensed per resource. Seiki states that customers can add as many resources as needed, so the commercial model scales with the operation being scheduled rather than with a published seat quota. The Seiki Advanced Planning and Scheduling (Seiki Scheduler) plan has the same per-resource structure and no stated limit on resources.

There is no published price for either plan. The optional Simulation license is an additional consideration for organisations that want several users creating scenarios and saving snapshots for master-scheduler review. Buyers should also budget for implementation, customisation, training, support, and any third-party interface work. Customers with a current maintenance contract are entitled to the latest release through Seiki Support.

Platforms

Deployment options cover self-hosted installations, Windows, and web access through Seiki AIR. The browser model supports a self-hosted web server or Microsoft IIS, while standalone Scheduler use is available when an ERP connection is not required.

Who it's for

Seiki is a strong fit for discrete manufacturers coordinating constrained machines, labor, materials, and delivery commitments across large operation sets. It is particularly suitable when an organisation wants ERP/MRP integration but still needs a standalone fallback, visual planning, and formal scenario comparison.

It is less suitable for a small operation seeking transparent, self-service pricing or a lightweight scheduler that does not require works orders and routings. A business with many scenario participants should also account for the separate Simulation license and the usual single-master-scheduler arrangement.

Pros and cons

Pros

  • Real capacity constraints: machine, labor, and material planning are handled together, supporting more credible delivery commitments.
  • Scenario comparison: saved snapshots and what-if modelling let planners assess changes before committing them.
  • Integration flexibility: bidirectional EAI connections, SQL views, and CSV exchange suit varied ERP and database environments.
  • Large schedules: support for tens of thousands of operations serves complex manufacturing workloads.
  • Deployment choice: customers can use browser-based Seiki AIR, self-hosted infrastructure, Windows, or standalone operation.

Cons

  • Custom pricing: buyers cannot compare a published price, and licensing is tied to each resource.
  • Scenario concurrency cost: broader participation requires the optional Simulation license beyond the typical master scheduler.
  • Data preparation: works orders and routings are prerequisites, with standalone users responsible for entering them.
  • Growing database overhead: Seiki notes that saving changes takes longer as schedules and data expand.

Alternatives

Manufacturing Scheduling Software is the wider category to review when you want to compare several production-planning products.

Choose frePPLe instead if a free open-source Community edition, API/Linux/self-hosted/web deployment, or a cloud option capped at six scenarios is more important than Seiki's resource licensing.

Phoenix APS is worth considering when a free beta evaluation for Windows and API access meets your immediate evaluation needs.

Pick MIE Trak Pro when you want a broader Android, iOS, web, Windows, API, or self-hosted footprint and are comfortable requesting a quote.

GE Vernova Proficy Plant Applications suits buyers seeking hosted or on-premises coverage across process, discrete, and mixed manufacturing.

NETVIBES is an alternative for organisations focused on enterprise data-science roles with free-plan and trial options.

Accevo APS is the better direction when perpetual ownership or an annual subscription, with on-premise deployment, matches your procurement model.

Asprova APS is another quote-based, self-hosted Windows choice with a free trial and implementation services that may add cost.

DELMIA Demand Planning is a Windows alternative when package, business size, contract duration, and requirements should determine the quote.

Verdict

Choose Seiki Scheduler if your manufacturing operation needs finite-capacity planning, scenario control, and integration or standalone deployment at substantial scale. Its strongest reason to buy is the combination of real resource constraints, visual schedule management, and saved what-if comparisons. Look elsewhere if transparent pricing, unrestricted multi-user scenario work, or a simpler setup matters more than that depth.

Verdict

Seiki Scheduler combines finite-capacity planning with integration options and a standalone mode. Buyers should account for per-resource licensing, the optional Simulation license for scenario work, and the need to prepare works orders and routings.

Questions

How much does Seiki Scheduler cost?

Pricing is available on request. The Scheduler is licensed per resource.

Can it be used without an ERP system?

Yes. Works orders and routing templates can be entered directly.

Which systems can it connect to?

Seiki EAI interfaces with ERP, MRP, PLM, and other databases, including Microsoft SQL. Data transfer can be one-way or bidirectional.

Does it support what-if planning?

Yes. An optional Simulation license allows users to run planning scenarios and save snapshots for evaluation.

Which platforms does it support?

The listed platforms are self-hosted, web, and Windows. Seiki AIR is browser-based and supports a self-hosted web server or Microsoft IIS.

What information is needed before installation?

Users need works orders and routings for discrete manufacturing operations. Standalone users enter them manually.

Facts from Seiki Advanced Planning and Scheduling's own pages

Capacity
Seiki says the Scheduler can handle tens of thousands of operations and describes a schedule containing over thirty thousand operations. · seikisystems.co.uk, 8 Oct 2026
Company history
A Seiki company brochure says Seiki Systems was established in 1992 and specialises in manufacturing execution systems. · seikisystems.co.uk, 9 Oct 2026
Company history and HQ
Seiki says it started in 1992 and lists its address as Olivier House, 18 Marine Parade, Brighton BN2 1TL. · seikisystems.co.uk, 8 Oct 2026
Concurrency limit
The FAQ says a customer typically has one active master scheduler; an optional Simulation license lets other users run scenarios and save snapshots for review. · seikisystems.co.uk, 9 Oct 2026
Data exchange
The EAI page describes SQL views and CSV files as methods for importing data into the Scheduler database. · seikisystems.co.uk, 8 Oct 2026
ERP and database integration
Seiki EAI interfaces with ERP, MRP or PLM systems and other industry-standard databases such as Microsoft SQL, and supports bi-directional data transfer. · seikisystems.co.uk, 9 Oct 2026
ERP and MRP integration
Seiki EAI connects the scheduler to ERP, MRP, PLM, or other databases, with data transfer that can be one-way or bidirectional. · seikisystems.co.uk, 8 Oct 2026
Finite capacity
The scheduler accounts for available resource capacity and only schedules operations when resources are available. · seikisystems.co.uk, 9 Oct 2026
Founded
1992 · seikisystems.co.uk, 28 Sept 2026
Headquarters
Brighton, United Kingdom · seikisystems.co.uk, 28 Sept 2026
Implementation and support
Seiki describes its service as including planning, installation, implementation, customisation, training, and after-sales support. · seikisystems.co.uk, 8 Oct 2026
Installation
Seiki estimates a standard Scheduler installation can take as little as a week, with additional project time for third-party interfaces. · seikisystems.co.uk, 9 Oct 2026
License limits
The Scheduler is licensed per resource, and Seiki states there is no limit to the number of resources that can be added. · seikisystems.co.uk, 8 Oct 2026
Optional capability
An optional Simulation license lets users run planning scenarios and save snapshots for evaluation by the master scheduler. · seikisystems.co.uk, 8 Oct 2026
Planning board
Interactive graphical planning views show the loading of active orders and production information for individual operations. · seikisystems.co.uk, 9 Oct 2026
Platform
Seiki AIR is browser-based, runs on almost any device with a browser, and supports a self-hosted web server or Microsoft IIS. · seikisystems.co.uk, 9 Oct 2026
Prerequisites
Before installation, users need works orders and routings for discrete manufacturing operations; standalone users enter this information manually. · seikisystems.co.uk, 8 Oct 2026
Purpose
Seiki Scheduler creates production plans using actual capacity to help manufacturers improve on-time delivery, respond to changes and utilise production resources. · seikisystems.co.uk, 9 Oct 2026
Scale
The Scheduler can handle tens of thousands of operations, though saving changes takes longer as the database grows. · seikisystems.co.uk, 9 Oct 2026
Scenario analysis
Users can create what-if scenarios and compare saved schedule snapshots before applying a preferred plan. · seikisystems.co.uk, 8 Oct 2026
Scheduling rules
Built-in sequencing rules can be compared in scenarios before applying a selected rule to the live schedule. · seikisystems.co.uk, 9 Oct 2026
Security
Seiki says each Seiki AIR release includes current security protocols and patches, with authentication procedures intended to prevent unauthorised access. · seikisystems.co.uk, 9 Oct 2026
Standalone use
The Scheduler can be used without an ERP system, with works orders, operations and routing templates entered directly in the software. · seikisystems.co.uk, 9 Oct 2026
Support and updates
Customers with a current maintenance contract are entitled to the latest software release and can request it from Seiki Support. · seikisystems.co.uk, 9 Oct 2026