Hardware FixRecommendedDevice not working? Your driver may be the problemCheck updates for common hardware issues.Fix DriversOctober DealsAmazon USOctober deal check: compare before you payAmazon US: current deals, useful picks and tech finds.Check DealsSlow PC?RecommendedPC slow today? Run a repair scan before it gets worseResolve common Windows issues and optimize system performance.Scan Now×
Skip to content
World desk4 min

Hyderabad Airport Upgrade: What’s Built and What’s Planned

Hyderabad’s RGIA has a 34 MPPA integrated terminal today. AERA is considering proposals for a 40 MPPA southern precinct and a northern terminal that would take proposed combined capacity to 60 MPPA.
Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

Rajiv Gandhi International Airport (RGIA), Hyderabad, has already expanded its southern terminal, but the next major passenger-capacity increase is still at the proposal stage. The airport’s existing integrated terminal is rated at 34 million passengers per annum (MPPA); submitted plans would raise the southern precinct’s target to 40 MPPA and add a northern terminal to bring the combined proposed capacity to 60 MPPA. The operator’s separate master plan envisages more than 100 MPPA over the long term.

What does the Hyderabad airport upgrade include?

The term “upgrade” covers several different stages, not one newly announced construction contract. The eastern and western parts of the existing terminal have been expanded, cargo facilities and passenger-information services have been added, and the airport operator has submitted plans for further terminal and airside development.

The key distinction is between completed facilities and proposals under regulatory consideration. The Airports Economic Regulatory Authority of India (AERA), in a consultation paper dated 19 June 2026, examined GMR Hyderabad International Airport Limited’s (GHIAL’s) plans for the 2026–31 Fourth Control Period. The paper invites stakeholder comments; it is not a final tariff order or confirmation that every proposed project has construction approval.

How do the 34, 40, 60 and 100 MPPA figures differ?

These figures describe different scopes and stages. MPPA means million passengers per annum; it is a design or planned capacity figure, not the number of passengers the airport currently handles.

Free tools Windows power users keep installed

One-click scans. No signup required.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
#1 Best Overall
LEGO City Airport with Airplane 60502
  • AIRPLANE TOY FOR KIDS – Playtime takes flight with the LEGO City Airport with Airplane (60502) building toy for kids ages 8 years old and up
  • WHAT'S IN THE BOX – Includes everything kids need to build a toy airport terminal, sleek passenger airplane toy with fold-down stairs, jet bridge and airport tug
  • PRETEND PLAY POSSIBILITIES – Kids can pass luggage through the toy scanner, rotate the walk-through metal detector to display an X-ray skeleton, change the departure display and help their plane push back from the gate
  • 9 MINIFIGURES & ACCESSORIES – Playset includes 9 minifigures with fun LEGO accessories like 3 suitcases, 2 boarding tickets, marshaling wands, a sunflower lanyard, passport, newspaper, map and croissant
  • GIFT FOR BOYS & GIRLS – Makes a great birthday gift or anytime treat for kids who love airplane toys, building toys and creative pretend play
Figure What it describes Status and source
30.48 million passengers RGIA passenger traffic in FY 2025–26 Actual annual traffic reported by AERA in its 19 June 2026 consultation paper.
34 MPPA Capacity of the existing integrated terminal Capacity after the eastern and western terminal expansions, as reported by AERA in 2026.
40 MPPA Proposed enhanced capacity for the southern precinct AERA’s consultation paper considers this achievable with GHIAL’s proposed process and infrastructure changes, including peak spreading above roughly 37 MPPA. It is not evidence that the enhancement is complete.
20 MPPA Design capacity of the proposed northern passenger terminal GHIAL submission described in AERA’s 2026 consultation paper.
60 MPPA Combined proposed capacity of the southern and northern precincts AERA’s paper totals the proposed 40 MPPA southern capacity and 20 MPPA northern terminal capacity. This is a proposed development stage, not current airport capacity.
Over 100 MPPA Ultimate phased capacity in the airport’s master plan Long-term ambition described by RGIA/GHIAL, involving multiple runways and terminals; it is not the same project or schedule as the proposed 60 MPPA phase.

What has already been completed at the southern terminal?

AERA reports that the eastern terminal expansion opened in November 2023 and the western expansion in September 2024. Following those works, the integrated terminal totals 379,370 square metres and has a stated design capacity of 34 MPPA. AERA identifies 258,089 square metres as the added expansion area; that is distinct from the total area of the resulting integrated terminal.

GHIAL’s next southern-precinct proposal aims to increase the existing terminal’s stated capacity from 34 to 40 MPPA. The measures considered in AERA’s paper include baggage-handling and baggage-management upgrades, transfer-baggage storage, check-in reconfiguration, more security-screening capacity, greater flexibility at baggage reclaim, additional aircraft stands and related operational work. AERA’s assessment says stable performance may be maintained at about 37 MPPA after interventions, while reaching 40 MPPA depends on process improvements and spreading demand across peak periods.

Rank #2
JYLWSMHU City Passenger Airplane Building Blocks Set with Plane,Airport, Terminal and Trailer Creative Building Model Gift for Adults Aviation Lovers Idea 652PCS
  • Build a Complete Airport Scene:This airport building blocks set goes far beyond a single airplane model. It includes a large aircraft, terminal, control tower, and multiple ground vehicles, allowing you to create a complete and realistic airport environment. Instead of building just one piece, you can bring together different elements to form a busy airport scene that feels alive, making it more engaging to build, display, and interact with over time
  • More Than a Simple Building Kit:This is not just a plane model, but a full airport playset designed for a more immersive experience. Create takeoff and landing scenes, manage passenger flow, and organize ground operations with different vehicles. The variety of components keeps the experience dynamic, so it does not feel repetitive and gives you more ways to enjoy the set long after the build is complete
  • Designed for Aviation Enthusiasts:Created for those who enjoy airplanes, travel themes, and hands on building projects. Whether you are interested in aviation or simply enjoy assembling detailed models, this set offers a rewarding experience. It works well as a personal project, a shared activity, or even a display piece for anyone who appreciates creative builds and transportation themed designs
  • STEM Inspired Creative Play:This building set encourages problem solving, spatial awareness, and imaginative thinking through hands on construction. As you assemble different parts and structures, you naturally develop focus and coordination while staying engaged in a creative process. It combines the fun of building with meaningful skill development, making the experience both enjoyable and worthwhile
  • Great Gift That Stands Out:A thoughtful choice for birthdays, holidays, or special occasions when you want something more than a typical gift. With its detailed design and complete airport theme, this set offers both building satisfaction and long term play value. It is especially appealing to anyone interested in airplanes, vehicles, or creative building sets, making it a gift that feels unique and memorable

What is proposed for the northern precinct?

GHIAL’s submission, as reproduced in AERA’s consultation paper, proposes a passenger terminal of about 225,000 square metres with a design capacity of 20 MPPA. It would handle domestic and international passengers and be arranged to allow modular expansion. The submission lists these terminal provisions:

  • Four entry gates and 112 check-in counters.
  • Sixteen automatic tray return system (ATRS) lanes and 19 fixed-link passenger bridges.
  • Seven bus gates and eight baggage-claim belts.
  • Thirty immigration counters.

The northern development is broader than a terminal building. The submitted precinct plan also includes a new runway north of the existing runway, taxiways, aprons, navigational aids, an elevated cross-taxiway and other airside connections, as well as access and landside work. These are submission details under consultation, not a list of facilities already open or confirmed as under construction.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Rank #3
Sale
HOGOKIDS City Airport Airplane Building Set with LED Light, 901 PCS
  • LARGE PASSENGER AIRPLANE TOY SET - This HOGOKIDS passenger airplane building blocks set includes a large passenger airplane, luggage trailer and mobile stairway, baggage conveyor belt loader, radar tower, well-designed airport terminal, and many fun stickers. This exclusive airport playset vividly restores the grand busy airport in real life. Kids can give full play to their imagination in several hours of building and gain an unforgettable flight experience!
  • AMAZING PLANE MODEL WITH LED LIGHT - This unique boys building blocks set features with led light, which presents an enchanting lighting effect, a vivid recreation of the airport at night. This city airplane building toy set contains lots of details, removing the aircraft’s roof to access its detailed cockpit, seating, aisle, catering area and toilet. The front and rear cabin door of the airplane are open-able. Once the cabin door is fully open it is perfectly connected to the boarding stairs, baggage conveyor belt.
  • ELABORATE AIRPORT TERMINAL BUILDING KIT - This realistic airport terminal building set consists of three parts, the departure terminal and VIP lounge, the airport tower. The VIP lounge includes security machines, LED display, and boarding gate; the VIP lounge includes coffee and magazines, as well as a dining table; the airport tower includes an airport control console. In addition to the rich interior details, this plane building block set comes with a wealth of colourful stickers that your child will surely love!
  • KIDS SAFETY ALWAYS COMES FIRST - This large plane building set are made of high quality ABS material, non-toxic and odorless, sturdy enough. Vibrant colors and realistic looking amplify the fun of building up this city passenger airplane model. The process of building this STEM building toy for boys age 6 7 8 9 10 11 12 years old can stimulate their curiosity and creativity, improve their imagination and spatial thinking skills. With the guidance of the attached illustrated manual, boy can easily assemble a complete airplane.
  • GIFTS FOR KIDS AND ADULTS - The large size of this well-packaged airplane model toy is 21.1 inches long, 6.7 inches high. If your families/friends are model aviation enthusiasts, then this aircraft building blocks kit will be the perfect choice as a holiday or birthday gift for them. This is not only a unique airplane plane aircraft model for collection, but beautiful desktop decoration. You can display it in the study, bedroom, living room or office.

When will the northern terminal open?

The available AERA consultation paper describes GHIAL’s capital plan for the Fourth Control Period, which runs from 1 April 2026 to 31 March 2031, but it does not establish a firm opening date for the northern terminal or a delivery date for the full master plan. AERA says it will consider evidence-based stakeholder comments before issuing a final tariff order for aeronautical services. The consultation stage should not be read as final approval of every project or a guaranteed construction timetable.

What else has changed for cargo and passengers?

Cargo Terminal 2

GHIAL announced Cargo Terminal 2 as commissioned on 18 May 2026. The operator gives its area as 16,864 square metres and its initial handling capacity as around 50,000 metric tonnes per annum, with dedicated space intended to allow capacity to double to 100,000 tonnes. GHIAL describes separate inbound and outbound zones, multi-level racking, shipment build-up and breakdown areas, and temperature-controlled space for pharmaceuticals and perishables.

Rank #4
Sale
WINGIFT 880 Pcs City Airport Passenger Terminal Building Set, 6 in 1 Airplane Building Blocks Toy, STEM Aircraft Bricks with Shuttle Bus,Luggage Cart,Planes Model Toys Gifts for Boys Girls Ages 6-12+
  • 【6 IN 1 Airplane Toy Building Set】Build an exciting space shuttle toy model for kids 6-12 year olds. This WINGIFT passenger airplane building block set includes a large aircraft, passenger vehicles, luggage truck, boarding stairs and other building kits. One toy set can be transformed into 6 different styles of airplane model , vividly restoring the large and busy airport in real life, allowing children to enjoy an unforgettable flight experience in hours of construction
  • 【Exquisite airport terminal building kit】This realistic airport terminal building kit consists of three parts, including the terminal, VIP lounge and airport tower. The VIP lounge includes security check machines, LED display screens and boarding gates,the VIP lounge includes dining tables, beverage cabinets and magazines, and the airport tower includes an airport control console. In addition to the rich interior details, this airplane building block set also comes with rich colorful stickers, providing children with a wealth of creative imagination space
  • 【Detailed Design】The streamlined fuselage, eagle wings and tail of the large plane not only make the aircraft look more modern and refined, but also inspire children's interest in aviation technology.In the process of building the airport,use your imagination to create different scenes,imitating daily airport operations such as aircraft takeoff, landing,boarding and baggage handling.This immersive way of playing helps to improve children's spatial perception,hands-on ability and teamwork spirit
  • 【Kids Safety Always Comes First】This large airplane building block set is made of high-quality ABS material, which is non-toxic, odorless, sturdy and durable. The bright colors and realistic appearance enhance the fun of building this city airliner model. This STEM building toy for boys ages 6-12 can stimulate their curiosity and creativity during the construction process, improve their imagination, and enhance their logical thinking ability and confidence in problem solving
  • 【Gifts for Kids and Adults】This airport toy set is beautifully packaged, with fine details, and is 100% compatible with all major brand building blocks. If your family/friends are model aviation enthusiasts, it will be a nice holiday gift when you bring the city airplane building block toys to parties, birthdays, Valentine's Day, Easter, Thanksgiving, Halloween, Christmas and other occasions. This is not only a unique aircraft model for collection, but also a beautiful desktop decoration. You can display it in your study, bedroom, living room or office

Information kiosks and terminal maps

In August 2025, GMR/GHIAL announced a rollout of ten virtual information kiosks across check-in, boarding, arrivals and baggage-claim areas, alongside interactive online terminal maps. Announced functions include real-time flight information, 3D navigation, emergency support, Wi-Fi access for international travellers and feedback options. The announcement describes the services and intended functions; it does not establish a measured reduction in queues or improvement in passenger satisfaction.

Independent reader supportYour contribution helps us test, update, and keep practical guides available for everyone.Support on Ko-Fi

What sustainability rating did the expanded terminal receive?

GHIAL says the expanded terminal received LEED Platinum under LEED v4 with 84 points. Its 2025 certification announcement lists high-efficiency HVAC, insulation, occupancy-sensor LED lighting, rainwater harvesting, low-flow plumbing, drought-tolerant landscaping, paperless e-boarding and self-baggage drop among the measures. This is the operator’s account of the terminal’s certification and features; it does not by itself establish a quantified reduction in airport-wide emissions.

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.
Best Value
CUBIMANA 21-Inch Large City Passenger Airplane Building Set with LED Light
  • 【LARGE SIZE】 This large plane building toy measures 21 inches long and 6.7 inches tall. In addition, this realistic airport building set includes a large terminal and an airport tower, as well as two baggage trucks. This well-designed plane's streamlined fuselage, eagle wings and elegant tail design all contribute to its graceful appearance in the blue sky. It is not only a means of transport, but also a symbol of the desire for the blue sky and exploration.
  • 【LED LIGHT】This aircraft building block set features with an innovative light design to make your model aircraft sparkle in the dark. The moment your kid lights up, the warm glow spills out through the plane's windows, creating a cosy and mysterious atmosphere. Kids can imagine themselves as the owner of this plane, enjoying their own little world in the quiet night.
  • 【RICH DETAILS】This city airplane building toy set includes tons of details, removing the top cover of the plane reveals the cockpit, seating, aisle, dining area, and bathroom. When the cabin door is fully open, it connects perfectly with the boarding stairs and baggage conveyor belt. There are security check machines, LED screens and boarding gate in the terminal building lobby. The VIP lounge is equipped with a coffee machine, magazine rack and dining table. There are more amazing details waiting to be discovered!
  • 【SAFE MATERIAL】This plane building set for boys age 6 7 8 9 10 11 12 years old are made of high quality ABS material with smooth edges and no burrs, won't hurt your kids hands. This aircraft building blocks sets can stimulate their curiosity and creativity, improve their imagination and spatial thinking skills. With the guidance of the colorful and easy understanding illustrated manual, kids can assemble a complete airplane on their own.
  • 【GIFTING CHOICE】If your families/friends are model aviation enthusiasts, then this one and only airplane plane aircraft model will be a treat for them! This exclusive airport playset restores the grand busy airport in real life. Kids can give full play to their imagination in several hours of building and gain an unforgettable flight experience! It will be a nice holiday gift, birthday gift, Christmas gift for both kids and adults any age.

How should travellers interpret the upgrade plans?

For passengers, the terminal expansion and announced information tools are existing changes, while the further capacity increases remain contingent on proposals and later decisions. The 40 MPPA figure refers to the southern precinct’s enhancement case; 60 MPPA includes the proposed northern terminal; and the over-100-MPPA figure belongs to the airport’s long-range, phased master plan. None of those capacity figures alone establishes a particular wait time, fare, or travel experience.

Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

Leave a Reply

Your email address will not be published. Required fields are marked *

Special offer. See more information about Outbyte and uninstall instructions. Please review EULA and Privacy policy.

More from the Wire

  1. Shenzhen desk3 min
    HONOR Expands Beyond Smartphones With Humanoid Robot RevealHONOR said it unveiled its first humanoid robot at MWC 2026 and named shopping assistance, workplace inspections, and supportive companionship as intended uses. Later Robotics D1 claims and a reported…
  2. Cupertino desk5 min
    Apple Unveils AirPods Max 2: The Upgrade That Should Have Happened Years AgoAirPods Max 2 adds H2-powered audio features and Apple claims up to 1.5× more effective ANC, but its design, Smart Case, and 20-hour battery rating are unchanged. Wired lossless audio…
  3. Cupertino desk4 min
    Apple’s OLED Touch MacBooks Are Coming—but the Dynamic Island Is the Real GambleApple has not announced an OLED touchscreen MacBook, but reports point to high-end models arriving in late 2026 or early 2027. The reported Mac Dynamic Island could be useful, but…
Recommended PC Tool
Recommended PC Tool
Crashes, No Sound, or Screen Glitches?Free driver scan
PC Slower Than It Used to Be?Free scan - under a minute

Two free Windows tools

One Free Minute Could Fix That PC

Before you go - each of these free tools takes about a minute and tackles what quietly slows a Windows PC down.

Special offer. View Outbyte info, uninstall instructions, EULA, and Privacy Policy.