Some links on this page are affiliate links: if you buy through them we may earn a commission, at no extra cost to you.
NASA announced two Crew-12 news conferences on January 23, 2026, ahead of the planned SpaceX Dragon mission to the International Space Station. The briefings were scheduled for January 30 at Johnson Space Center in Houston. Crew-12 subsequently launched successfully on February 13, 2026, after its target date changed during final mission planning.
What NASA announced
NASA’s January 23 announcement was a media advisory for two pre-launch news conferences—not a launch-success announcement, a new crew-assignment announcement, or final launch clearance.
The agency said the briefings would cover mission preparations and give reporters an opportunity to question the assigned crew. NASA later updated the advisory on January 27 to reflect changes to the Mission Overview panel.
Read NASA’s briefing advisory.
Briefing schedule
| Date | Time | Event | Purpose |
|---|---|---|---|
| January 30, 2026 | 11 a.m. EST | Mission Overview News Conference | Mission leadership discussed preparations and the launch plan. |
| January 30, 2026 | 1 p.m. EST | Crew News Conference | The four Crew-12 astronauts and cosmonaut discussed the mission. |
Both events were scheduled from NASA’s Johnson Space Center in Houston. NASA noted that the timing could change because of real-time mission operations. The agency announced online streaming through its digital channels, including its YouTube channel.
#1 Best Overall
- HOBBY MODEL KIT – Unassembled model packed in an envelope with easy to follow instructions. Ideal for ages 14 and up.
- NO GLUE OR SOLDER NEEDED – Parts can be easily clipped from the metal sheets. Tweezers are the recommended tool for bending and twisting the connection tabs.
- PREMIUM SERIES SPACE SHUTTLE LAUNCH KIT - 3 Sheet Model with a moderate difficulty level. Once assembled, dimensions are 3.54 W x 4.13 L x 6.70 H inches. 1:342 Scale.
- FROM STEEL SHEETS TO 3D – Pop out the pieces and connect using tabs and holes. Includes illustrated instructions
- HIGHLY DETAILED ETCHED MODEL – Display your 3D model once completed - collect and build them all.
Who participated?
Mission Overview News Conference
- Ken Bowersox — NASA associate administrator, Space Operations Mission Directorate
- Steve Stich — manager, NASA Commercial Crew Program
- Dina Contella — deputy manager, NASA International Space Station Program
- Andreas Mogensen — European Space Agency Human Exploration Group leader
- Lee Echerd — SpaceX senior mission manager, Human Spaceflight Mission Management
The lineup reflected the mission’s broader responsibilities. Crew-12 was a NASA-contracted Commercial Crew flight, but its operations involved NASA, SpaceX, ESA, Roscosmos, and the international space station partnership.
Crew News Conference
- Jessica Meir — NASA astronaut and Crew-12 commander
- Jack Hathaway — NASA astronaut and pilot
- Sophie Adenot — ESA astronaut and mission specialist
- Andrey Fedyaev — Roscosmos cosmonaut and mission specialist
NASA identifies Crew-12 as the agency’s 12th crew-rotation mission using SpaceX’s human-space-transportation system. It was also the 13th Dragon flight carrying astronauts when NASA’s Demo-2 test flight is included in the count.
NASA’s Crew-12 mission page provides the agency’s mission and crew details.
Free tools Windows power users keep installed
One-click scans. No signup required.
Why NASA considered moving the launch earlier
NASA and its partners evaluated an earlier Crew-12 launch after the early return of Crew-11. That return followed a medical issue involving one Crew-11 crew member and left the International Space Station operating with a reduced crew complement.
Rank #2
- Replica of the tile structure
- Detailed cockpit
- Cockpit canopy optionally removable
- 2 crew figures
- Opening cargo bay doors
The connection should be stated carefully: NASA’s official updates described an evaluation of options to advance Crew-12, while secondary reporting linked the accelerated planning to the reduced station staffing. The January 23 advisory did not establish that one medical event alone determined the eventual launch date.
An earlier crew-rotation flight could restore staffing for station research, maintenance, and routine operations sooner. However, moving a human-spaceflight launch forward still required spacecraft processing, crew quarantine, training, range coordination, weather assessment, and formal readiness reviews.
The launch schedule changed several times
The dates reported during the campaign were successive targets, not contradictory launch announcements:
Recommended Free Tools
| Date | Development |
|---|---|
| January 12 | NASA and SpaceX invited media to follow the mission and discussed a possible February 15 launch target. |
| January 23 | NASA announced the two January 30 briefing sessions. |
| January 27 | NASA updated the Mission Overview participant lineup. |
| January 30 | The Mission Overview and Crew news conferences were scheduled at Johnson Space Center. |
| February 6 | NASA announced coverage for a then-current February 13 launch target. February 11 had also been discussed during the shifting schedule. |
| February 6–11 | The crew arrived in Florida, completed preparations and a dry dress rehearsal, and proceeded through readiness reviews. |
| February 13 | Crew-12 launched successfully. |
The final announced launch target was 5:15 a.m. EST on February 13, 2026, from Space Launch Complex 40 at Cape Canaveral Space Force Station in Florida.
Rank #3
- RELIEVE THE HISTORIC MISSION - Experience the magic and majesty of the 1981 Space Shuttle launch. This isn't just a model; it's a time machine for your desk, capturing the awe and ambition of a defining moment in space exploration history.
- DYNAMIC, INTERACTIVE LAUNCH SEQUENCE - Be the mission commander! A simple touch activates the mesmerizing automated launch sequence. Watch the service structure move, see the shuttle tilt into position, follow the countdown lights, and feel the thrill as the rocket engines ignite with a brilliant orange and blue LED glow.
- PERFECT GIFT FOR EVERY DREAMER & OCCASION - Designed for display, engineered for wonder. This stunning wooden model becomes the centerpiece of any office, study, or living room. It’s the unforgettable gift for birthday, Christmas, Thanksgiving Day, Father’s Day, graduations, and retirements. Perfect for space enthusiasts, engineers, collectors, and anyone who dares to dream big.
- SATISFYING BUILD & PREMIUM MATERIALS - Enjoy a rewarding building experience with 446 precisely laser-cut wooden pieces that fit together smoothly. The assembly is an engaging 8-hour journey, resulting in an impressive display measuring 9.8" x 7.72" x 10.71". While this is a challenging project designed for enthusiasts, our clear, step-by-step instructions make the process achievable and deeply satisfying. All you need is patience to transform pieces into a functional masterpiece.
- COMPLETE READY-TO-BUILD KIT & WORRY-FREE SUPPORT - Everything you need to build and display is in the box. Note: Powered by a Type-C cable(not included) as part of our sustainability efforts but is commonly available. Our customer support proudly offers free replacement pieces for any missing or damaged wooden pieces, ensuring a smooth and enjoyable building experience.
Sources include NASA’s January 12 media advisory and February launch coverage advisory.
From briefing to launch
The January briefings were one step in a larger readiness process. Subsequent milestones included:
- Crew arrival in Florida: The astronauts and cosmonaut reached the launch area for final preparations.
- Quarantine and training: The crew completed the final health and mission-readiness activities required before launch.
- Dry dress rehearsal: The crew practiced wearing spacesuits, traveling to the pad, boarding Dragon, and completing the associated ground procedures.
- Flight Readiness Review: NASA, SpaceX, and mission partners assessed whether the Falcon 9, Dragon, ground systems, and operations were ready.
- Launch Readiness Review: Teams completed the final assessment before proceeding toward liftoff.
NASA reported the crew’s arrival in Florida, the dry dress rehearsal, the Flight Readiness Review, and the Launch Readiness Review separately.
Crashes, No Sound, or Screen Glitches?
Random freezes, missing sound and display glitches usually trace back to one bad driver. Find and replace yours safely.Free scan · under a minutePC Slower Than It Used to Be?
A free scan shows the junk files, broken settings and background clutter dragging Windows down - then fixes them in one click.Free scan · Windows 10 & 11Mission profile
Crew-12 was an International Space Station crew-rotation and science mission, not a private tourism flight. A SpaceX Falcon 9 carried the Dragon spacecraft from SLC-40 to orbit. Dragon then traveled to the station for crew handover, research, maintenance, and station operations.
Rank #4
- The most innovative modeling company in the industry. We engineer and produce a variety of kits from classic cars to giant space ships.
- Our die cast models are next level – when it comes to detail we are the best in the collectible business
- Racing is in our company DNA, our slot car brands and themes keep creativity racing around this retro hobby
- The newest hobby to our line up. Our detailed pieces bring your train layouts to life.
- South Bend, IN
NASA’s February coverage plan listed docking for approximately 3:15 p.m. EST on February 14, subject to mission operations. The final launch and mission details are available on the SpaceX Crew-12 mission page.
Where viewers could follow the coverage
NASA announced coverage through NASA+, NASA’s YouTube channel, Amazon Prime, and other NASA social and digital platforms.
The January 30 news conferences were distinct from the later launch and docking broadcasts. NASA was the best source for agency briefings, crew-rotation context, and station operations; SpaceX provided first-party launch and vehicle timeline information.
What’s actually slowing this PC down?
Pick the symptom - the matching free tool is one click away.
Why the briefings mattered
The two sessions gave viewers different kinds of information. The mission leadership panel addressed schedule pressure, readiness, station operations, and coordination among the participating organizations. The crew panel focused on the astronauts’ roles and the human side of the flight.
The briefings also provided a snapshot of how Commercial Crew missions work: SpaceX supplied the Falcon 9 and Dragon transportation system, while NASA managed the contracted crew-rotation mission and ISS objectives alongside international partners.
Because the launch schedule was still fluid on January 23, the briefings should not be read as proof that every technical gate had been cleared. Those approvals came through later reviews, and Crew-12 ultimately launched on February 13, 2026.
Quick Recap
Product prices and availability are accurate as of the date/time indicated and are subject to change. Any price and availability information displayed on Amazon at the time of purchase will apply.

